BridgeReportCard
Home › Alabama › Perry County › Cookie Man Rd over Polecat Creek

Cookie Man Rd over Polecat Creek

Perry County, Alabama · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (32.70203, -87.46047)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck88Very good condition
Superstructure88Very good condition
Substructure77Good condition

Bridge details

StructureContinuous steel stringer or multi-beam girder
Lengthabout 54 ft
LocationCookie Man Rd N AL14
NBI structure number020301
Condition classGood
Traffic status (item 41)Posted for load
Last inspection (item 90)September 2024
Inspection interval (item 91)24 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour

Source: FHWA National Bridge Inventory, 2025 data as reported by the Alabama department of transportation.

Busiest bridges in Perry County

BridgeBuiltVehicles/dayCondition
CR 45 over Al 519563,430Fair
Al 5 over Taylor Creek19583,318Fair
Al 5 over Wallace Creek19583,112Fair
Al 5 over Rice Creek19553,070Fair
Al 5 over Ut Cahaba River19582,940Fair
Al 5 over Ellard Creek19582,940Fair

All bridges nearby: Perry County, AL bridge conditions · every bridge in Perry County · Alabama bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.