Bridge conditions in Fairfield County, Connecticut
862 inventoried bridges · 4 closed · 65 posted · 33 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 862 bridges.
33 of the 862 bridges the federal inventory lists in Fairfield County are rated poor; the rest split 189 good and 640 fair.
- 33 of the 862 bridges in Fairfield County, Connecticut, are rated in poor condition (3.8%) in the 2025 National Bridge Inventory, as of .
- Fairfield County has 4 bridges closed to all traffic and 65 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 2 bridges dropped into poor condition and 4 bridges improved out of it; 32 bridges had at least one major component rating lowered, 2 were newly closed.
- 3 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2021 to January 2025; 46 bridges over water are coded scour critical.
- 189 bridges (21.9%) are rated good and 640 (74.2%) fair.
- The median Fairfield County bridge was built in 1962.
- The busiest poor-rated bridge is Interstate-95 over Mill Plain Road (built 1958), carrying about 130,300 vehicles a day.
What this page is: the federal bridge inspection inventory for Fairfield County: inspector ratings, closures and load postings as reported by the Connecticut DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 21.9% · Fair 74.2% · Poor 3.8% of 862 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Fairfield Avenue over Interstate-95 | newly closed; good to poor; deck 7 to 0; superstructure 8 to 0 | Good | Poor | 8,600 |
| Lakeside Drive over North Stamford Reservoir | newly closed | Poor | Poor | 4,220 |
| Turkey Hill Road over Housatonic Railroad | fair to poor; superstructure 6 to 4 | Fair | Poor | 948 |
| Route 15 over Five Mile River | good to fair; culvert 7 to 6 | Good | Fair | 68,300 |
| US Route 7 NB over Still River | good to fair; superstructure 7 to 6 | Good | Fair | 27,600 |
| Route 25 SB over Route 25 NB TR801 | good to fair; substructure 7 to 6 | Good | Fair | 13,100 |
| Cross Street over Still River | good to fair; substructure 7 to 6 | Good | Fair | 3,900 |
| Covered Bridge Rd over Pond Brook | good to fair; culvert 7 to 6 | Good | Fair | 50 |
| Interstate-95 over West Avenue | superstructure 6 to 5 | Fair | Fair | 125,300 |
| Interstate-95 over US Route 1 Southbound | deck 6 to 5 | Fair | Fair | 121,100 |
| Route 8 over Housatonic River Rt 110 | deck 6 to 5; substructure up 5 to 6 | Fair | Fair | 82,700 |
| Interstate 84 EB over Hanover Road | superstructure 6 to 5 | Fair | Fair | 38,000 |
| West Street over Still River | substructure 6 to 5 | Fair | Fair | 16,000 |
| Riverside Avenue over Interstate-95 | deck 6 to 5 | Fair | Fair | 7,900 |
| Kennedy Avenue over Still River | deck 6 to 5 | Poor | Poor | 6,500 |
| SR 790 (south Stat over Rippowam River | deck 8 to 7; substructure 6 to 5 | Fair | Fair | 5,700 |
| Congress Street #1 over Route 15 | substructure 6 to 5 | Fair | Fair | 650 |
| Interstate 95 over Wordin Avenue No. 2 | substructure 7 to 6 | Fair | Fair | 125,000 |
| Interstate-95 over Stagg Street | superstructure 7 to 6 | Fair | Fair | 101,700 |
| Route 15 over Route 127 | deck 7 to 6; substructure 7 to 6 | Fair | Fair | 77,400 |
| Route 8 Southbound over Route 130 East Bound | deck 7 to 6 | Fair | Fair | 45,600 |
| Route 8 NB & Tr 80 over I-95 S Frontage Rd S.ave | substructure 7 to 6 | Fair | Fair | 41,900 |
| US Route 7 NB over Union Park South | substructure 7 to 6 | Fair | Fair | 30,600 |
| Route 15 NB Tr 808 over Route 15 & Route 8 | substructure 7 to 6 | Fair | Fair | 10,700 |
| Route 59 over Rooster River | deck 7 to 6 | Fair | Fair | 8,700 |
| Triangle Street over Still River | superstructure 7 to 6 | Fair | Fair | 8,365 |
| E Franklin Street over Padanaram Brook | superstructure 7 to 6 | Fair | Fair | 4,418 |
| SR 816 (glen Rd) over Housatonic River | deck 7 to 6 | Fair | Fair | 3,800 |
| Philo Curtis Road over I-84 EB & I-84 Ramp 630 | substructure 7 to 6 | Fair | Fair | 2,695 |
| Parmalee Hill Road over Housatonic RR | superstructure 7 to 6 | Fair | Fair | 312 |
| Interstate 84 West over Housatonic River | deck 8 to 7 | Fair | Fair | 36,800 |
| Westmere Avenue over Farm Creek | deck 8 to 7 | Good | Good | 2,520 |
| South Park Avenue over Mill River | substructure 8 to 7 | Good | Good | 2,240 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Interstate-95 over Route 33 | poor to good; deck up 4 to 8; superstructure up 5 to 7; substructure up 5 to 7 | Poor | Good | 124,600 |
| I-84 Eastbound over Housatonic River | fair to good; deck up 6 to 7; superstructure up 6 to 8; substructure up 6 to 7 | Fair | Good | 76,300 |
| Perry Ave over Norwalk River | fair to good; substructure up 6 to 7 | Fair | Good | 4,027 |
| River Bank Road over East Branch Mianus River | load posting removed; poor to good; deck up 5 to 8; superstructure up 3 to 8; substructure up 4 to 8 | Poor | Good | 1,500 |
| Ponus Ridge Road over Collins Pond | reopened; fair to good; deck up 6 to 8; superstructure up 6 to 8; substructure up 6 to 7 | Fair | Good | 1,460 |
| Lovers Lane over Comstock Brook | poor to good; deck up 5 to 8; superstructure up 5 to 8; substructure up 4 to 8 | Poor | Good | 420 |
| Arrowhead Road over Norwalk River | poor to good; deck up 4 to 8; superstructure up 4 to 8; substructure up 7 to 8 | Poor | Good | 70 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fairfield Avenue over Interstate-95 | closed | 2015 | 8,600 | October 2022 | Poor |
| Lakeside Drive over North Stamford Reservoir | closed | 1936 | 4,220 | June 2023 | Poor |
| Cedar Heights Road over Rippowam River | closed | 1933 | 3,390 | March 2023 | Poor |
| Depot Road over Norwalk River | closed | 1910 | – | May 2023 | Poor |
| Route 15 over Cutspring Road | posted, other restriction | 1940 | 119,800 | January 2024 | Fair |
| Route 15 over Silvermine River | posted, other restriction | 1958 | 108,000 | December 2023 | Fair |
| Route 15 over Housatonic River & Mnrr | posted, other restriction | 2004 | 98,800 | October 2022 | Good |
| Route 15 over Unity Road | posted, other restriction | 1940 | 86,100 | December 2023 | Fair |
| Route 15 over Route 110 | posted, other restriction | 1940 | 83,800 | November 2023 | Fair |
| Route 15 over Huntington Road | posted, other restriction | 1940 | 80,000 | November 2023 | Fair |
| Route 15 over Pumpkin Brook | posted, other restriction | 1941 | 80,000 | September 2023 | Fair |
| Route 15 over Route 127 | posted, other restriction | 1934 | 77,400 | August 2024 | Fair |
| Route 15 over Rippowam River | posted, other restriction | 1936 | 73,120 | June 2023 | Fair |
| Route 15 over Silvermine Avenue | posted, other restriction | 1938 | 72,400 | October 2023 | Fair |
| Route 15 over Route 106 | posted, other restriction | 1937 | 70,400 | July 2024 | Fair |
| Route 15 over Mill River | posted, other restriction | 2010 | 70,000 | November 2023 | Good |
| Route 15 over Route 123 | posted, other restriction | 1937 | 69,900 | October 2024 | Fair |
| Route 15 over Five Mile River | posted, other restriction | 1937 | 68,300 | February 2024 | Fair |
| Route 15 over Route 137 | posted, other restriction | 1937 | 66,520 | April 2023 | Fair |
| Route 15 over Reservoir Avenue | posted, other restriction | 1939 | 66,300 | September 2024 | Fair |
| Route 15 over Saugatuck River | posted, other restriction | 1938 | 66,300 | July 2023 | Fair |
| Route 15 over Bayberry Lane #1 | posted, other restriction | 1939 | 65,700 | March 2024 | Fair |
| Route 15 over Hillside Road | posted, other restriction | 1940 | 65,700 | March 2024 | Fair |
| Route 15 over Route 136 | posted, other restriction | 1938 | 65,700 | June 2024 | Fair |
| Route 15 over Perry Avenue | posted, other restriction | 1936 | 65,320 | June 2023 | Fair |
| Route 15 over Mianus River | posted, other restriction | 1937 | 65,120 | July 2024 | Fair |
| Route 15 over Route 104 | posted, other restriction | 1936 | 64,420 | April 2023 | Fair |
| Route 15 over Pequonnock River | posted, other restriction | 1935 | 64,000 | July 2024 | Good |
| Route 15 over Route 57 | posted, other restriction | 1938 | 61,200 | July 2024 | Fair |
| Route 15 over Route 33 | posted, other restriction | 1937 | 61,100 | October 2024 | Fair |
| Route 15 over Route 58 | posted, other restriction | 1938 | 59,300 | December 2024 | Fair |
| Route 15 over Cricker Brook | posted, other restriction | 1940 | 59,220 | July 2023 | Fair |
| Route 15 over Cross Highway | posted, other restriction | 1938 | 56,700 | June 2024 | Fair |
| Route 15 over Route 53 | posted, other restriction | 1937 | 56,400 | July 2024 | Fair |
| Route 15 over Byram River | posted, other restriction | 1997 | 53,800 | June 2024 | Fair |
| Route 15 over Converse Pond Brook | posted, other restriction | 1935 | 53,800 | November 2023 | Fair |
| Route 15 over Converse Pond Brook | posted, other restriction | 1935 | 53,800 | April 2024 | Fair |
| Route 15 over Converse Pond Brook | posted, other restriction | 1934 | 53,800 | April 2024 | Fair |
| Route 15 over Prvt Access Rd and Brook | posted, other restriction | 1935 | 53,800 | June 2024 | Fair |
| Route 15 over Riversville Rd E Br Byra | posted, other restriction | 1935 | 53,800 | July 2023 | Fair |
| Route 15 over Metro-north Railroad | posted, other restriction | 1937 | 51,000 | December 2024 | Fair |
| Route 15 over Norwalk River | posted, other restriction | 1938 | 51,000 | May 2024 | Fair |
| Route 15 SB over SR 719 | posted, other restriction | 1938 | 28,100 | December 2024 | Fair |
| Route 15 NB over Route 8 & Rt 8 Ramp 143 | posted, other restriction | 1983 | 26,800 | November 2024 | Fair |
| Route 15 SB over Route 8 & Rt 8 Ramp 143 | posted, other restriction | 1983 | 25,700 | November 2024 | Fair |
| Route 15 NB over SR 719 | posted, other restriction | 1938 | 25,400 | December 2024 | Fair |
| Route 130 over Pequonnock River | posted for load | 1975 | 14,600 | September 2022 | Poor |
| Route 136 over Saugatuck River | posted for load | 1870 | 12,400 | September 2024 | Poor |
| Route 15 Tr 810 over Route 15 & Route 8 | posted, other restriction | 1984 | 11,700 | November 2024 | Fair |
| Route 15 NB Tr 808 over Route 15 & Route 8 | posted, other restriction | 1984 | 10,700 | November 2024 | Fair |
| Route 59 over Rooster River | posted for load | 1985 | 10,100 | March 2024 | Fair |
| Route 15 Ramp 057 over Cricker Brook | posted, other restriction | 1997 | 9,100 | September 2023 | Good |
| Brookside Drive over Mill River | posted for load | 1955 | 8,800 | February 2023 | Fair |
| Route 34 over Housatonic River | posted for load | 1919 | 8,800 | March 2024 | Poor |
| Route 15 Tr 807 over Pequonnock River | posted, other restriction | 1980 | 7,200 | April 2023 | Fair |
| Route 15 Tr 805 over Reservoir Avenue | posted, other restriction | 1980 | 6,900 | October 2023 | Fair |
| Route 15 Tr 807 over Route 25 Ramp 003 | posted, other restriction | 1981 | 6,700 | September 2024 | Good |
| Congress Street #2 over Mill River | posted for load | 1935 | 6,505 | July 2023 | Poor |
| Route 15 Ramp #060 over Cricker Brook | posted, other restriction | 1938 | 5,900 | March 2024 | Fair |
| Hulls Farm Road over Sasco Brook | posted for load | 1935 | 3,090 | February 2024 | Fair |
| Old Road #2 over Sasco Brook | posted for load | 1965 | 2,030 | February 2024 | Poor |
| Wire Mill Road over Haviland Brook | posted for load | 1957 | 1,920 | March 2023 | Poor |
| Drinkwater Place over Metro North Railroad | posted for load | 1900 | 1,853 | September 2024 | Fair |
| Cliffdale Road over Byram River | posted for load | 1925 | 585 | May 2023 | Good |
| Mountain Road over Wataba Lake | posted for load | 1955 | 444 | May 2023 | Poor |
| Honey Hill Road over Norwalk River | posted for load | 1957 | 380 | October 2023 | Fair |
| Silver Hill Road over Aspetuck River | posted for load | 1920 | 300 | March 2024 | Poor |
| Michaels Way over W Branch Saugatuck River | posted for load | 1995 | 215 | January 2024 | Poor |
| Briarwood Drive over Morrissey Brook | posted for load | 1987 | 21 | November 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Connecticut department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 1 on 12 months or less, 831 on 24 months, 30 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Fairfield County is dated January 2025; 8 bridges have an inspection dated in 2025.
Scour critical (item 113): 46 bridges; 1 over water not yet evaluated for scour. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 32 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fairfield Avenue over Interstate-95 | closed | 2015 | 8,600 | October 2022 | Poor |
| I-95 N on Ramp 316 over Drainage | open | 1955 | 7,100 | October 2023 | Poor |
| Depot Road over Norwalk River | closed | 1910 | – | May 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Interstate-95 over Kings Hwy-goodwives Rv | 1952 | 154,700 | Fair |
| Interstate-95 over Bostwick Ave | 2006 | 154,600 | Fair |
| Interstate-95 over Bport Harbor Rt 130 Mnrr | 1959 | 153,100 | Fair |
| Interstate-95 over Norwalk Rv Hendricks Ave | 1957 | 147,500 | Fair |
| Interstate-95 over Route 136 | 1952 | 143,900 | Fair |
| Interstate-95 over Metro North RR & Station | 1958 | 143,300 | Fair |
| Interstate-95 over Ferris Drive | 1958 | 142,400 | Fair |
| Interstate-95 over Davis Mill Pond | 1958 | 140,400 | Fair |
| Interstate-95 over I-95 Rmp 047/FIVE Mi Riv | 1956 | 136,600 | Fair |
| Interstate-95 over Keeler Avenue | 1956 | 136,600 | Fair |
Frequently asked questions
Are any bridges closed in Fairfield County, Connecticut?
4 bridges of the 862 in Fairfield County are coded closed to all traffic in the 2025 National Bridge Inventory, and 65 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Connecticut department of transportation.
Have any bridges failed in Fairfield County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Fairfield County: 3 bridges with a component rated 2 (critical) or lower, 33 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Fairfield County last inspected?
Inspection dates in the 2025 inventory for Fairfield County run from February 2021 to January 2025. Intervals: 1 on 12 months or less, 831 on 24 months, 30 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Fairfield County → - all 862, busiest first, each with its own condition record.
All of Connecticut: Connecticut bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.