BridgeReportCard
Home › Alabama › Marion County

Bridge conditions in Marion County, Alabama

255 inventoried bridges · 1 closed · 13 posted · 2 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 255 bridges.

Marion County tracks close to typical: 2 of its 255 inventoried bridges (0.8%) are rated poor, against a national rate of about 7%.

What this page is: the federal bridge inspection inventory for Marion County: inspector ratings, closures and load postings as reported by the Alabama DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 32.5% · Fair 66.7% · Poor 0.8% of 255 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
27
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
1 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Gravel Road over Sipsey Creeknewly closedPoorPoor30
I-22 over New Rivergood to fair; deck 7 to 6GoodFair13,401
I-22 over Gulf Branchgood to fair; deck 7 to 6GoodFair13,401
Cr-13 over I-22good to fair; deck 7 to 6; superstructure 7 to 6GoodFair13,191
I-22 over Clifty Creekgood to fair; superstructure 7 to 6GoodFair12,834
I-22 over Little New Rivergood to fair; superstructure 7 to 6GoodFair12,834
I-22 over Al-129good to fair; deck 7 to 6GoodFair12,834
I-22 over Al-129good to fair; deck 7 to 6GoodFair12,834
I-22 over Trib. of Cooper Creekgood to fair; culvert 7 to 6GoodFair12,261
I-22 over Al-44good to fair; deck 7 to 6GoodFair12,261
I-22 over Dougan Creekgood to fair; culvert 7 to 6GoodFair12,178
Al-13 over Bear Creekgood to fair; deck 7 to 6GoodFair5,413
Al-172 over Branchgood to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6GoodFair1,357
Cr-45 over McKay Branchgood to fair; substructure 7 to 6GoodFair500
Cr-55 over I-22good to fair; superstructure 7 to 6GoodFair450
Cr-11 over I-22good to fair; superstructure 7 to 6GoodFair137
Cr-9 over I-22good to fair; superstructure 7 to 6GoodFair100
Al-171 over Branchculvert 6 to 5FairFair13,505
I-22 over Cooper Creekculvert 6 to 5FairFair12,261
Al-19 over Bull Mountain Creeksuperstructure 6 to 5; substructure 6 to 5FairFair712
Al-19 over Aston Branchdeck 6 to 5FairFair297
I-22 over Cr-45substructure 7 to 6FairFair12,261
Al-171 over Dougan Creekdeck 7 to 6FairFair3,300
Al-233 over I-22deck 7 to 6; superstructure up 6 to 7FairFair700
3.9 Mp Cr-33 over I-22superstructure 7 to 6FairFair273
I-22 over Al-44substructure 8 to 7FairFair12,325
I-22 over US-43superstructure 8 to 7; substructure 8 to 7GoodGood12,178
Al-172 over Bear Creekdeck 8 to 7GoodGood1,000

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Al-19 over I-22fair to good; superstructure up 6 to 7FairGood517

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Gravel Road over Sipsey Creekclosed198430June 2024Poor
County Road 35 over Buttahatchee Riverposted for load1954600January 2025Fair
1ST Street W over East Branchposted for load1975400October 2024Fair
County Road 49 over Buttahatchee Riverposted for load1951370March 2024Fair
County Road 30 over New Riverposted for load1957275March 2024Fair
Co Rd No 52 over Luxapallila Creekposted for load1965130October 2024Poor
Co Rd No 56 over Bull Mt Creekposted for load1953100December 2024Fair
County Road 98 over Whitley Creekposted for load193780January 2025Fair
Co. Hwy. 116 over Robinson Branchposted for load193550September 2023Fair
Paved Road over Beaver Creekposted for load197350October 2024Fair
Ada Hanna Rd(dirt) over Sipsey Creekposted for load200730September 2023Fair
Johnson Bottom Rd over Sipsey Creekposted for load200830August 2024Good
Tidwell Road over Camp Creekposted for load195025February 2025Fair
Gravel Road over Branchposted for load196520October 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Alabama department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 255 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Marion County is dated February 2025; 48 bridges have an inspection dated in 2025.

Scour critical (item 113): 4 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
County Road 26 over Sipsey Creekopen2002255May 2024Fair
County Road 26 over Sipsey Creek Reliefopen2003255May 2024Fair
County Road 26 over Sipsey Creek Reliefopen2003255May 2024Good
Paved Road over Beaver Creekposted for load197350October 2024Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Co Rd No 52 over Luxapallila Creek1965130Poor
Gravel Road over Sipsey Creek198430Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Al-17 over Ragsdale Creek193114,158Fair
Al-171 over Branch192813,505Fair
I-22 over New River200413,401Good
I-22 over New River200413,401Fair
I-22 over Gulf Branch200413,401Fair
I-22 over Gulf Branch200413,401Good
I-22 over Hurricane Creek195813,191Fair
I-22 over Hurricane Creek Relief195813,191Fair
I-22 over Stream198613,191Fair
I-22 over Cr-301198613,191Good

Frequently asked questions

Are any bridges closed in Marion County, Alabama?

1 bridge of the 255 in Marion County is coded closed to all traffic in the 2025 National Bridge Inventory, and 13 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Alabama department of transportation.

Have any bridges failed in Marion County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Marion County: no bridges with a component rated 2 (critical) or lower, 2 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Marion County last inspected?

Inspection dates in the 2025 inventory for Marion County run from March 2023 to February 2025. Intervals: 255 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Marion County → - all 255, busiest first, each with its own condition record.

All of Alabama: Alabama bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.