Bridge conditions in Wrangell City and Borough, Alaska
58 inventoried bridges · 0 closed · 2 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 58 bridges.
Wrangell City and Borough tracks close to typical: 3 of its 58 inventoried bridges (5.2%) are rated poor, against a national rate of about 7%.
- 3 of the 58 bridges in Wrangell City and Borough, Alaska, are rated in poor condition (5.2%) in the 2025 National Bridge Inventory, as of .
- Wrangell City and Borough has no bridges closed to all traffic and 2 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 13 bridges had at least one major component rating lowered.
- Inspection dates on record run from August 2020 to October 2024; 1 bridge over water is coded scour critical.
- 24 bridges (41.4%) are rated good and 31 (53.4%) fair.
- The median Wrangell City and Borough bridge was built in 1986.
- The busiest poor-rated bridge is Fdr 6265 over Stream -perm (built 1980), carrying about 50 vehicles a day.
What this page is: the federal bridge inspection inventory for Wrangell City and Borough: inspector ratings, closures and load postings as reported by the Alaska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 41.4% · Fair 53.4% · Poor 5.2% of 58 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Fdr 6265 over Stream -perm | fair to poor; substructure 5 to 3 | Fair | Poor | 50 |
| No Data Entered over No Data Entered | good to fair; deck 7 to 5; substructure 7 to 6 | Good | Fair | 5 |
| Fdr 6270 over Stream - Perm | good to fair; deck 7 to 6 | Good | Fair | 10 |
| Fdr 6542 over Stream - Gluelam Slab | good to fair; substructure 7 to 6 | Good | Fair | – |
| No Data Entered over Mod | good to fair; superstructure 7 to 6 | Good | Fair | – |
| No Data Entered over No Data Entered | deck 6 to 5; superstructure 6 to 5; substructure 7 to 5 | Fair | Fair | – |
| No Data Entered over No Data Entered | deck 6 to 5; superstructure 6 to 5; substructure 7 to 5 | Fair | Fair | – |
| Fdr 6540 over Stream - Hamilton 40r37 | substructure 6 to 5 | Fair | Fair | – |
| Fdr 6540 over Stream- Hamilton 40r38 | superstructure 6 to 5; substructure 6 to 5 | Fair | Fair | – |
| Fdr 6540 over Stream- Hamilton 30r22 | superstructure 6 to 5 | Fair | Fair | – |
| Fdr 6546 over Stream | superstructure 6 to 5; substructure 7 to 6 | Fair | Fair | – |
| Logging Road over No Data Entered | deck 7 to 6; superstructure 6 to 5 | Fair | Fair | – |
| Fdr 6270 over Stream - Perm | deck 7 to 6; substructure up 6 to 7 | Fair | Fair | 10 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Fdr 6540 over Stream - Hamilton 50r36 | poor to fair; substructure up 4 to 5 | Poor | Fair | – |
| FDR6585 over Stream - Log | fair to good; substructure up 6 to 7 | Fair | Good | – |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Copper River Road over National Creek | posted for load | 2009 | 1 | August 2023 | Fair |
| Fdr 6540 over Stream - Hamilton 60r36 | posted for load | 1982 | – | October 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alaska department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 2 on 12 months or less, 52 on 24 months, 4 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Wrangell City and Borough is dated October 2024; 51 bridges have an inspection dated in 2024.
Scour critical (item 113): 1 bridge; 1 over water not yet evaluated for scour; 1 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fdr 6540 over Stream - Hamilton 60r36 | posted for load | 1982 | – | October 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Fdr 6265 over Stream -perm | 1980 | 50 | Poor |
| Logging Road over No Data Entered | 1991 | – | Poor |
| Fdr 6540 over Stream - Hamilton 60r36 | 1982 | – | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Mccormack CR Rd over Mccormack Creek | 1998 | 230 | Good |
| Zimovia Highway over Pat Creek | 1973 | 230 | Fair |
| Fdr 6265 over Stream | 1982 | 50 | Good |
| Fdr 6265 over Stream - Perm | 1989 | 50 | Good |
| Logging Road over Stream | 1988 | 50 | Good |
| Fdr 6265 over Stream -perm | 1980 | 50 | Poor |
| Marine Hwy Route over Wrangell Ferry Terminal | 1987 | 22 | Fair |
| Fdr 3270 over Stream - Perm | 1982 | 10 | Good |
| Fdr 6270 over Stream | 1982 | 10 | Fair |
| Fdr 6270 over Stream - Perm | 1982 | 10 | Fair |
Frequently asked questions
Are any bridges closed in Wrangell City and Borough, Alaska?
No bridges of the 58 in Wrangell City and Borough are coded closed to all traffic in the 2025 National Bridge Inventory, and 2 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alaska department of transportation.
Have any bridges failed in Wrangell City and Borough?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Wrangell City and Borough: no bridges with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Wrangell City and Borough last inspected?
Inspection dates in the 2025 inventory for Wrangell City and Borough run from August 2020 to October 2024. Intervals: 2 on 12 months or less, 52 on 24 months, 4 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Wrangell City and Borough → - all 58, busiest first, each with its own condition record.
All of Alaska: Alaska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.