Bridge conditions in Iroquois County, Illinois
568 inventoried bridges · 4 closed · 27 posted · 83 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 568 bridges.
Of the 568 Iroquois County bridges in the federal inventory, 83 carry a poor rating. That 14.6% share is roughly 2x the national average.
- 83 of the 568 bridges in Iroquois County, Illinois, are rated in poor condition (14.6%) in the 2025 National Bridge Inventory, as of .
- Iroquois County has 4 bridges closed to all traffic and 27 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 4 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 4 bridges dropped into poor condition and 1 bridge improved out of it; 45 bridges had at least one major component rating lowered, 2 were newly closed, 2 newly load-posted.
- 15 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from December 2020 to January 2025; 2 bridges over water are coded scour critical.
- 258 bridges (45.4%) are rated good and 227 (40.0%) fair.
- The median Iroquois County bridge was built in 1983.
- The busiest poor-rated bridge is Fai-57 NB over Ic RR (built 1967), carrying about 9,050 vehicles a day.
What this page is: the federal bridge inspection inventory for Iroquois County: inspector ratings, closures and load postings as reported by the Illinois DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 45.4% · Fair 40.0% · Poor 14.6% of 568 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Tr 49 B over Prairie CR | newly closed; superstructure 4 to 1; substructure 4 to 1 | Poor | Poor | 25 |
| Fas 323 Ch 40 over Possum Trot Ditch | newly closed | Poor | Poor | 300 |
| Fai-57 SB over T.p. & W RR | fair to poor; deck 5 to 4; substructure 6 to 5 | Fair | Poor | 9,050 |
| Ill 49 over Br Pigeon Creek | fair to poor; deck 5 to 4; superstructure 5 to 4 | Fair | Poor | 1,050 |
| Tr 14 over Trib Spring Creek | fair to poor; deck 5 to 4; superstructure 5 to 4 | Fair | Poor | 300 |
| CH 47 / 1200 N Rd over Fai-57 | fair to poor; deck 5 to 4 | Fair | Poor | 150 |
| Ill 49 over Shavetail Creek | newly posted for load | Poor | Poor | 1,000 |
| Tr-290 over Martinton Ditch #3 | newly posted for load | Poor | Poor | 175 |
| Fas327-ch41 over Possum Trot Ditch | good to fair; deck 7 to 6; superstructure 8 to 5 | Good | Fair | 325 |
| Fas 331 CH45 over Fountain Creek | good to fair; substructure 8 to 5 | Good | Fair | 250 |
| Tr 251 over Sugar Creek | good to fair; substructure 8 to 5 | Good | Fair | 200 |
| CH44 FAS1336 over Spring Creek | good to fair; deck 8 to 6; superstructure 7 to 6; substructure 7 to 5 | Good | Fair | 350 |
| Tr 353 over Whiskey Creek | good to fair; substructure 7 to 5 | Good | Fair | 25 |
| I-57 NB over Spring Creek | good to fair; deck 7 to 6 | Good | Fair | 8,800 |
| Tr 58A over I 57 | good to fair; substructure 7 to 6 | Good | Fair | 900 |
| TR142 over Shavetail CR | good to fair; substructure 7 to 6 | Good | Fair | 75 |
| Tr 16 over Stream | substructure 7 to 3 | Poor | Poor | 25 |
| Fai-57 NB over Ic RR | substructure 7 to 5 | Poor | Poor | 9,050 |
| I-57 SB over Langan Creek | deck 6 to 5 | Fair | Fair | 9,550 |
| Fai-57 NB over Langan Creek | deck 6 to 5; superstructure 7 to 6 | Fair | Fair | 9,550 |
| Fai-57 SB over Ic RR | superstructure 6 to 5 | Fair | Fair | 9,050 |
| Fai-57 NB over T. P. & W RR | deck 6 to 5; substructure 6 to 5 | Fair | Fair | 9,050 |
| Fai-57 NB over West Second St | deck 6 to 5; substructure 7 to 6 | Fair | Fair | 9,050 |
| US 24 over I 57 | substructure 6 to 5 | Fair | Fair | 6,800 |
| Fas 321 (ch 4) over I-57 | substructure 6 to 5 | Poor | Poor | 825 |
| Fas 329 Ch 10 Sa 1 over Gay Creek | deck 6 to 5; superstructure 6 to 5 | Fair | Fair | 500 |
| Ch 9 Fas 334 over Spring CR | deck 8 to 7; substructure 6 to 5 | Fair | Fair | 500 |
| Tr 371 over Whiskey Creek | substructure 6 to 5 | Fair | Fair | 75 |
| Tr 89 over I 57 | deck 6 to 5 | Fair | Fair | 50 |
| Tr 243 over Shavetail CR | substructure 6 to 5 | Fair | Fair | 50 |
| Tr 363 over Trib to Pigeon CR | substructure 6 to 5 | Fair | Fair | 50 |
| US 24 over Trib Prairie Creek | substructure 7 to 6 | Fair | Fair | 2,300 |
| Fas 1322 (ch 37) over I-57 | substructure 7 to 6 | Fair | Fair | 850 |
| Twp Rd 35 over I 57 | substructure 7 to 6 | Fair | Fair | 200 |
| Fas 337 CH47 over Trib Spring Creek | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 100 |
| Tr 565 over Spring CR | superstructure 7 to 6 | Poor | Poor | 50 |
| Il 1/FAP 332A over Coon Creek | deck 9 to 7; superstructure 9 to 7; substructure 9 to 8 | Good | Good | 2,450 |
| Il 1 over Pike Creek | deck 8 to 7; superstructure 8 to 7 | Good | Good | 2,250 |
| Tr 363 over Fountain Creek | substructure 8 to 7 | Good | Good | 150 |
| Fas 334 Ch 9 over Trib Sugarcreek | deck 8 to 7; superstructure 8 to 7 | Good | Good | 150 |
Showing the 40 largest of 48 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Tr 200 over Shavetail Creek | fair to good; deck up 6 to 7; superstructure up 6 to 7 | Fair | Good | 50 |
| Tr 4 over Stream | poor to fair; substructure up 4 to 5 | Poor | Fair | 50 |
no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fas 323 Ch 40 over Possum Trot Ditch | closed | 1938 | 300 | August 2024 | Poor |
| Tr 242 over Mud CR | closed | 1917 | 25 | July 2024 | Poor |
| Tr 293 over Little Mud Creek | closed | 1971 | 25 | May 2024 | Poor |
| Tr 49 B over Prairie CR | closed | 1904 | 25 | December 2024 | Poor |
| Ill 49 over Shavetail Creek | posted for load | 1927 | 1,000 | March 2024 | Poor |
| CH44 over Trib Little Mud CR | posted for load | 1964 | 550 | September 2024 | Good |
| Tr 251F over Jefferson Creek | posted for load | 1938 | 425 | June 2024 | Fair |
| Cherry St over Trib of Spring CR | posted for load | 1940 | 200 | July 2024 | Good |
| Tr 91 B over Pike Creek | posted for load | 1958 | 200 | September 2023 | Poor |
| Tr-290 over Martinton Ditch #3 | posted for load | 1959 | 175 | August 2023 | Poor |
| Tr 2C over Hooper Branch | posted for load | 1968 | 150 | August 2023 | Poor |
| Colfax St over Trib of Spring CR | posted for load | 1900 | 125 | July 2024 | Poor |
| Tr 55B over Martinton Dch No 3 | posted for load | 1927 | 125 | April 2023 | Poor |
| Tr 327 over Louis Creek | posted for load | 1966 | 100 | July 2024 | Poor |
| Tr 140 over Trib Praire CR | posted for load | 1962 | 75 | February 2024 | Poor |
| Tr 26A Mft 110 Tr over Louis Creek | posted for load | 1916 | 75 | July 2024 | Poor |
| Tr 282 over Trib Sugar Creek | posted for load | 1910 | 75 | July 2024 | Poor |
| Tr 84 over Br of Spring Creek | posted for load | 1953 | 75 | April 2023 | Poor |
| Tr 126 over Mud CR | posted for load | 1954 | 50 | August 2024 | Poor |
| Tr 27 over Trib Langan Creek | posted for load | 1970 | 50 | September 2023 | Fair |
| Tr 284 (old Rt 1) over Br Sugar Creek | posted for load | 1930 | 50 | August 2024 | Poor |
| Tr 312 over Stream | posted for load | 1954 | 50 | September 2023 | Fair |
| Tr 396 over Trib to Sugar CR | posted for load | 1907 | 50 | June 2024 | Poor |
| Tr 434 over Sugar CR | posted for load | 1921 | 50 | June 2024 | Poor |
| Tr 565 over Spring CR | posted for load | 1915 | 50 | July 2024 | Poor |
| Tr 104 over Trib to Spring CR | posted for load | 1956 | 25 | April 2023 | Poor |
| Tr 168 over Whiskey CR | posted for load | 1929 | 25 | August 2024 | Fair |
| Tr 228 over Jefferson CR | posted for load | 1910 | 25 | June 2024 | Poor |
| Tr 320 over Martinton Ditch #3 | posted for load | 1955 | 25 | April 2023 | Poor |
| Tr 89 over Prairie CR | posted for load | 1976 | 25 | April 2023 | Poor |
| Tr 10B MFT120 over Louis Creek | posted for load | 1962 | 20 | July 2024 | Poor |
| Tr 367 over Spring CR | open on temporary shoring | 1965 | 75 | August 2024 | Fair |
| Tr 108 over Langan Creek | open on temporary shoring | 1983 | 50 | September 2023 | Poor |
| Tr 2 D over Trib to Sugar CR | open on temporary shoring | 1965 | 50 | June 2024 | Poor |
| Tr 16 over Stream | open, posting recommended | 1964 | 25 | March 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Illinois department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 11 on 12 months or less, 333 on 24 months, 224 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Iroquois County is dated January 2025; 5 bridges have an inspection dated in 2025.
Scour critical (item 113): 2 bridges; 1 over water not yet evaluated for scour. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Tr 2E over Kult Ditch | open | 1991 | 25 | May 2023 | Good |
| Tr-2e over Kult Ditch | open | 1991 | 25 | May 2023 | Good |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Tr-290 over Martinton Ditch #3 | posted for load | 1959 | 175 | August 2023 | Poor |
| Tr 2C over Hooper Branch | posted for load | 1968 | 150 | August 2023 | Poor |
| Tr 327 over Louis Creek | posted for load | 1966 | 100 | July 2024 | Poor |
| Tr 108 over Langan Creek | open on temporary shoring | 1983 | 50 | September 2023 | Poor |
| Tr 126 over Mud CR | posted for load | 1954 | 50 | August 2024 | Poor |
| Tr 2 D over Trib to Sugar CR | open on temporary shoring | 1965 | 50 | June 2024 | Poor |
| Tr 41 over Langan Creek | open | 1985 | 50 | September 2023 | Poor |
| Tr 434 over Sugar CR | posted for load | 1921 | 50 | June 2024 | Poor |
| Tr 104 over Trib to Spring CR | posted for load | 1956 | 25 | April 2023 | Poor |
| Tr 242 over Mud CR | closed | 1917 | 25 | July 2024 | Poor |
| Tr 293 over Little Mud Creek | closed | 1971 | 25 | May 2024 | Poor |
| Tr 320 over Martinton Ditch #3 | posted for load | 1955 | 25 | April 2023 | Poor |
| Tr 452 over Stream | open | 1977 | 25 | June 2024 | Poor |
| Tr 49 B over Prairie CR | closed | 1904 | 25 | December 2024 | Poor |
| Tr 89 over Prairie CR | posted for load | 1976 | 25 | April 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-57 over Dranage Ditch | 2015 | 18,100 | Fair |
| I-57 over Dranage Ditch | 2015 | 18,100 | Fair |
| I-57 NB & SB over Prairie Creek | 2015 | 18,100 | Fair |
| Fai-57 over Stream | 1971 | 17,600 | Fair |
| I-57 SB over Langan Creek | 2013 | 9,550 | Fair |
| Fai-57 NB over Langan Creek | 2014 | 9,550 | Fair |
| Fai-57 NB over Fas 317 & Icg RR | 1966 | 9,200 | Fair |
| Fai-57 SB over Fas 317 & Icg RR | 1966 | 9,200 | Fair |
| Fai-57 SB over Ic RR | 1967 | 9,050 | Fair |
| Fai-57 NB over Ic RR | 1967 | 9,050 | Poor |
Frequently asked questions
Are any bridges closed in Iroquois County, Illinois?
4 bridges of the 568 in Iroquois County are coded closed to all traffic in the 2025 National Bridge Inventory, and 27 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Illinois department of transportation.
Have any bridges failed in Iroquois County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Iroquois County: 15 bridges with a component rated 2 (critical) or lower, 83 bridges rated poor overall, and 4 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Iroquois County last inspected?
Inspection dates in the 2025 inventory for Iroquois County run from December 2020 to January 2025. Intervals: 11 on 12 months or less, 333 on 24 months, 224 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Iroquois County → - all 568, busiest first, each with its own condition record.
All of Illinois: Illinois bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.