Bridge conditions in Lake and Peninsula Borough, Alaska
10 inventoried bridges · 0 closed · 3 posted · 1 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 10 bridges.
Lake and Peninsula Borough has 1 bridges rated poor out of 10 inventoried, a 10.0% share that puts it well above the national rate of about 7%.
- 1 of the 10 bridges in Lake and Peninsula Borough, Alaska, are rated in poor condition (10.0%) in the 2025 National Bridge Inventory, as of .
- Lake and Peninsula Borough has no bridges closed to all traffic and 3 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; no bridges had at least one major component rating lowered.
- Inspection dates on record run from August 2023 to September 2024; 6 bridges over water are coded scour critical.
- 5 bridges (50.0%) are rated good and 4 (40.0%) fair.
- The median Lake and Peninsula Borough bridge was built in 1985.
- The busiest poor-rated bridge is Irr:anderson Rd over Indian Creek (built 1985), carrying about 45 vehicles a day.
What this page is: the federal bridge inspection inventory for Lake and Peninsula Borough: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 50.0% · Fair 40.0% · Poor 10.0% of 10 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
No bridge in Lake and Peninsula Borough dropped a condition class, lost a point on a component rating, or was newly closed or posted between the two inventories.
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Irr:airport Road over Perryville Creek | posted for load | 1981 | 77 | September 2024 | Good |
| Irr:anderson Rd over Indian Creek | posted for load | 1985 | 45 | September 2024 | Poor |
| Chignik Lagoon over Packers Creek | posted for load | 1986 | 41 | September 2024 | Fair |
| Bay Road over Rushing Creek | open, posting recommended | 1985 | 30 | August 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 10 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Lake and Peninsula Borough is dated September 2024; 9 bridges have an inspection dated in 2024.
Scour critical (item 113): 6 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Irr:airport Road over Perryville Creek | posted for load | 1981 | 77 | September 2024 | Good |
| Irr:newhalen Road over North Fork Alexcy Creek | open | 1985 | 50 | July 2024 | Fair |
| Irr:anderson Rd over Chignik Creek | open | 2002 | 45 | September 2024 | Fair |
| Irr:anderson Rd over Indian Creek | posted for load | 1985 | 45 | September 2024 | Poor |
| Chignik Lagoon over Packers Creek | posted for load | 1986 | 41 | September 2024 | Fair |
| Williamsport/pile over Timberline Creek | open | 1981 | 20 | July 2024 | Good |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Irr:anderson Rd over Indian Creek | 1985 | 45 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Iliamna Village Sp over Iliamnavillagespurrd_roa | 1976 | 275 | Good |
| Iliamna Village Rd over Iliamnavillagerd_roadhou | 1976 | 143 | Good |
| Irr:airport Road over Perryville Creek | 1981 | 77 | Good |
| Irr:newhalen Road over North Fork Alexcy Creek | 1985 | 50 | Fair |
| Irr:anderson Rd over Indian Creek | 1985 | 45 | Poor |
| Irr:anderson Rd over Chignik Creek | 2002 | 45 | Fair |
| Chignik Lagoon over Packers Creek | 1986 | 41 | Fair |
| Bay Road over Rushing Creek | 1985 | 30 | Fair |
| Williamsport/pile over Timberline Creek | 1981 | 20 | Good |
| Williamsport/pile over Iliamna River | 2019 | 20 | Good |
Frequently asked questions
Are any bridges closed in Lake and Peninsula Borough, Alaska?
No bridges of the 10 in Lake and Peninsula Borough are coded closed to all traffic in the 2025 National Bridge Inventory, and 3 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.
Have any bridges failed in Lake and Peninsula Borough?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Lake and Peninsula Borough: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Lake and Peninsula Borough last inspected?
Inspection dates in the 2025 inventory for Lake and Peninsula Borough run from August 2023 to September 2024. Intervals: 10 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Lake and Peninsula Borough → - all 10, busiest first, each with its own condition record.
All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.