BridgeReportCard
Home › Alaska › Ketchikan Gateway Borough

Bridge conditions in Ketchikan Gateway Borough, Alaska

107 inventoried bridges · 1 closed · 11 posted · 12 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 107 bridges.

Of the 107 Ketchikan Gateway Borough bridges in the federal inventory, 12 carry a poor rating. That 11.2% share is roughly 2x the national average.

What this page is: the federal bridge inspection inventory for Ketchikan Gateway Borough: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 46.7% · Fair 42.1% · Poor 11.2% of 107 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
1
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
1 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
8330000 over Modnewly closed; deck 5 to 4PoorPoor–

7 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
8330000 over Modclosed1992–June 2024Poor
Park/harris St over Ketchikan Creekposted for load19572,512June 2023Poor
Grant Street over Grant Street Viaductposted for load19701,016June 2023Fair
Spruce Mill Way over Front St/spruce Mill Wayposted for load1969735June 2023Good
Young St/sayles St over Dunton St Viaductposted for load1979565June 2023Fair
Hopkins Alley over Bauer-hopkins Trestleposted for load1950400June 2023Fair
Thomas Street over Thomas Trestleposted for load1960400June 2023Fair
Marine Hwy Route over Ketchikan Berth IIposted for load1986250May 2023Fair
Sayles/gorge St over Sayles/gorge Viaductposted for load196040June 2023Poor
Harding Street over Harding Streetposted for load196830June 2023Poor
Peterson Street over Peterson Streetposted for load195530June 2023Poor
No Data Entered over Modposted for load1989–June 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 2 on 12 months or less, 102 on 24 months, 3 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Ketchikan Gateway Borough is dated October 2024; 32 bridges have an inspection dated in 2024.

Scour critical (item 113): 9 bridges; 2 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 17 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
North Tongass Hwy over Carlanna Creekopen19739,210June 2023Fair
Fair Street over Ketchikan Creek Fair Stopen19672,480June 2023Fair
Park Street over Ketchikan CR Park-upperopen19672,298June 2023Fair
Bostwick Lake Road over Bostwick No. 1open200610June 2023Fair
Bostwick Lake Road over Bostwick No. 2open200610June 2023Fair
Bostwick Lake Road over Bostwick No. 3open200610June 2023Fair
Bostwick Lake Road over Bostwick No. 4open200610June 2023Fair
Bostwick Lake Road over Bostwick No. 5open200610June 2023Fair
Bostwick Lake Road over Bostwick No. 6open200610June 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
South Tongass Hwy over Water St Viaduct195514,046Poor
South Tongass Hwy over Hoadley Creek195711,900Poor
North Tongass Hwy over Ward Creek19755,250Poor
Park/harris St over Ketchikan Creek19572,512Poor
Shelter Cove Road over Harriet Hunt Creek1981125Poor
Sayles/gorge St over Sayles/gorge Viaduct196040Poor
Harding Street over Harding Street196830Poor
Peterson Street over Peterson Street195530Poor
8400000 over Trail # 828400SHOAL19925Poor
No Data Entered over Perm19972Poor
No Data Entered over Mod1989–Poor
8330000 over Mod1992–Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
South Tongass Hwy over Tongass Avenue Viaduct195614,564Fair
South Tongass Hwy over Water St Viaduct195514,046Poor
South Tongass Hwy over Hoadley Creek195711,900Poor
North Tongass Hwy over Carlanna Creek19739,210Fair
South Tongass Hwy over Front Street Viaduct19698,330Fair
South Tongass Hwy over Ketchikan Creek19446,850Fair
South Tongass Hwy over Front and Mill St Viad19736,830Good
North Tongass Hwy over Cannery Creek19895,280Fair
North Tongass Hwy over Ward Creek19755,250Poor
North Tongass Hwy over Whipple Creek19683,440Fair

Frequently asked questions

Are any bridges closed in Ketchikan Gateway Borough, Alaska?

1 bridge of the 107 in Ketchikan Gateway Borough is coded closed to all traffic in the 2025 National Bridge Inventory, and 11 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.

Have any bridges failed in Ketchikan Gateway Borough?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Ketchikan Gateway Borough: no bridges with a component rated 2 (critical) or lower, 12 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Ketchikan Gateway Borough last inspected?

Inspection dates in the 2025 inventory for Ketchikan Gateway Borough run from July 2021 to October 2024. Intervals: 2 on 12 months or less, 102 on 24 months, 3 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Ketchikan Gateway Borough → - all 107, busiest first, each with its own condition record.

All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.