BridgeReportCard
Home › Arizona › Yuma County

Bridge conditions in Yuma County, Arizona

262 inventoried bridges · 0 closed · 9 posted · 6 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 262 bridges.

Yuma County tracks close to typical: 6 of its 262 inventoried bridges (2.3%) are rated poor, against a national rate of about 7%.

What this page is: the federal bridge inspection inventory for Yuma County: inspector ratings, closures and load postings as reported by the Arizona DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 50.8% · Fair 46.9% · Poor 2.3% of 262 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

2
dropped into poor
since 2024
1
improved out of poor
since 2024
11
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Local & Canal Serv over Main Outlet Drain Extensfair to poor; deck 5 to 4; superstructure 5 to 4; substructure 6 to 5FairPoor25
Pacific Ave./Count over Main Outlet Drain Extensfair to poor; deck 5 to 4; superstructure 5 to 4FairPoor20
SB 8 over Colorado Rivergood to fair; deck 7 to 5GoodFair12,600
FAU 8312; Ave B over West Main Canalsubstructure 6 to 5FairFair10,012
Magnolia Ave over Yuma East Main Canalsubstructure 6 to 5FairFair1,403
Avenue 45E over Mohawk Canalsubstructure 6 to 5FairFair278
Figueroa Ave. over Main Outlet Drain Extenssubstructure 6 to 5FairFair25
O&M Traffic over Main Outlet Drain Extensdeck 6 to 5; superstructure 6 to 5FairFair20
16th Street over B Main Canaldeck 8 to 7GoodGood3,706
Co 9th Street over West Main Canaldeck 8 to 7; superstructure 8 to 7GoodGood3,452
Co 15th St over West Main Canaldeck 8 to 7; superstructure 8 to 7FairFair680

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Avenue 4E over B Canalpoor to fair; deck up 4 to 5PoorFair1,408
Avenue G over Main Drainfair to good; deck up 6 to 7; superstructure up 6 to 7FairGood220

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
1st Street over East Main Canalposted for load193511,708March 2024Fair
FAU 8312; Ave B over West Main Canalposted for load194810,012March 2024Fair
Penitentiary Ave over Colorado Riverposted for load19145,430June 2023Fair
Old US 80 over Dry Washposted for load19302,302January 2025Good
Old US 80 over Ligurta Washposted for load19302,302January 2025Fair
Avenue 20E over Wellton Mohawkposted for load1956474June 2023Fair
Araby Blaisdell Rd over "A" Canalposted for load1943228November 2023Good
Avenue 1E over Lateral A8.9posted for load1984210June 2023Fair
County 3rd Street over North Gila Canalposted for load193620March 2023Poor
Irr Bia Rte 31 over Southern Pacific RRopen, posting recommended19653,550February 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Arizona department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 180 on 24 months, 82 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Yuma County is dated February 2025; 62 bridges have an inspection dated in 2025.

Scour critical (item 113): 5 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Avenue 7E over Gila Riveropen19883,688January 2025Good
S Frontage Rd over Fortuna Washopen19333,375June 2023Fair
Old US 80 over Dry Washposted for load19302,302January 2025Good
Old US 80 over Ligurta Washposted for load19302,302January 2025Fair
Old US 80 over Washopen1924448February 2025Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
I 8 EB over Colo R Pentntry Av SPTCO19788,350Poor
Irr Bia Rte 31 over Southern Pacific RR19653,550Poor
Local & Canal Serv over Main Outlet Drain Extens196625Poor
O&M Crossover over Main Outlet Drain Extens196620Poor
Pacific Ave./Count over Main Outlet Drain Extens196620Poor
County 3rd Street over North Gila Canal193620Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
16th St over UPRR195141,102Fair
US 95 over I-8197035,771Fair
24th Street over Yuma East Main Canal197731,727Fair
Main Street over Main Drain199924,767Good
US 95 over East Main Canal196922,266Fair
32nd St over East Main Canal198421,418Good
I-8 EB over Avenue 3E200321,392Fair
32nd Street over A Canal200221,305Good
I-8; EB over SR B8 & Canal196820,457Fair
I 8; EB over Fortuna SPRR196820,457Fair

Frequently asked questions

Are any bridges closed in Yuma County, Arizona?

No bridges of the 262 in Yuma County are coded closed to all traffic in the 2025 National Bridge Inventory, and 9 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Arizona department of transportation.

Have any bridges failed in Yuma County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Yuma County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Yuma County last inspected?

Inspection dates in the 2025 inventory for Yuma County run from January 2021 to February 2025. Intervals: 180 on 24 months, 82 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Yuma County → - all 262, busiest first, each with its own condition record.

All of Arizona: Arizona bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.