BridgeReportCard
Home › Florida › Hamilton County › SR-6 over Withlacoochee River O/f

SR-6 over Withlacoochee River O/f

Hamilton County, Florida · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (30.4846, -83.23784)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 524 ft
Location0.4 Mi.e.of Withlacoochee
NBI structure number320017
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)October 2023
Inspection interval (item 91)24 months
Scour (item 113)5: foundations stable, scour within the limits of the footing or piles

Source: FHWA National Bridge Inventory, 2025 data as reported by the Florida department of transportation.

Busiest bridges in Hamilton County

BridgeBuiltVehicles/dayCondition
I-75 (SR-93) over Tiger Creek196140,000Fair
I-75 (SR-93) over Dry Creek196140,000Fair
I-75 (SR-93) over Camp Branch Creek196240,000Good
I-75 SB SR-93 over Alapaha River196221,500Fair
I-75 SB (SR-93) over SR-6196121,500Fair
I-75 NB SR-93 over Alapaha River196221,500Fair

All bridges nearby: Hamilton County, FL bridge conditions · every bridge in Hamilton County · Florida bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.