Bridge conditions in Essex County, Massachusetts
397 inventoried bridges · 2 closed · 25 posted · 66 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 397 bridges.
Essex County has 66 bridges rated poor out of 397 inventoried, a 16.6% share that puts it well above the national rate of about 7%.
- 66 of the 397 bridges in Essex County, Massachusetts, are rated in poor condition (16.6%) in the 2025 National Bridge Inventory, as of .
- Essex County has 2 bridges closed to all traffic and 25 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 39 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 4 bridges dropped into poor condition and 6 bridges improved out of it; 31 bridges had at least one major component rating lowered, 1 newly load-posted.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from January 2023 to March 2025; 12 bridges over water are coded scour critical.
- 61 bridges (15.4%) are rated good and 270 (68.0%) fair.
- The median Essex County bridge was built in 1962.
- The busiest poor-rated bridge is US 1 Newbrprt Tpk over I 95 /ST128 (built 1963), carrying about 140,655 vehicles a day.
What this page is: the federal bridge inspection inventory for Essex County: inspector ratings, closures and load postings as reported by the Massachusetts DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 15.4% · Fair 68.0% · Poor 16.6% of 397 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Hwy Plm Isln Tpk over Water Plum Island River | fair to poor; superstructure 6 to 3 | Fair | Poor | 9,172 |
| Hwy Dearbon Rd over Hwy US 1 N Ramp C | fair to poor; deck 6 to 4 | Fair | Poor | 6,200 |
| Hwy Essex St over RR Mbta/bmrr | fair to poor; superstructure 5 to 4 | Fair | Poor | 21,900 |
| Hwy Daisy St over Water Spicket River | fair to poor; deck 5 to 4 | Fair | Poor | 3,202 |
| US 1 over Hwy Merrimac St | newly posted for load | Poor | Poor | 12,065 |
| St 1 A/high Rd over Water Parker River | good to fair; superstructure 8 to 6; substructure 8 to 6 | Good | Fair | 5,172 |
| US 1 Nb/newbry St over St 62 Maple St | good to fair; substructure 7 to 6 | Good | Fair | 23,230 |
| St 97 /ST113/LNCLN over Water Merrimack River | good to fair; superstructure 7 to 6 | Good | Fair | 17,246 |
| Hwy Congress St over Water South River | good to fair; deck 7 to 6; substructure 7 to 6 | Good | Fair | 11,720 |
| Hwy E Broadway over Water Millvale Brook | good to fair; culvert 7 to 6 | Good | Fair | 2,200 |
| ST125 Bridge St over RR Bmrr (abandoned) | deck 3 to 2; superstructure 3 to 2 | Poor | Poor | 27,200 |
| Hwy Tewksbury St over RR CSX | deck 4 to 3; superstructure 4 to 3 | Poor | Poor | 3,500 |
| US 1 Newbrprt Tpk over I 95 /ST128 | substructure 5 to 4 | Poor | Poor | 140,655 |
| I 495 over Hwy Massachusetts Ave | deck 5 to 4; substructure up 4 to 6 | Poor | Poor | 124,334 |
| St 1 A/lynnway over Water Saugus River | superstructure 5 to 4 | Poor | Poor | 85,600 |
| Hwy Oakland Ave over Tr Methuen Rail Trail | deck 5 to 4 | Poor | Poor | 10,220 |
| I 495 NB over ST114 Winthrop Ave | deck 6 to 5 | Fair | Fair | 111,069 |
| I 495 SB over St 28 Sb/n Main St | superstructure 6 to 5 | Poor | Poor | 95,100 |
| I 93 over Hwy Pelham St | superstructure 6 to 5 | Fair | Fair | 72,473 |
| I 495 SB over ST110 /ST113/MERRIMACK | deck 6 to 5 | Poor | Poor | 63,024 |
| I 495 SB over Hwy Haggetts Pond Rd | superstructure 6 to 5 | Fair | Fair | 61,024 |
| ST129 Salem St over US 1 Newburyport Tnpk | superstructure 6 to 5 | Fair | Fair | 40,800 |
| ST128 SB over Hwy Pine St | deck 6 to 5; substructure 6 to 5 | Fair | Fair | 21,920 |
| ST113 Storey Ave over Water Artichoke River | deck 6 to 5; superstructure 6 to 5 | Fair | Fair | 9,310 |
| ST110 Jackson St over Water Spicket River | superstructure 6 to 5 | Fair | Fair | 7,300 |
| Hwy County St over Water Ipswich River | substructure 6 to 5 | Poor | Poor | 2,700 |
| I 95 NB over Hwy Scotland Rd | deck 7 to 6 | Fair | Fair | 63,600 |
| US 1 Nb/newbury over Hwy Lowell St | substructure 7 to 6 | Fair | Fair | 51,522 |
| Hwy Danvers Rd over RR Mbta/bmrr | substructure 7 to 6 | Fair | Fair | 35,400 |
| Hwy Harding St over RR Mbta/bmrr | deck 7 to 6; substructure 7 to 6 | Fair | Fair | 7,900 |
| I 495 SB over Water Merrimack River | deck 8 to 7; superstructure 8 to 7 | Good | Good | 62,167 |
| Hwy Ferry Rd over RR Mbta/bmrr | superstructure 8 to 7 | Good | Good | 2,400 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I 495 NB over ST108 Newton Rd | poor to fair; superstructure up 4 to 5 | Poor | Fair | 67,557 |
| I 495 SB over Hwy Ramps A & B | poor to fair; deck up 4 to 5 | Poor | Fair | 64,284 |
| I 495 NB over Hwy Ramps A & B | poor to fair; deck up 4 to 5 | Poor | Fair | 57,480 |
| I 95 Ramps A&b over US 1 Newbury St | poor to fair; deck up 4 to 5 | Poor | Fair | 36,300 |
| I 495 SB over Hwy Middle Rd | poor to fair; superstructure up 4 to 6; substructure up 5 to 6 | Poor | Fair | 32,629 |
| Hwy Main St over Water Merrimack River | load posting removed | Fair | Fair | 16,700 |
| ST127 Washngton St over Water Hodgkins Cove | poor to fair; substructure up 4 to 5 | Poor | Fair | 12,900 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Hwy Bridge St over Water Bass River | closed | 1929 | 21,300 | November 2024 | Poor |
| Hwy Winthrop St over Water Ipswich River | closed | 1845 | 650 | August 2023 | Poor |
| Hwy Amesbury St over Water South Canal | posted for load | 1918 | 38,100 | October 2024 | Poor |
| ST114 North St over Comb ST107/BRG St&mbta | posted for load | 1952 | 34,513 | September 2024 | Fair |
| ST125 Bridge St over Water Merrimack River | posted for load | 1925 | 33,900 | December 2024 | Poor |
| ST125 Bridge St over RR Bmrr (abandoned) | posted for load | 1850 | 27,200 | February 2025 | Poor |
| St 62 Maple St over Water Ipswich River | posted for load | 1922 | 26,000 | July 2023 | Poor |
| Hwy Lawrence St over Water Spicket River | posted for load | 1939 | 20,200 | September 2024 | Fair |
| Hwy Main St over Water Merrimack River | posted for load | 1909 | 19,271 | December 2023 | Fair |
| St 1 A/high St over US 1 | posted for load | 1934 | 14,930 | July 2024 | Fair |
| St 28 S Broadway over Water South Canal | posted for load | 1939 | 14,432 | October 2024 | Fair |
| US 1 over Hwy Merrimac St | posted for load | 1976 | 12,065 | May 2024 | Poor |
| Hwy Endicott St over RR Abandoned | posted for load | 1937 | 9,180 | July 2024 | Fair |
| ST110 Jackson St over Water Spicket River | posted for load | 1939 | 7,300 | September 2024 | Fair |
| Hwy N Broadway over I 495 NB | posted for load | 1961 | 6,400 | February 2025 | Fair |
| Hwy Village St over Tr Marblehead Rail Tr | posted for load | 1939 | 5,172 | July 2024 | Poor |
| Hwy Kernwood Ave over Water Danvers River | posted for load | 1907 | 4,728 | September 2024 | Poor |
| Hwy Kernwood Ave over Water Danvers River | posted for load | 1907 | 4,728 | September 2024 | Poor |
| ST286 Main St over I 95 | posted for load | 1967 | 4,400 | February 2024 | Fair |
| Hwy Tewksbury St over RR CSX | posted for load | 1980 | 3,500 | December 2024 | Poor |
| St 1 A/main St over RR Mbta | posted for load | 1907 | 3,500 | September 2023 | Poor |
| Hwy School St over RR Mbta | posted for load | 1871 | 3,232 | November 2024 | Poor |
| Hwy Daisy St over Water Spicket River | posted for load | 1939 | 3,202 | September 2024 | Poor |
| Hwy County St over Water Ipswich River | posted for load | 1861 | 2,700 | September 2024 | Poor |
| Hwy Rowley Brg R over Water Ipswich River | posted for load | 1957 | 1,160 | October 2023 | Fair |
| Hwy Oak St over Tr Amesbury Riverwalk | posted for load | 1949 | 1,000 | January 2024 | Fair |
| Hwy Harbor St over RR Mbta | posted for load | 1936 | 900 | January 2024 | Fair |
| US 1 Newbrprt Tpk over I 95 /ST128 | open on temporary shoring | 1963 | 140,655 | May 2024 | Poor |
| I 495 SB over St 28 Sb/n Main St | open on temporary shoring | 1962 | 95,100 | February 2024 | Poor |
| ST128 over Hwy Concord St | open on temporary shoring | 1948 | 90,905 | May 2023 | Fair |
| I 495 & Access Rps over Water Merrimack River | open on temporary shoring | 1962 | 79,000 | October 2024 | Poor |
| I 495 NB over ST108 Newton Rd | open on temporary shoring | 1964 | 67,557 | January 2025 | Fair |
| I 495 SB over ST108 Newton Rd | open on temporary shoring | 1964 | 67,557 | January 2025 | Fair |
| I 495 SB over Water Merrimack River | open on temporary shoring | 1964 | 66,888 | October 2024 | Poor |
| I 495 SB over ST110 /ST113/MERRIMACK | open on temporary shoring | 1963 | 63,024 | April 2024 | Poor |
| I 495 NB & On-ramp over RR Mbta/bmrr | open on temporary shoring | 1962 | 62,500 | July 2024 | Poor |
| I 495 NB over Water Merrimack River | open on temporary shoring | 1964 | 60,056 | November 2024 | Poor |
| I 495 NB over ST110 /ST113/MERRIMACK | open on temporary shoring | 1963 | 58,225 | April 2024 | Poor |
| I 495 SB over St 28 Nb/union St | open on temporary shoring | 1962 | 54,041 | March 2024 | Poor |
| I 495 NB over St 28 Nb/union St | open on temporary shoring | 1962 | 50,658 | March 2024 | Fair |
| I 495 NB over St 28 Sb/n Main St | open on temporary shoring | 1962 | 48,915 | February 2024 | Poor |
| I 95 SB over Other Mbta - Bike Trail | open on temporary shoring | 1974 | 42,634 | April 2023 | Poor |
| I 95 SB over St 62 Maple St | open on temporary shoring | 1972 | 38,090 | March 2023 | Poor |
| I 495 SB over ST110 Amesbury Rd | open on temporary shoring | 1964 | 37,519 | May 2024 | Poor |
| I 95 NB over Other Mbta - Bike Trail | open on temporary shoring | 1974 | 36,615 | April 2023 | Poor |
| I 95 NB over St 62 Maple St | open on temporary shoring | 1972 | 36,201 | March 2023 | Poor |
| I 495 SB over Hwy Main St | open on temporary shoring | 1964 | 35,000 | November 2023 | Fair |
| I 495 NB over Hwy Amesbury Line Rd | open on temporary shoring | 1964 | 31,088 | March 2023 | Fair |
| St 28 N Main St over Water Shawsheen River | open, posting recommended | 1879 | 30,905 | July 2024 | Fair |
| I 495 NB over ST110 | open on temporary shoring | 1964 | 30,724 | June 2024 | Fair |
| I 495 SB over Hwy Amesbury Line Rd | open on temporary shoring | 1964 | 30,681 | March 2023 | Poor |
| ST114 Lafayette St over Water Forest River | open on temporary shoring | 1898 | 27,100 | October 2023 | Fair |
| I 495 NB Ramp N over Comb Sutton St & Mbta | open on temporary shoring | 1963 | 13,684 | May 2024 | Poor |
| ST125 Conn WB over Comb Ferry Rd&mbta/bmrr | open on temporary shoring | 1961 | 13,000 | September 2024 | Fair |
| ST113 Plsnt Val St over I 495 | open on temporary shoring | 1964 | 12,341 | October 2024 | Fair |
| I 495 SB Ramp L over Comb Merrimack St & Mbt | open on temporary shoring | 1963 | 10,371 | June 2024 | Poor |
| ST125 Conn WB over I 495 | open on temporary shoring | 1961 | 10,040 | August 2023 | Poor |
| Hwy Plm Isln Tpk over Water Plum Island River | open on temporary shoring | 1973 | 9,172 | September 2024 | Poor |
| Hwy School St over ST128 | open on temporary shoring | 1952 | 8,650 | January 2024 | Poor |
| Hwy Broad St over I 495 | open on temporary shoring | 1964 | 6,000 | June 2023 | Fair |
| ST125 Conn EB over I 495 | open on temporary shoring | 1961 | 5,450 | August 2023 | Poor |
| Hwy Short St over Water Spicket River | open on temporary shoring | 1850 | 5,255 | September 2024 | Poor |
| Hwy High Pln Rd over I 495 | open on temporary shoring | 1961 | 4,900 | June 2024 | Poor |
| Hwy Perkins Row over Water Mile Brook | open on temporary shoring | 1905 | 3,621 | January 2024 | Poor |
| Hwy Peabody St over Water Ipswich River | open on temporary shoring | 1985 | 3,400 | July 2024 | Fair |
| Hwy Chandler Rd over I 93 | open on temporary shoring | 1959 | 2,850 | March 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Massachusetts department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 65 on 12 months or less, 331 on 24 months, 1 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Essex County is dated March 2025; 42 bridges have an inspection dated in 2025.
Scour critical (item 113): 12 bridges; 1 over water not yet evaluated for scour. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 21 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| I 93 over Water Merrimack River | open | 1959 | 119,818 | June 2023 | Poor |
| I 495 & Access Rps over Water Merrimack River | open on temporary shoring | 1962 | 79,000 | October 2024 | Poor |
| I 495 NB over Water Merrimack River | open on temporary shoring | 1964 | 60,056 | November 2024 | Poor |
| I 95 SB over Water Fish Brook | open | 1950 | 43,600 | July 2023 | Fair |
| I 95 NB over Water Fish Brook | open | 1976 | 43,300 | July 2023 | Fair |
| ST125 Bridge St over Water Merrimack River | posted for load | 1925 | 33,900 | December 2024 | Poor |
| Hwy Amesbury St over Comb Merimac Riv/access | open | 1918 | 25,000 | September 2023 | Fair |
| US 1 Newbrprt Tpk over Water Ipswich River | open | 1850 | 13,394 | June 2024 | Fair |
| St 28 Broadway over Water Spicket River | open | 1850 | 13,010 | January 2025 | Fair |
| St 28 Broadway over Water Spicket River | open | 1900 | 12,808 | July 2024 | Poor |
| Hwy Hampshire Rd over Water Spicket River | open | 1959 | 5,300 | September 2024 | Fair |
| Hwy County St over Water Ipswich River | posted for load | 1861 | 2,700 | September 2024 | Poor |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| ST125 Bridge St over RR Bmrr (abandoned) | posted for load | 1850 | 27,200 | February 2025 | Poor |
| I 495 SB Ramp L over Comb Merrimack St & Mbt | open on temporary shoring | 1963 | 10,371 | June 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I 93 over ST213 WB | 1959 | 186,800 | Fair |
| I 93 over Hwy Dascomb Rd | 1957 | 145,580 | Fair |
| I 93 over ST213 EB | 1959 | 144,946 | Fair |
| I 95 /ST128 over I 95 Ramp J | 1988 | 144,936 | Fair |
| I 95 /ST128 over Hwy Main St | 1948 | 143,473 | Fair |
| US 1 Newbrprt Tpk over I 95 /ST128 | 1963 | 140,655 | Poor |
| I 93 over Hwy Riverside Dr | 1959 | 133,000 | Fair |
| I 495 over Water Fish Brook | 1961 | 130,023 | Good |
| I 495 over Hwy Massachusetts Ave | 1963 | 124,334 | Poor |
| I 93 over Water Merrimack River | 1959 | 119,818 | Poor |
Frequently asked questions
Are any bridges closed in Essex County, Massachusetts?
2 bridges of the 397 in Essex County are coded closed to all traffic in the 2025 National Bridge Inventory, and 25 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Massachusetts department of transportation.
Have any bridges failed in Essex County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Essex County: 2 bridges with a component rated 2 (critical) or lower, 66 bridges rated poor overall, and 4 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Essex County last inspected?
Inspection dates in the 2025 inventory for Essex County run from January 2023 to March 2025. Intervals: 65 on 12 months or less, 331 on 24 months, 1 on other. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Essex County → - all 397, busiest first, each with its own condition record.
All of Massachusetts: Massachusetts bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.