BridgeReportCard
Home › Georgia › Heard County

Bridge conditions in Heard County, Georgia

61 inventoried bridges · 0 closed · 20 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 61 bridges.

The federal inventory lists 61 bridges in Heard County: 39 rated good, 21 fair, and 1 poor.

What this page is: the federal bridge inspection inventory for Heard County: inspector ratings, closures and load postings as reported by the Georgia DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 63.9% · Fair 34.4% · Poor 1.6% of 61 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
5
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Wilson Road over Potato Creekfair to poor; deck 7 to 6; superstructure 5 to 4FairPoor158
SR 100 over Clear Creekgood to fair; substructure 7 to 6GoodFair2,270
Welcome Road over Centralhatchee Creekgood to fair; superstructure 7 to 6GoodFair940
Roosterville Road over Deer Creekgood to fair; culvert 7 to 6GoodFair480
Charlie Johnston R over New Rivergood to fair; superstructure 7 to 6; substructure 7 to 6GoodFair340

Bridges that improved

BridgeWhat changed20242025Vehicles/day
George Brown Road over Hilly Mill Creekfair to good; deck up 6 to 7FairGood158

2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Franklin Pkwy over Chattahoochee Riverposted for load19418,250July 2024Fair
SR 34 over Chattahoochee Riv Trib.posted for load19364,140June 2024Good
Welcome Road over Centralhatchee Creekposted for load1965940July 2024Fair
Bevis Road over Hillabahatachee Creekposted for load1973790July 2024Good
Bevis Road. over Brush Creekposted for load1974790June 2024Fair
Froloma Road over Hillabahatachee Creekposted for load1955700July 2024Fair
Notnomis Road over Centralhatchee Creekposted for load1958519June 2024Good
Rock Mill Road over Wehadkee Creekposted for load1957480July 2024Good
Roosterville Road over Centralhatchee Creekposted for load1956480June 2024Fair
Red Land Road over Hillabahatachee Creekposted for load1979350July 2024Good
Spradlin Road over Deer Creekposted for load1984350June 2024Good
Charlie Johnston R over New Riverposted for load1962340July 2024Fair
Ridgeway Road over Cedar Creekposted for load1969220July 2024Good
Ridgeway Road over Town Creekposted for load1969220July 2024Good
Roggus Road over Brush Creekposted for load1992160June 2024Good
Wilson Road over Potato Creekposted for load2005158July 2024Poor
Five Knot Road over Nut Creekposted for load193690June 2024Fair
Five Knot Road over Pink Creekposted for load198690June 2024Fair
Hutchins Road over Gum Creekposted for load198370June 2024Fair
Jim T Mickel Road over Town Creekposted for load197250June 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Georgia department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 61 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Heard County is dated January 2025; 2 bridges have an inspection dated in 2025.

Scour critical (item 113): no bridges; 21 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Wilson Road over Potato Creek2005158Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Franklin Pkwy over Chattahoochee River19418,250Fair
SR 1/ US 27 Nbl over SR 34/CHATTAHOCHEE River20065,810Good
US 27 Nbl over Potato Creek19745,090Good
US 27 Nbl over New River19835,090Good
SR 34 over Chattahoochee Riv Trib.19364,140Good
SR 34 over Lumpkin Creek19374,140Good
SR 34 over Greenwood Lake Inlet19374,140Fair
SR 34 over Harris Creek19904,140Good
SR 34 over Chattahoochee Riv Trib.20253,390Good
SR 34 over Lumpkin Creek20253,390Good

Frequently asked questions

Are any bridges closed in Heard County, Georgia?

No bridges of the 61 in Heard County are coded closed to all traffic in the 2025 National Bridge Inventory, and 20 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Georgia department of transportation.

Have any bridges failed in Heard County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Heard County: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Heard County last inspected?

Inspection dates in the 2025 inventory for Heard County run from June 2024 to January 2025. Intervals: 61 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Heard County → - all 61, busiest first, each with its own condition record.

All of Georgia: Georgia bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.