Bridge conditions in Lake County, Florida
116 inventoried bridges · 0 closed · 3 posted · 0 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFair All 116 bridges.
Lake County is one of the counties with a clean sheet: 116 bridges on the federal inventory and not one rated poor. 37 carry a fair rating, which means wear worth watching but no structural deficiency.
- 0 of the 116 bridges in Lake County, Florida, are rated in poor condition (0.0%) in the 2025 National Bridge Inventory, as of .
- Lake County has no bridges closed to all traffic and 3 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 12 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to January 2025.
- 79 bridges (68.1%) are rated good and 37 (31.9%) fair.
- The median Lake County bridge was built in 2004.
What this page is: the federal bridge inspection inventory for Lake County: inspector ratings, closures and load postings as reported by the Florida DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 68.1% · Fair 31.9% · Poor 0.0% of 116 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US-27 SB over US-192 | good to fair; deck 7 to 6 | Good | Fair | 21,750 |
| SR 46 over Wekiva River | substructure 9 to 7 | Fair | Fair | 26,500 |
| Wekiva Pkwy WB over Wldlife Cross 1 & OMD Rd | deck 9 to 8; superstructure 9 to 7; substructure 9 to 8 | Good | Good | 16,400 |
| SR 19 Nb/sb over Little Lake Harris | superstructure 9 to 7 | Good | Good | 15,800 |
| SR-46 over Wldlife Cross 1 & OMD Rd | deck 9 to 8; substructure 9 to 7 | Good | Good | 10,000 |
| US-441 SB to SR-46 over SR-46 and US-441 | deck 9 to 8; superstructure 9 to 7 | Good | Good | 750 |
| Wekiva Pkwy WB over Wildlife Crossing 2 | deck 8 to 7 | Good | Good | 7,500 |
| Wekiva Pkwy EB over Wildlife Crossing 2 | deck 8 to 7 | Good | Good | 7,500 |
| SR 46 over Wildlife Crossing 2 | deck 8 to 7 | Good | Good | 7,300 |
| SR-429 NB over Floodplain | deck 8 to 7 | Good | Good | 5,200 |
| SR-429 SB over Floodplain | substructure 8 to 7 | Good | Good | 5,200 |
| Wekiva Pkwy NB over Wekiva River | substructure 9 to 8 | Fair | Fair | 37,500 |
4 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Wells Avenue over Dora Canal | posted for load | 1959 | 4,463 | August 2023 | Good |
| Bronson Rd. over Crescent Lake Canal | posted for load | 1940 | 1,501 | August 2023 | Fair |
| Pine Meadows Rd. over Hicks Canal | posted for load | 1970 | 151 | January 2025 | Good |
| SR 91 Tpk SB 275.3 over over Old Hwy 50 | open on a temporary structure | 2023 | 32,450 | November 2023 | Good |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Florida department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 115 on 24 months, 1 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Lake County is dated January 2025; 3 bridges have an inspection dated in 2025.
Scour critical (item 113): no bridges; 7 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Bridges rated poor
No bridges in this county carry a poor rating in the current inventory.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| SR91 Tpk NS 278.5 over Triple E. Rd. | 1964 | 75,900 | Fair |
| N Hancock Rd 279 over SR 91 Tpk | 2017 | 75,900 | Good |
| SR 91 Tpk NS 284.4 over Little Everglades Canal | 1964 | 50,000 | Good |
| Bridges Rd 289.7 over SR 91 Tpk | 1964 | 45,300 | Fair |
| US-441 over Dora Canal | 2005 | 45,000 | Good |
| SR 91 Tpk NB 275.3 over CR 50 | 1964 | 37,950 | Good |
| SR 91 Tpk NB 277.1 over Blackstill Lake Rd | 1964 | 37,950 | Good |
| SR 91 Tpk NB 275.3 over Old Highway 50 | 2024 | 37,950 | Good |
| SR 91 Tpk NB 277.1 over Blackstill Lake Rd | 2023 | 37,950 | Good |
| SR 91 Tpk SB 277.1 over Blackstill Lake Rd | 2024 | 37,950 | Good |
Frequently asked questions
Are any bridges closed in Lake County, Florida?
No bridges of the 116 in Lake County are coded closed to all traffic in the 2025 National Bridge Inventory, and 3 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Florida department of transportation.
Have any bridges failed in Lake County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Lake County: no bridges with a component rated 2 (critical) or lower, no bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Lake County last inspected?
Inspection dates in the 2025 inventory for Lake County run from March 2023 to January 2025. Intervals: 115 on 24 months, 1 on other. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Lake County → - all 116, busiest first, each with its own condition record.
All of Florida: Florida bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.