Bridge conditions in Contra Costa County, California
622 inventoried bridges · 1 closed · 3 posted · 56 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 622 bridges.
56 of the 622 bridges the federal inventory lists in Contra Costa County are rated poor; the rest split 260 good and 306 fair.
- 56 of the 622 bridges in Contra Costa County, California, are rated in poor condition (9.0%) in the 2025 National Bridge Inventory, as of .
- Contra Costa County has 1 bridge closed to all traffic and 3 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 4 bridges dropped into poor condition and 13 bridges improved out of it; 52 bridges had at least one major component rating lowered.
- Inspection dates on record run from October 2019 to February 2025; 3 bridges over water are coded scour critical.
- 260 bridges (41.8%) are rated good and 306 (49.2%) fair.
- The median Contra Costa County bridge was built in 1972.
- The busiest poor-rated bridge is Interstate 680 over Monument Boulevard (built 1998), carrying about 235,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Contra Costa County: inspector ratings, closures and load postings as reported by the California DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 41.8% · Fair 49.2% · Poor 9.0% of 622 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I 580 WB over Castro Street | fair to poor; deck 6 to 4 | Fair | Poor | 27,500 |
| Canal Bl-w580 Onrp over BNSF Ry & Garrard Blvd | fair to poor; deck 6 to 4 | Fair | Poor | 2,450 |
| Interstate 680 over Laurel Drive | fair to poor; deck 5 to 4; substructure 7 to 6 | Fair | Poor | 192,200 |
| Waterfront Rd over Pacheco Slough | fair to poor; deck 5 to 4; superstructure 7 to 6 | Fair | Poor | 2,409 |
| State Route 4 EB over W4-s242 Connector Ramp | good to fair; superstructure 7 to 5 | Good | Fair | 31,000 |
| Bollinger Canyon over Main Branch Alamo Creek | good to fair; deck 7 to 5 | Good | Fair | 5,000 |
| I-580 on Ramp over Central Ave | good to fair; deck 7 to 5; superstructure 7 to 5 | Good | Fair | 4,400 |
| Interstate 680 over La Gonda Way | good to fair; deck 7 to 6 | Good | Fair | 194,300 |
| Interstate 680 over Diablo Road | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 192,200 |
| Interstate 80 over Bartd | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 179,000 |
| Route 580 WB over Hillside | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 68,000 |
| State Route 4 WB over Solano Way | good to fair; deck 7 to 6 | Good | Fair | 42,800 |
| State Route 4 WB over Walnut Creek | good to fair; deck 7 to 6 | Good | Fair | 41,300 |
| State Route 4 EB over Walnut Creek | good to fair; deck 7 to 6 | Good | Fair | 41,300 |
| State Route 4 WB over Franklin Canyon Rd | good to fair; deck 7 to 6 | Good | Fair | 40,500 |
| State Route 580 over Stenmark Dr SB On-ramp | good to fair; deck 7 to 6; substructure 7 to 6 | Good | Fair | 33,500 |
| Olympic Blvd over Las Trampas Creek | good to fair; deck 7 to 6; superstructure up 7 to 8; substructure up 7 to 8 | Good | Fair | 21,623 |
| S160-e4 Connector over E4-n160 Connect UPRR | good to fair; deck 7 to 6 | Good | Fair | 13,600 |
| Byron Hwy over Brushy Creek | good to fair; culvert 7 to 6 | Good | Fair | 12,023 |
| San Pablo Ave over Pinole Creek | good to fair; deck 7 to 6 | Good | Fair | 11,000 |
| SR 160 SB over Wilbur Avenue | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 6,800 |
| Shell Ave over Oil Refinery Pipe Uc | good to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 8 | Good | Fair | 4,386 |
| Fourth St over Rodeo Creek | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 4,279 |
| Waterfront Rd over Peyton Slough | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 4,185 |
| Bayview-w580 Onrmp over None | good to fair; deck 7 to 6 | Good | Fair | 3,600 |
| Morninghome Rd over Sycamore Creek | good to fair; culvert 7 to 6 | Good | Fair | 400 |
| Park Avenue over Wildcat Creek | good to fair; substructure 7 to 6 | Good | Fair | 100 |
| Lindemann Rd over Delta-mendota Canal | superstructure 5 to 4 | Poor | Poor | 150 |
| State Route 4 EB over Alhambra Ave | superstructure 7 to 5 | Fair | Fair | 31,000 |
| State Route 4 WB over Mcewen Road | deck 6 to 5 | Fair | Fair | 23,000 |
| Marsh Creek Rd over Marsh Creek | culvert 6 to 5 | Fair | Fair | 5,637 |
| South 23RD St over Interstate 580 | superstructure 6 to 5 | Fair | Fair | 3,000 |
| E4-e80 Connector over State Route 4 | deck 6 to 5 | Fair | Fair | 920 |
| Interstate 680 over Canal & Bike Path | superstructure 7 to 6; deck up 5 to 6; substructure up 7 to 8 | Fair | Fair | 257,000 |
| Interstate 80 WB over Carquinez Straits RR | superstructure 7 to 6; substructure up 5 to 6 | Fair | Fair | 154,000 |
| Interstate 680 SB over UP BNSF Amtrak Suisun Ba | deck 7 to 6; substructure 7 to 6; superstructure up 5 to 6 | Fair | Fair | 115,000 |
| State Route 4 over Pacheco Blvd | deck 7 to 6 | Fair | Fair | 82,600 |
| I 580 over Marine Street | substructure 7 to 6 | Fair | Fair | 68,000 |
| North Main Street over Interstate 680 | superstructure 7 to 6 | Poor | Poor | 36,800 |
| I 580 EB over Scofield Avenue | deck 7 to 6; superstructure up 5 to 6; substructure up 5 to 7 | Fair | Fair | 34,000 |
Showing the 40 largest of 52 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Interstate 680 over Rudgear Road | poor to good; deck up 4 to 7 | Poor | Good | 197,400 |
| Interstate 680 over Olympic Boulevard | poor to fair; deck up 4 to 5; superstructure up 5 to 6; substructure up 7 to 8 | Poor | Fair | 195,300 |
| Interstate 680 over Las Trampas Creek | poor to fair; deck up 4 to 6; substructure up 7 to 8 | Poor | Fair | 195,300 |
| Interstate 680 over Lilac Drive | poor to fair; deck up 4 to 7 | Poor | Fair | 195,300 |
| Interstate 680 over El Pintado Road | poor to fair; deck up 4 to 7 | Poor | Fair | 194,300 |
| Interstate 680 over El Cerro Boulevard | poor to good; deck up 4 to 7 | Poor | Good | 190,100 |
| Interstate 680 over Pine Valley Road | poor to good; deck up 4 to 7 | Poor | Good | 181,700 |
| Interstate 680 over Montevideo Drive | poor to fair; deck up 4 to 6; substructure up 7 to 8 | Poor | Fair | 181,700 |
| Diablo Road over San Ramon Creek | poor to fair; deck up 4 to 5 | Poor | Fair | 21,350 |
| Richmond Parkway over Wild Cat Creek | fair to good; deck up 6 to 7; superstructure up 6 to 7 | Fair | Good | 16,485 |
| Canal Rd over Contra Costa Canal | fair to good; deck up 5 to 7; superstructure up 7 to 8 | Fair | Good | 10,900 |
| WB Route 4 over Private Access Road | fair to good; superstructure up 6 to 7 | Fair | Good | 10,200 |
| Miner Rd over San Pablo Creek | poor to fair; deck up 4 to 5 | Poor | Fair | 6,368 |
| SR 160 NB over BNSF Ry UP RR & Amtrak | fair to good; deck up 5 to 7; superstructure up 5 to 7 | Fair | Good | 5,700 |
| SR 160 SB over E 18TH Street | fair to good; superstructure up 6 to 7 | Fair | Good | 5,700 |
The 15 busiest of 27 improvements.
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Waterfront Rd over Slough | closed | 1945 | – | October 2019 | Poor |
| Lindemann Rd over Delta-mendota Canal | posted for load | 1950 | 150 | August 2024 | Poor |
| Kinney Blvd over County Rd & RR | posted for load | 1945 | 20 | October 2023 | Fair |
| Canal Trail over Galinda Creek | posted for load | 1939 | 2 | January 2021 | Good |
| Byron Hwy over California Aqueduct | open on temporary shoring | 1964 | 8,387 | August 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the California department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less, 489 on 24 months, 132 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Contra Costa County is dated February 2025; 107 bridges have an inspection dated in 2025.
Scour critical (item 113): 3 bridges; 1 over water not yet evaluated for scour; 10 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 21 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Byron Hwy over Brushy Creek | open | 1953 | 12,023 | July 2024 | Fair |
| Vale Rd over Wildcat Creek | open | 1960 | 5,000 | December 2024 | Fair |
| Boulevard Way over Las Trampas Creek | open | 1978 | 4,840 | November 2024 | Good |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Interstate 680 over Canal & Bike Path | 1956 | 257,000 | Fair |
| Interstate 680 over Monument Boulevard | 1998 | 235,000 | Poor |
| Interstate 680 over Parkside Drive | 1960 | 235,000 | Good |
| Interstate 680 over Rudgear Road | 1964 | 197,400 | Good |
| Interstate 680 over Livorna Road | 1964 | 197,400 | Good |
| Interstate 680 over Newell Avenue | 1994 | 195,300 | Fair |
| Interstate 680 over Olympic Boulevard | 1994 | 195,300 | Fair |
| Interstate 680 over Las Trampas Creek | 1960 | 195,300 | Fair |
| Interstate 680 over Lilac Drive | 1960 | 195,300 | Fair |
| Interstate 680 over South Main Street | 1959 | 195,300 | Good |
Frequently asked questions
Are any bridges closed in Contra Costa County, California?
1 bridge of the 622 in Contra Costa County is coded closed to all traffic in the 2025 National Bridge Inventory, and 3 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the California department of transportation.
Have any bridges failed in Contra Costa County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Contra Costa County: no bridges with a component rated 2 (critical) or lower, 56 bridges rated poor overall, and 4 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Contra Costa County last inspected?
Inspection dates in the 2025 inventory for Contra Costa County run from October 2019 to February 2025. Intervals: 1 on 12 months or less, 489 on 24 months, 132 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Contra Costa County → - all 622, busiest first, each with its own condition record.
All of California: California bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.