Bridge conditions in Southeast Fairbanks Census Area, Alaska
64 inventoried bridges · 0 closed · 2 posted · 7 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 64 bridges.
About one in 9 bridges in Southeast Fairbanks Census Area is rated in poor condition: 7 of 64 on the federal inventory, one of the higher shares in Alaska.
- 7 of the 64 bridges in Southeast Fairbanks Census Area, Alaska, are rated in poor condition (10.9%) in the 2025 National Bridge Inventory, as of .
- Southeast Fairbanks Census Area has no bridges closed to all traffic and 2 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 1 bridge improved out of it; 6 bridges had at least one major component rating lowered, 2 newly load-posted.
- Inspection dates on record run from July 2023 to October 2024; 12 bridges over water are coded scour critical.
- 23 bridges (35.9%) are rated good and 34 (53.1%) fair.
- The median Southeast Fairbanks Census Area bridge was built in 1985.
- The busiest poor-rated bridge is Richardson Highway over Upper Miller Creek (built 1958), carrying about 280 vehicles a day.
What this page is: the federal bridge inspection inventory for Southeast Fairbanks Census Area: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 35.9% · Fair 53.1% · Poor 10.9% of 64 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Alaska Highway over Johnson River | newly posted for load | Poor | Poor | 180 |
| Alaska Highway over Gerstle River | newly posted for load | Poor | Poor | 180 |
| Alaska Highway over Scottie Creek | substructure 6 to 5 | Fair | Fair | 220 |
| Alaska Highway over Gardiner Creek | substructure 6 to 5 | Fair | Fair | 220 |
| Irr:tetlin Road over Tetlin River | superstructure 6 to 5 | Fair | Fair | 14 |
| Alaska Highway over Beaver Creek | superstructure 7 to 6 | Fair | Fair | 260 |
| Alaska Highway over Cathedral Rapids No 2 | superstructure 8 to 7 | Good | Good | 230 |
| Irr:northway Road over Moose Creek | deck 9 to 8; substructure 9 to 8 | Good | Good | 170 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Richardson Highway over Bear Creek | poor to good; deck up 4 to 9; superstructure up 7 to 9; substructure up 5 to 8 | Poor | Good | 240 |
| Alaska Highway over Sears Creek | fair to good; substructure up 6 to 7 | Fair | Good | 190 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Alaska Highway over Gerstle River | posted for load | 1944 | 180 | July 2024 | Poor |
| Alaska Highway over Johnson River | posted for load | 1944 | 180 | July 2024 | Poor |
| Irr:northway Road over Fish Camp Creek | open on temporary shoring | 1987 | 210 | July 2024 | Poor |
| Taylor Highway over Taylor Creek | open on temporary shoring | 1977 | 160 | September 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 64 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Southeast Fairbanks Census Area is dated October 2024; 27 bridges have an inspection dated in 2024.
Scour critical (item 113): 12 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 6 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Richardson Highway over Tanana River Big Delta | open | 1966 | 1,990 | July 2024 | Fair |
| Richardson Highway over Boulder Creek | open | 1954 | 280 | July 2023 | Fair |
| Richardson Highway over Castner Creek | open | 1958 | 280 | July 2023 | Poor |
| Richardson Highway over Flood Creek | open | 1954 | 280 | July 2023 | Fair |
| Richardson Highway over Michael Creek | open | 1954 | 280 | July 2023 | Fair |
| Richardson Highway over Trims Creek | open | 1954 | 280 | July 2023 | Fair |
| Richardson Highway over Gunny Sack Creek | open | 1954 | 240 | July 2023 | Fair |
| Alaska Highway over Gerstle River | posted for load | 1944 | 180 | July 2024 | Poor |
| Alaska Highway over Johnson River | posted for load | 1944 | 180 | July 2024 | Poor |
| Taylor Highway over Taylor Creek | open on temporary shoring | 1977 | 160 | September 2023 | Poor |
| Taylor Highway over Forty Mile River | open | 1974 | 20 | July 2023 | Good |
| Irr:tetlin Road over Tetlin River | open | 1981 | 14 | July 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Richardson Highway over Upper Miller Creek | 1958 | 280 | Poor |
| Richardson Highway over Castner Creek | 1958 | 280 | Poor |
| Irr:northway Road over Fish Camp Creek | 1987 | 210 | Poor |
| Alaska Highway over Johnson River | 1944 | 180 | Poor |
| Alaska Highway over Gerstle River | 1944 | 180 | Poor |
| Taylor Highway over Taylor Creek | 1977 | 160 | Poor |
| Taylor Highway over American Creek No 1 | 1988 | 20 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Richardson Highway over Tanana River Big Delta | 1966 | 1,990 | Fair |
| Richardson Highway over Jarvis Creek | 2015 | 1,880 | Good |
| Delta-nistler Road over Jarvis Creek Overflow #1 | 1996 | 1,250 | Good |
| Delta-nistler Road over Jarvis Creek Overflow #2 | 1996 | 1,250 | Good |
| Delta-nistler Road over Jarvis Creek Overflow #3 | 1996 | 1,250 | Good |
| Richardson Highway over Shaw Creek | 2011 | 1,000 | Good |
| Alaska Highway over Sawmill Creek | 1995 | 750 | Fair |
| Alaska Highway over Tok River | 2019 | 400 | Good |
| Tok Cutoff over Clearwater Creek | 2006 | 330 | Good |
| Tok Cutoff over Tok River Overflow | 1963 | 330 | Good |
Frequently asked questions
Are any bridges closed in Southeast Fairbanks Census Area, Alaska?
No bridges of the 64 in Southeast Fairbanks Census Area are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.
Have any bridges failed in Southeast Fairbanks Census Area?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Southeast Fairbanks Census Area: no bridges with a component rated 2 (critical) or lower, 7 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Southeast Fairbanks Census Area last inspected?
Inspection dates in the 2025 inventory for Southeast Fairbanks Census Area run from July 2023 to October 2024. Intervals: 64 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Southeast Fairbanks Census Area → - all 64, busiest first, each with its own condition record.
All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.