BridgeReportCard
Home › Idaho › Blaine County

Bridge conditions in Blaine County, Idaho

96 inventoried bridges · 0 closed · 10 posted · 4 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 96 bridges (1 without coordinates in the inventory is not shown).

Blaine County tracks close to typical: 4 of its 96 inventoried bridges (4.2%) are rated poor, against a national rate of about 7%.

What this page is: the federal bridge inspection inventory for Blaine County: inspector ratings, closures and load postings as reported by the Idaho DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 28.1% · Fair 67.7% · Poor 4.2% of 96 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

2
dropped into poor
since 2024
0
improved out of poor
since 2024
20
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Fdr over North Fork of Wood Riverfair to poor; substructure 5 to 4FairPoor50
Old Highway 93 over Richfield Canalfair to poor; substructure 5 to 4FairPoor10
Fdr over Wood Rivergood to fair; superstructure 7 to 6GoodFair50
Kilpatrick Br. Rd. over Silver Creekdeck 5 to 4; superstructure 5 to 4PoorPoor60
SH 75 over Salmon Riverdeck 6 to 5; superstructure up 7 to 8FairFair1,000
Silverweed Way Rd over Trail Creeksuperstructure 6 to 5FairFair100
Fdr over Wood Riversuperstructure 7 to 6; substructure 6 to 5FairFair70
Fdr over North Fork Wood Riverdeck 6 to 5; superstructure 6 to 5FairFair50
Fdr over North Fork Wood Riversubstructure 6 to 5FairFair50
Fdr over Warm Springs Creeksuperstructure 6 to 5FairFair50
Riverview Street over Bellevue Canalsuperstructure 6 to 5; deck up 6 to 8; substructure up 5 to 6FairFair40
Labrador Lane over Bellevue Canaldeck 7 to 6; superstructure 7 to 6; substructure up 6 to 7FairFair100
River Lane over W.br.little Wood Riversuperstructure 7 to 6FairFair50
Fdr over Wood Riversubstructure 7 to 6FairFair50
Fdr over Smiley Creeksubstructure 7 to 6; deck up 5 to 6FairFair25
STC2822;GLENDALE R over Big Wood Riversuperstructure 8 to 7GoodGood2,000
Old Dollar Road over Trail Creeksuperstructure 8 to 7FairFair1,000
Broadford Road over Big Wood Riversuperstructure 8 to 7GoodGood700
Adams Gulch Road over Big Wood Riverdeck 8 to 7; superstructure 8 to 7; substructure 8 to 7GoodGood630
Foothill Lane over Little Wood Riversuperstructure 8 to 7FairFair80

Bridges that improved

BridgeWhat changed20242025Vehicles/day
East Fork Road over Hyndman Creekfair to good; deck up 7 to 8; superstructure up 6 to 7FairGood700
Pole Creek Road over Salmon Riverfair to good; substructure up 6 to 8FairGood50
Deer Creek Road over Big Wood River;deer CR.fair to good; substructure up 5 to 7FairGood30

2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
STC2815;WARM Sprng over Big Wood Riverposted for load19726,300September 2023Fair
East Fork Road over Hyndman Creekposted for load1994700September 2024Good
Broadway Blvd over Big Wood Riverposted for load2001350September 2023Fair
North Picabo Road over Silver Creek;n.picabo Bposted for load1989140September 2023Fair
Kilpatrick Br. Rd. over Silver Creekposted for load197860September 2024Poor
Stocker Creek Road over Silver Creekposted for load197760October 2023Fair
Pole Creek Road over Salmon Riverposted for load197450September 2024Good
Timberline Road over E. Fk. Wood Riverposted for load192040September 2024Fair
Hi 5 Canyon Road over Little Wood Riverposted for load198630September 2023Fair
Smiley C Airport R over Salmon Riverposted for load195030September 2024Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Idaho department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 2 on 12 months or less, 63 on 24 months, 31 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Blaine County is dated November 2024; 51 bridges have an inspection dated in 2024.

Scour critical (item 113): 2 bridges; 1 over water not yet evaluated for scour; 16 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 4 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
SH 75 over Big Wood Riveropen19581,400July 2024Fair
Kilpatrick Br. Rd. over Silver Creekposted for load197860September 2024Poor

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Kilpatrick Br. Rd. over Silver Creekposted for load197860September 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Kilpatrick Br. Rd. over Silver Creek197860Poor
Fdr over North Fork of Wood River195550Poor
Pr over North Fork Wood River195050Poor
Old Highway 93 over Richfield Canal193210Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
SH 75 over Big Wood River200214,500Good
SH 75 over Big Wood River201714,500Fair
SH 75 over Bellevue Canal19317,000Fair
STC2815;WARM Sprng over Big Wood River19726,300Fair
Dollar Road over Trail Creek19885,000Good
SH 75 over Richfield Canal19554,500Fair
US 93 over Little Wood River19772,900Fair
US 93 over Little Wood River19772,900Fair
STC2818;E Fork Rd over Big Wood River19742,800Fair
SH 75 over Big Wood River19912,400Fair

Frequently asked questions

Are any bridges closed in Blaine County, Idaho?

No bridges of the 96 in Blaine County are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Idaho department of transportation.

Have any bridges failed in Blaine County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Blaine County: 1 bridge with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Blaine County last inspected?

Inspection dates in the 2025 inventory for Blaine County run from May 2021 to November 2024. Intervals: 2 on 12 months or less, 63 on 24 months, 31 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Blaine County → - all 96, busiest first, each with its own condition record.

All of Idaho: Idaho bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.