BridgeReportCard
Home › Alaska › Northwest Arctic Borough

Bridge conditions in Northwest Arctic Borough, Alaska

7 inventoried bridges · 0 closed · 0 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 7 bridges.

Of the 7 Northwest Arctic Borough bridges in the federal inventory, 1 carry a poor rating. That 14.3% share is roughly 2x the national average.

What this page is: the federal bridge inspection inventory for Northwest Arctic Borough: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 28.6% · Fair 57.1% · Poor 14.3% of 7 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Ted Stevens Way over June Creek Culvertsfair to poor; culvert 5 to 4FairPoor100
South Access Route over Kivalina Lagoon Channelsubstructure 9 to 8GoodGood18

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Irr Bia Rte 2800 over Dahl Creekopen, posting recommended20105September 2024Good

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 7 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Northwest Arctic Borough is dated September 2024; 7 bridges have an inspection dated in 2024.

Scour critical (item 113): 1 bridge. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Irr:deering Road over Smith Creekopen197918August 2024Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Ted Stevens Way over June Creek Culverts2010100Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Ted Stevens Way over Kotzebue Slough1985320Fair
Ted Stevens Way over Swan Lake1985320Fair
Ted Stevens Way over June Creek Culverts2010100Poor
Ted Stevens Way over June Creek Culvert2010100Fair
Irr:deering Road over Smith Creek197918Fair
South Access Route over Kivalina Lagoon Channel202018Good
Irr Bia Rte 2800 over Dahl Creek20105Good

Frequently asked questions

Are any bridges closed in Northwest Arctic Borough, Alaska?

None of the 7 bridges in Northwest Arctic Borough is coded closed or posted in the 2025 National Bridge Inventory. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.

Have any bridges failed in Northwest Arctic Borough?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Northwest Arctic Borough: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Northwest Arctic Borough last inspected?

Inspection dates in the 2025 inventory for Northwest Arctic Borough run from August 2024 to September 2024. Intervals: 7 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Northwest Arctic Borough → - all 7, busiest first, each with its own condition record.

All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.