Bridge conditions in Vermilion County, Illinois
494 inventoried bridges · 2 closed · 7 posted · 31 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 494 bridges.
Vermilion County tracks close to typical: 31 of its 494 inventoried bridges (6.3%) are rated poor, against a national rate of about 7%.
- 31 of the 494 bridges in Vermilion County, Illinois, are rated in poor condition (6.3%) in the 2025 National Bridge Inventory, as of .
- Vermilion County has 2 bridges closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and 2 bridges improved out of it; 15 bridges had at least one major component rating lowered.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2021 to February 2025; 1 bridge over water is coded scour critical.
- 144 bridges (29.1%) are rated good and 319 (64.6%) fair.
- The median Vermilion County bridge was built in 1985.
- The busiest poor-rated bridge is Bowman Ave(fau 704 over Texas Ave (built 1964), carrying about 6,100 vehicles a day.
What this page is: the federal bridge inspection inventory for Vermilion County: inspector ratings, closures and load postings as reported by the Illinois DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 29.1% · Fair 64.6% · Poor 6.3% of 494 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Il 1 US 150 (fap 3 over 14TH St(fau 7010) | good to fair; superstructure 7 to 6 | Good | Fair | 24,700 |
| Tr 261 over Trib to Stony Creek | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 125 |
| Tr 102 over I-74 | superstructure 4 to 2 | Poor | Poor | 75 |
| Ross Ln(fau 7011) over Grape Creek | deck 5 to 3 | Poor | Poor | 2,100 |
| Tr 275 over Lick Creek | substructure 7 to 5 | Fair | Fair | 225 |
| US 136(FAP 729) over Lick Creek | superstructure 6 to 5 | Fair | Fair | 7,300 |
| Fau 7029(LYNCH Spu over CSX RR | substructure 6 to 5 | Fair | Fair | 1,550 |
| Seminary (fau 700 over Stony Creek | deck 7 to 6 | Fair | Fair | 3,450 |
| Fas 509(CH 23) over Fayette Creek | substructure 7 to 6 | Fair | Fair | 850 |
| Voorhees(fau 6999) over Stony Creek | substructure 8 to 7 | Good | Good | 5,750 |
| Ch 1(FAU 7000) over N Fork Vermilion Riv | substructure 8 to 7 | Fair | Fair | 2,050 |
| Fau 7060 over Butler Branch | deck 8 to 7; superstructure 8 to 7 | Good | Good | 675 |
| Tr 296 over Stream | substructure 8 to 7 | Good | Good | 450 |
| I-74 (EB) over Salt Fork Verm River | deck 9 to 8; superstructure 9 to 8; substructure 9 to 8 | Good | Good | 10,600 |
| Fap 840 (il 49) over Drainage Ditch | culvert 9 to 8 | Good | Good | 1,700 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| IL.1/US 150(FAP 33 over I-74 & CD16.23/16.33 | poor to fair; deck up 6 to 7; superstructure up 4 to 6 | Poor | Fair | 19,500 |
| I-74 (WB) over Vermilion River | fair to good; deck up 6 to 7 | Fair | Good | 13,600 |
| I-74 (EB) over "g" St(fau 7026) | fair to good; deck up 5 to 7; superstructure up 6 to 7 | Fair | Good | 11,950 |
| I-74 (WB) over "g" St(fau 7026) | fair to good; deck up 5 to 7; superstructure up 6 to 7 | Fair | Good | 11,950 |
| I-74 (WB) over CSX CorpRR & FR1563 &161 | fair to good; deck up 5 to 7; superstructure up 6 to 7 | Fair | Good | 11,950 |
| Il 49 (fap 840) over Union Pacific Railroad | poor to fair; substructure up 4 to 6 | Poor | Fair | 1,350 |
| Tr 300 over I-74 | fair to good; deck up 6 to 7 | Fair | Good | 50 |
4 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 4 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Tr 313 over Grape Creek | closed | 1900 | 75 | February 2021 | Poor |
| Tr 42A over Middle Fork Verm Riv | closed | 1910 | 10 | February 2022 | Poor |
| Wash. St(ms 8160) over Grape CR | posted for load | 1939 | 700 | February 2025 | Poor |
| Tr 302 over Grape Creek | posted for load | 1972 | 300 | March 2024 | Poor |
| Tr 343 over Grape Creek | posted for load | 1968 | 150 | February 2025 | Poor |
| Tr 725 B over Grape Creek | posted for load | 1900 | 50 | February 2025 | Fair |
| Tr 725 over Grape Creek | posted for load | 1966 | 50 | February 2025 | Poor |
| Tr 81 over Bean Creek | posted for load | 1944 | 50 | February 2023 | Fair |
| Tr 13 over Whisky Creek Branch | posted for load | 1968 | 20 | February 2023 | Poor |
| Fau 7043(PERRYSVIL over I-74&RMPS17.79/17.87 | open, posting recommended | 1962 | 1,200 | December 2024 | Poor |
| Tr 102 over I-74 | open on temporary shoring | 1959 | 75 | December 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Illinois department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 384 on 24 months, 101 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Vermilion County is dated February 2025; 101 bridges have an inspection dated in 2025.
Scour critical (item 113): 1 bridge. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fau 6999(VOORHEES) over E Fork Lick Creek | open | 1962 | 5,000 | January 2024 | Poor |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Tr 102 over I-74 | open on temporary shoring | 1959 | 75 | December 2024 | Poor |
| Tr 8 A over I-74 | open | 1959 | 50 | December 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-74 over Feather Creek | 1959 | 25,200 | Fair |
| Il 1 US 150 (fap 3 over 14TH St(fau 7010) | 1966 | 24,700 | Fair |
| Il 1 US 150 (fap 3 over Vermilion River | 1957 | 23,100 | Fair |
| IL.1/US 150(FAP 33 over I-74 & CD16.23/16.33 | 1965 | 19,500 | Fair |
| Il 1 US 150 (fap 3 over Norfolk Southern Railway | 2003 | 19,500 | Good |
| FAP332(IL 1 US 150 over Grape Creek | 1991 | 18,900 | Fair |
| Il 1 US 136 (fap 3 over Stream | 1938 | 18,800 | Fair |
| I-74 over Lick Creek | 1964 | 18,300 | Good |
| I-74 (WB) over Vermilion River | 1964 | 13,600 | Good |
| I-74 (EB) over Vermilion River | 1964 | 13,600 | Fair |
Frequently asked questions
Are any bridges closed in Vermilion County, Illinois?
2 bridges of the 494 in Vermilion County are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Illinois department of transportation.
Have any bridges failed in Vermilion County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Vermilion County: 2 bridges with a component rated 2 (critical) or lower, 31 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Vermilion County last inspected?
Inspection dates in the 2025 inventory for Vermilion County run from February 2021 to February 2025. Intervals: 9 on 12 months or less, 384 on 24 months, 101 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Vermilion County → - all 494, busiest first, each with its own condition record.
All of Illinois: Illinois bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.