BridgeReportCard
Home › Tennessee › Sevier County › I40 over Hickman Road

I40 over Hickman Road

Sevier County, Tennessee · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (35.98518, -83.64481)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck77Good condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructureContinuous concrete tee beam
Lengthabout 138 ft
Location2.1 Mi W Jct SR66
NBI structure number78I00400001
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)January 2025
Inspection interval (item 91)24 months
Scour (item 113)N: not over a waterway

Source: FHWA National Bridge Inventory, 2025 data as reported by the Tennessee department of transportation.

Busiest bridges in Sevier County

BridgeBuiltVehicles/dayCondition
I40 over Hickman Road197284,952Good
I40 over Tuckahoe Branch197584,952Fair
I40 over Tuckahoe Branch197584,952Fair
I40 over SR 139197584,952Good
I40 over SR 139197584,952Good
I40 over Bryan Road197577,977Good

All bridges nearby: Sevier County, TN bridge conditions · every bridge in Sevier County · Tennessee bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.