Bridge conditions in Kenai Peninsula Borough, Alaska

102 inventoried bridges · 6 closed · 10 posted · 13 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 102 bridges.

About one in 8 bridges in Kenai Peninsula Borough is rated in poor condition: 13 of 102 on the federal inventory, one of the higher shares in Alaska.

What this page is: the federal bridge inspection inventory for Kenai Peninsula Borough: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 38.2% · Fair 49.0% · Poor 12.7% of 102 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
2
newly closed or posted
2 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Irr Bia Rte 8PGH over Unnamed Creeknewly closedPoorPoor5
Irr Bia Rte 1048 over Windy Creek Rightnewly closedPoorPoor2
Marine Hwy Route over Homer City Dockdeck 7 to 6; superstructure 8 to 6FairFair850
Irr Bia Rte 1029 over Swampy Ponddeck 7 to 6FairFair200

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Quartz Creek Road over Quartz Creekload posting removed; poor to good; deck up 5 to 9; superstructure up 4 to 9; substructure up 5 to 9PoorGood210
Williamsport/pile over Four Mile Creekfair to good; substructure up 6 to 7FairGood20

no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Irr Bia Rte 1026 over Unnamed Creedclosed199710June 2023Poor
Irr Bia Rte 1026 over Unnamed Creekclosed199710June 2023Poor
Irr Bia Rte 8PGH over Unnamed Creekclosed19975June 2023Poor
Irr Bia Rte 8PGH over Unnamed Creekclosed19975June 2023Poor
Irr Bia Rte 8PGH over Unnamed Creekclosed19975June 2023Poor
Irr Bia Rte 1048 over Windy Creek Rightclosed19972June 2023Poor
Lowell Point Road over Lowell Creekposted for load1991950August 2023Fair
Quartz Creek Road over Crescent Creekposted for load1959100August 2023Fair
Brody Lane over Ninilchik Riv Brody Lnposted for load200350August 2023Good
Running Water Ave over Crooked Creekposted for load200650August 2023Fair
Kenai Spur Hwy Ext over Lief Creekposted for load200720October 2023Fair
Kenai Spur Hwy Ext over Otter Creekposted for load200720October 2023Fair
Williamsport/pile over Four Mile Creekposted for load198320July 2024Good
Chakok Road over North Fork Anchor Riverposted for load198710August 2023Fair
Dorothy Drive over North Fork Anchor Riverposted for load198710August 2023Fair
No Data Entered over Palmer Creekposted for load195710September 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 101 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Kenai Peninsula Borough is dated September 2024; 7 bridges have an inspection dated in 2024.

Scour critical (item 113): 15 bridges; 7 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 4 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Sterling Highway over Kenai River (schooners)open19542,900August 2023Fair
Nash Road over Salmon Creekopen19721,180August 2023Fair
Kenai Spur over Swanson Riveropen1966260August 2023Fair
Bruno Road over Glacier Fk of Salmon CRopen1986100August 2023Fair
Brody Lane over Ninilchik Riv Brody Lnposted for load200350August 2023Good
Running Water Ave over Crooked Creekposted for load200650August 2023Fair
Kenai Spur Hwy Ext over Lief Creekposted for load200720October 2023Fair
Kenai Spur Hwy Ext over Otter Creekposted for load200720October 2023Fair
Tall Trees Road over Stariski Creekopen199620October 2023Fair
Williamsport/pile over Chinkelyes Creekopen200220July 2024Fair
Williamsport/pile over Four Mile Creekposted for load198320July 2024Good
Chakok Road over North Fork Anchor Riverposted for load198710August 2023Fair
Dorothy Drive over North Fork Anchor Riverposted for load198710August 2023Fair
Irr Bia Rte 1026 over Unnamed Creekclosed199710June 2023Poor
Lee Roy Avenue over Henry Creekopen200510October 2023Fair

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Irr Bia Rte 1026 over Unnamed Creekclosed199710June 2023Poor
Irr Bia Rte 8PGH over Unnamed Creekclosed19975June 2023Poor
Irr Bia Rte 8PGH over Unnamed Creekclosed19975June 2023Poor
Irr Bia Rte 1048 over Windy Creek Rightclosed19972June 2023Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Sterling Highway over South Fork Anchor River19593,490Poor
Funny River Road over Funny River19691,830Poor
Fourth Avenue over Seward Lagoon1960500Poor
Irr:jakolof Bay Rd over Barabara Creek1968110Poor
Nautical Avenue over Salmon Creek Tributary1970100Poor
Irr Bia Rte 1026 over Unnamed Creek199710Poor
Irr Bia Rte 1026 over Unnamed Creed199710Poor
Irr Bia Rte 8PGH over Unnamed Creek199710Poor
No Data Entered over Palmer Creek195710Poor
Irr Bia Rte 8PGH over Unnamed Creek19975Poor
Irr Bia Rte 8PGH over Unnamed Creek19975Poor
Irr Bia Rte 8PGH over Unnamed Creek19975Poor
Irr Bia Rte 1048 over Windy Creek Right19972Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Sterling Highway over Kenai River (soldotna)200715,100Fair
Kenai Riv Crossing over Kenai River (kenai)197410,000Fair
Seward Highway over Resurrection River No 120036,840Good
Seward Highway over Resurrection River No 220036,840Good
Seward Highway over Resurrection River No 320036,840Good
Sterling Highway over Moose River19936,360Good
Sterling Highway over Kasilof River19665,770Fair
Sterling Highway over Crooked Creek20195,770Good
Seward Highway over Canyon Creek19974,268Good
Sterling Highway over Sterling Wildlife UP #620224,240Good

Frequently asked questions

Are any bridges closed in Kenai Peninsula Borough, Alaska?

6 bridges of the 102 in Kenai Peninsula Borough are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.

Have any bridges failed in Kenai Peninsula Borough?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Kenai Peninsula Borough: 4 bridges with a component rated 2 (critical) or lower, 13 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Kenai Peninsula Borough last inspected?

Inspection dates in the 2025 inventory for Kenai Peninsula Borough run from July 2022 to September 2024. Intervals: 1 on 12 months or less, 101 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Kenai Peninsula Borough → - all 102, busiest first, each with its own condition record.

All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.