BridgeReportCard
Home › Illinois › Piatt County › Tr 129 over Lake Fork Drain Dit

Tr 129 over Lake Fork Drain Dit

Piatt County, Illinois · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (39.9667, -88.53284)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck77Good condition
Superstructure66Satisfactory condition
Substructure55Fair condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 23 ft
Location4 Mi SE Monticello
NBI structure number074309000000000
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)November 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Illinois department of transportation.

Busiest bridges in Piatt County

BridgeBuiltVehicles/dayCondition
I-74 over Madden Creek Trib197122,800Good
I-74 over Madden Creek Trib197122,800Fair
I-74 over Stream197021,500Fair
I-72 over Stream197611,400Fair
I-72 over Wolf Run197611,400Fair
I-74 (EB) over S Branch Salt Creek197010,750Fair

All bridges nearby: Piatt County, IL bridge conditions · every bridge in Piatt County · Illinois bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.