BridgeReportCard
Home › California › San Diego County › Mitscher Way over Rose Creek

Mitscher Way over Rose Creek

San Diego County, California · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (32.88, -117.13075)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Culvert66Satisfactory condition

Bridge details

StructureConcrete culvert
Lengthabout 28 ft
Location1.5KM South of Miramar Rd
NBI structure number2CA7555
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)June 2023
Inspection interval (item 91)24 months
Scour (item 113)5: foundations stable, scour within the limits of the footing or piles

Source: FHWA National Bridge Inventory, 2025 data as reported by the California department of transportation.

Busiest bridges in San Diego County

BridgeBuiltVehicles/dayCondition
Interstate 15 over Mira Mesa Blvd1977283,000Fair
Interstate 805 over Bonita Road1975272,000Fair
Interstate 805 over Telegraph Canyon Road1971254,000Good
Interstate 805 over Telegraph Canyon Drain1971250,000Poor
Interstate 5 over San Elijo Lagoon2022247,000Good
Interstate 5 over Carmel Valley Rd1964245,000Good

All bridges nearby: San Diego County, CA bridge conditions · every bridge in San Diego County · California bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.