Bridge conditions in Plymouth County, Massachusetts
288 inventoried bridges · 3 closed · 24 posted · 17 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 288 bridges.
Plymouth County tracks close to typical: 17 of its 288 inventoried bridges (5.9%) are rated poor, against a national rate of about 7%.
- 17 of the 288 bridges in Plymouth County, Massachusetts, are rated in poor condition (5.9%) in the 2025 National Bridge Inventory, as of .
- Plymouth County has 3 bridges closed to all traffic and 24 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 38 bridges had at least one major component rating lowered, 2 were newly closed.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from November 2022 to March 2025; 5 bridges over water are coded scour critical.
- 82 bridges (28.5%) are rated good and 189 (65.6%) fair.
- The median Plymouth County bridge was built in 1962.
- The busiest poor-rated bridge is St 3 NB over Water North River (built 1961), carrying about 43,207 vehicles a day.
What this page is: the federal bridge inspection inventory for Plymouth County: inspector ratings, closures and load postings as reported by the Massachusetts DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 28.5% · Fair 65.6% · Poor 5.9% of 288 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Hwy River St over Hwy Plimoth Plntn Hwy | newly closed | Poor | Poor | 5,200 |
| Hwy East St over St 3 Pilgrim Hwy | newly closed | Fair | Fair | 2,200 |
| Hwy Pleasant St over St 24 | fair to poor; superstructure 5 to 4 | Fair | Poor | 16,900 |
| St 3 Sb/plgrm Hwy over Hwy Billington St | good to fair; deck 7 to 6 | Good | Fair | 34,495 |
| St 3 A/cshng Hwy over RR Mbta | good to fair; superstructure 7 to 6 | Good | Fair | 23,017 |
| Hwy W Chestnt St over Water Coweeset Brook | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 14,643 |
| US 44 WB (con A) over St 3 Pilgrim Hwy | good to fair; superstructure 7 to 6 | Good | Fair | 10,571 |
| Hwy W Elm St over Water Indian Head River | good to fair; superstructure 7 to 6 | Good | Fair | 8,017 |
| US 44 EB (con D) over St 3 Pilgrim Hwy | good to fair; superstructure 7 to 6 | Good | Fair | 7,870 |
| Hwy Wood St over I 495 | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 3,621 |
| St 80 over US 44 | good to fair; superstructure 7 to 6 | Good | Fair | 3,200 |
| St 3 NB Plgrm Hwy over ST228 Hingham St | superstructure 6 to 5 | Fair | Fair | 72,284 |
| St 3 Sb/plgrm Hwy over US 44 Samoset St | superstructure 6 to 5 | Fair | Fair | 52,500 |
| ST123 Belmont St over Water Salisbury Brook | superstructure 6 to 5 | Fair | Fair | 20,043 |
| I 195 EB over RR Macrr | superstructure 6 to 5 | Fair | Fair | 17,850 |
| US 6 Wareham Road over Water Weweantic River | superstructure 6 to 5 | Poor | Poor | 9,017 |
| Hwy Grove St over RR Mbta/csx | deck 6 to 5; superstructure 6 to 5 | Fair | Fair | 8,857 |
| US 6 Sandwich Rd over Water Agawam River | deck 6 to 5 | Fair | Fair | 7,286 |
| Hwy Pickens St over ST140 NB | superstructure 6 to 5 | Fair | Fair | 2,456 |
| Hwy Otis St over Water Salisbury Brook | substructure 6 to 5 | Fair | Fair | 1,600 |
| Hwy Murdock St over Water Nemasket River | substructure 6 to 5 | Fair | Fair | 1,552 |
| Hwy Ship Pond Rd over St 3 Sb/pilgrim Hwy | superstructure 6 to 5; substructure 7 to 6 | Fair | Fair | 1,034 |
| St 3 Nb/plgrm Hwy over US 44 Samoset St | deck 7 to 6 | Fair | Fair | 60,500 |
| US 44 Harding St over I 495 | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 46,163 |
| I 495 SB over St 24 SB | deck 7 to 6 | Fair | Fair | 42,987 |
| US 44 Harding St over Hwy Carmel St | substructure 7 to 6 | Fair | Fair | 29,400 |
| St 18 Bedford St over Water Forge Pond | substructure 7 to 6 | Fair | Fair | 24,500 |
| I 495 SB over Hwy Charlotte Furnc Rd | substructure 7 to 6 | Fair | Fair | 22,546 |
| St 28 Cranbrry Hwy over Water Weweantic River | superstructure 7 to 6 | Fair | Fair | 21,336 |
| St 3 Nb/plgrm Hwy over Hwy Hedges Pond Rd | superstructure 7 to 6 | Fair | Fair | 18,394 |
| Hwy Sargents Way over RR Mbta/csx | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 11,120 |
| Hwy South St over Water Winnetuxet River | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 647 |
| Hwy Beach St over Water Cut River | superstructure 9 to 7; substructure 8 to 7 | Good | Good | 800 |
| St 3 NB Plgm Hwy over ST123 Webster St | deck 8 to 7; substructure 8 to 7 | Good | Good | 64,267 |
| St 3 NB Plgm Hwy over Hwy High St | deck 8 to 7; substructure 8 to 7 | Good | Good | 64,267 |
| St 3 SB Plgm Hwy over ST123 Webster St | deck 8 to 7; substructure 8 to 7 | Good | Good | 39,576 |
| St 3 SB Plgm Hwy over Hwy High St | substructure 8 to 7 | Good | Good | 34,714 |
| Hwy Broadway over Water Indian Head River | substructure 8 to 7 | Good | Good | 8,664 |
| Hwy W Union St over RR Mbta Mp 24/440 | deck 8 to 7; superstructure 8 to 7; substructure 8 to 7 | Good | Good | 6,600 |
| Hwy Newfield St over Water Town Brook | deck 8 to 7; superstructure 8 to 7 | Good | Good | 3,491 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Hwy Central St over Water Shumatuscacant Riv | reopened; poor to good; deck up 3 to 8; superstructure up 3 to 8 | Poor | Good | 10,345 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Hwy River St over Hwy Plimoth Plntn Hwy | closed | 1951 | 5,200 | November 2024 | Poor |
| Hwy East St over St 3 Pilgrim Hwy | closed | 1962 | 2,200 | November 2024 | Fair |
| Hwy Forest St over Water Town River | closed | 1968 | 776 | July 2023 | Poor |
| St 3 A/main St over Water South River | posted for load | 1947 | 28,241 | July 2023 | Fair |
| Hwy G Wshngtn Bl over Water Weir River | posted for load | 1987 | 25,474 | September 2023 | Fair |
| St 18 Bedford St over Water Forge Pond | posted for load | 1893 | 24,500 | April 2024 | Fair |
| Hwy Grove St over Water Salisbury Plain R | posted for load | 1910 | 21,500 | March 2024 | Fair |
| St 28 S Main St over Water Town River | posted for load | 1897 | 20,043 | May 2024 | Fair |
| St 27 Main St over Water Poor Meadow Brook | posted for load | 1850 | 17,456 | August 2024 | Fair |
| ST140 NB over Hwy County St | posted for load | 1958 | 15,388 | October 2023 | Fair |
| Hwy Fearing Hill over Water Weweantic River | posted for load | 1900 | 9,300 | September 2023 | Poor |
| Hwy Pleasant St over Water Salisbury Plain R | posted for load | 1921 | 8,500 | October 2024 | Fair |
| Hwy Spring St over Water Matfield River | posted for load | 1946 | 8,146 | October 2024 | Good |
| Hwy West St over Water Cowessett Brook | posted for load | 1935 | 6,724 | May 2024 | Fair |
| Hwy West St over St 24 | posted for load | 1953 | 5,571 | September 2023 | Poor |
| Hwy County Rd over Water Sippican River | posted for load | 1938 | 2,786 | July 2023 | Fair |
| Hwy Green St over Water Taunton River | posted for load | 1922 | 2,429 | July 2024 | Fair |
| Hwy Belmont Ave over Water Salisbury Brook | posted for load | 1850 | 2,357 | November 2023 | Fair |
| Hwy Pond Street over Water Satucket River | posted for load | 1850 | 2,143 | November 2023 | Poor |
| Hwy Washngton St over Water North River | posted for load | 1904 | 2,071 | August 2024 | Fair |
| Hwy Powder Pt Av over Water Duxbury Bay | posted for load | 1987 | 2,023 | November 2024 | Poor |
| Hwy Hayward St over Water Town River | posted for load | 1946 | 2,000 | September 2023 | Fair |
| Hwy Walnut St over St 24 | posted for load | 1953 | 1,966 | September 2023 | Poor |
| Hwy Oak St over Water Town River | posted for load | 1880 | 1,164 | July 2024 | Fair |
| Hwy South St over Water Winnetuxet River | posted for load | 1931 | 647 | June 2024 | Fair |
| Hwy River St over Water Winnetuxet River | posted for load | 1951 | 642 | June 2023 | Fair |
| Hwy Winnetuxt Rd over Water Winnetuxet River | posted for load | 1923 | 517 | August 2024 | Fair |
| Hwy Otis St over Water Salisbury Brook | open on temporary shoring | 1913 | 1,600 | April 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Massachusetts department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 19 on 12 months or less, 269 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Plymouth County is dated March 2025; 32 bridges have an inspection dated in 2025.
Scour critical (item 113): 5 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 4 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| St 28 Montello St over Water Salisbury Brook | open | 1889 | 16,300 | January 2024 | Good |
| Hwy Onset Ave over Water East River | open | 1914 | 15,000 | June 2024 | Fair |
| US 6 Wareham Road over Water Weweantic River | open | 1929 | 9,017 | October 2024 | Poor |
| US 6 Marion Rd over Water Weweantic River | open | 1929 | 8,214 | October 2024 | Poor |
| Hwy Country Way over Water Bound Brook | open | 2008 | 5,560 | July 2023 | Good |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Hwy Forest St over Water Town River | closed | 1968 | 776 | July 2023 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| St 3 NB over Water North River | 1961 | 43,207 | Poor |
| St 3 SB over Water North River | 1961 | 40,879 | Poor |
| St 3 Nb/plgrm Hwy over Hwy Franklin St | 1962 | 34,314 | Poor |
| US 44 Harding St over RR Mbta/csx | 1963 | 31,681 | Poor |
| St 3 Sb/plgrm Hwy over Hwy Franklin St | 1962 | 24,431 | Poor |
| Hwy Pleasant St over St 24 | 1954 | 16,900 | Poor |
| Hwy Fearing Hill over Water Weweantic River | 1900 | 9,300 | Poor |
| US 6 Wareham Road over Water Weweantic River | 1929 | 9,017 | Poor |
| US 6 Marion Rd over Water Weweantic River | 1929 | 8,214 | Poor |
| Hwy West St over St 24 | 1953 | 5,571 | Poor |
| Hwy River St over Hwy Plimoth Plntn Hwy | 1951 | 5,200 | Poor |
| Hwy Pond Street over Water Satucket River | 1850 | 2,143 | Poor |
| Hwy Powder Pt Av over Water Duxbury Bay | 1987 | 2,023 | Poor |
| Hwy Walnut St over St 24 | 1953 | 1,966 | Poor |
| Hwy Vernon St over Water Taunton River | 1956 | 1,786 | Poor |
| Hwy Tihonet Rd over St 25 | 1967 | 1,071 | Poor |
| Hwy Forest St over Water Town River | 1968 | 776 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| St 3 Pilgrim Hwy over Water Jones River | 1955 | 128,534 | Fair |
| St 3 Pilgrim Hwy over Hwy Long Pond Rd | 1950 | 127,758 | Fair |
| St 24 over Hwy Oak St | 1955 | 118,909 | Fair |
| St 24 over Hwy Torrey St | 1954 | 106,550 | Fair |
| St 24 over Hwy W Chestnut St | 1954 | 101,540 | Fair |
| St 24 over Water Town River | 1952 | 95,798 | Fair |
| St 24 over Hwy S Elm St | 1953 | 95,798 | Fair |
| St 3 Pilgrim Hwy over RR Mbta | 1954 | 89,571 | Fair |
| St 24 NB over I 495 | 1979 | 80,302 | Fair |
| St 3 NB Plgrm Hwy over ST228 Hingham St | 1960 | 72,284 | Fair |
Frequently asked questions
Are any bridges closed in Plymouth County, Massachusetts?
3 bridges of the 288 in Plymouth County are coded closed to all traffic in the 2025 National Bridge Inventory, and 24 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Massachusetts department of transportation.
Have any bridges failed in Plymouth County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Plymouth County: 1 bridge with a component rated 2 (critical) or lower, 17 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Plymouth County last inspected?
Inspection dates in the 2025 inventory for Plymouth County run from November 2022 to March 2025. Intervals: 19 on 12 months or less, 269 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Plymouth County → - all 288, busiest first, each with its own condition record.
All of Massachusetts: Massachusetts bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.