69 inventoried bridges · 0 closed · 5 posted · 17 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 69 bridges.
Hancock County has 17 bridges rated poor out of 69 inventoried, a 24.6% share that puts it well above the national rate of about 7%.
- 17 of the 69 bridges in Hancock County, Maine, are rated in poor condition (24.6%) in the 2025 National Bridge Inventory, as of .
- Hancock County has no bridges closed to all traffic and 5 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 2 bridges dropped into poor condition and no bridges improved out of it; 10 bridges had at least one major component rating lowered.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from April 2023 to December 2024; 4 bridges over water are coded scour critical.
- 16 bridges (23.2%) are rated good and 36 (52.2%) fair.
- The median Hancock County bridge was built in 1958.
- The busiest poor-rated bridge is Main St over Union River (built 1923), carrying about 16,449 vehicles a day.
What this page is: the federal bridge inspection inventory for Hancock County: inspector ratings, closures and load postings as reported by the Maine DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 23.2% · Fair 52.2% · Poor 24.6% of 69 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Peabody Dr over Little Harbor Brook | fair to poor; deck 5 to 4; superstructure 5 to 4; substructure 7 to 6 | Fair | Poor | 2,688 |
| Mariaville Rd over Reeds Brk/graham Lake In | fair to poor; deck 5 to 4; superstructure 5 to 4; substructure 5 to 4 | Fair | Poor | 2,328 |
| Irr Pistol Lake Rd over Pistol Stream | good to fair; deck 7 to 6 | Good | Fair | 5 |
| Ledgelawn Av over Cromwell Brook | deck 6 to 4; superstructure 6 to 3 | Poor | Poor | 489 |
| Tremont Rd over Cousins Creek | deck 6 to 5; superstructure 6 to 5 | Fair | Fair | 2,418 |
| Main Rd over M C RR | superstructure 7 to 6 | Fair | Fair | 10,891 |
| N Bend Rd over Outlet Patten Pond | deck 7 to 6 | Fair | Fair | 903 |
| Route 1 over Kilkenny St | substructure 8 to 7 | Good | Good | 12,782 |
| Route 1 over Taunton River | deck 8 to 7 | Good | Good | 7,522 |
| Bridge Rd over Bagaduce Falls(tidal) | deck 8 to 7; superstructure 8 to 7; substructure 8 to 7 | Good | Good | 1,274 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| One-way Park Loop over Otter Cove Creek | fair to good; deck up 6 to 7 | Fair | Good | 1,214 |
| Jordan Pond Road over Carriage Road | fair to good; deck up 6 to 7 | Fair | Good | 288 |
no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Little Deer Isle R over Eggemoggin Reach | posted, other restriction | 1939 | 4,800 | April 2023 | Fair |
| E Blue Hill over Mcheards Cove | posted for load | 1956 | 756 | May 2024 | Poor |
| Mariaville Rd over Tannery Brook | posted for load | 1937 | 688 | July 2024 | Poor |
| Tannery Loop Rd over West Branch Union River | posted for load | 1956 | 54 | November 2024 | Poor |
| Goose Falls Rd over Goose Falls(tidal Estu) | posted for load | 1949 | 44 | October 2023 | Poor |
| Oceanville Rd over Oceanville Thoroughfare | open on temporary shoring | 1940 | 1,047 | May 2024 | Poor |
| Ledgelawn Av over Cromwell Brook | open on a temporary structure | 1945 | 489 | March 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Maine department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 5 on 12 months or less, 64 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Hancock County is dated December 2024; 57 bridges have an inspection dated in 2024.
Scour critical (item 113): 4 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 8 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Bar Harbor Rd over Mt Desert Narrows | open | 1958 | 15,122 | May 2024 | Fair |
| Bald Mountain Rd over Moosehorn Creek | open | 1951 | 291 | August 2024 | Poor |
| Guzzle Rd over West Bay Stream | open | 1980 | 126 | May 2024 | Poor |
| Upper Long Pond Rd over Moosehorn Stream | open | 2009 | 58 | July 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Bald Mountain Rd over Moosehorn Creek | open | 1951 | 291 | August 2024 | Poor |
| Guzzle Rd over West Bay Stream | open | 1980 | 126 | May 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Main St over Union River | 1923 | 16,449 | Poor |
| Main St over Mill Stream | 1923 | 9,693 | Poor |
| Route 1 over Carrying Place | 1930 | 9,100 | Poor |
| Peabody Dr over Little Harbor Brook | 1978 | 2,688 | Poor |
| Mariaville Rd over Reeds Brk/graham Lake In | 1948 | 2,328 | Poor |
| Southern Bay Rd over Winslow Stream | 1936 | 2,051 | Poor |
| Lower Dedham Rd over Phillips Lake Outlet | 1983 | 2,030 | Poor |
| State Route 46 over Moosehorn Creek | 1935 | 1,716 | Poor |
| Oceanville Rd over Oceanville Thoroughfare | 1940 | 1,047 | Poor |
| Toddy Pond Rd over Meadow Brook | 1940 | 831 | Poor |
| E Blue Hill over Mcheards Cove | 1956 | 756 | Poor |
| Mariaville Rd over Tannery Brook | 1937 | 688 | Poor |
| Ledgelawn Av over Cromwell Brook | 1945 | 489 | Poor |
| Bald Mountain Rd over Moosehorn Creek | 1951 | 291 | Poor |
| Guzzle Rd over West Bay Stream | 1980 | 126 | Poor |
| Tannery Loop Rd over West Branch Union River | 1956 | 54 | Poor |
| Goose Falls Rd over Goose Falls(tidal Estu) | 1949 | 44 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Main St over Union River | 1923 | 16,449 | Poor |
| Bangor Rd over Union River | 1981 | 15,759 | Fair |
| Bar Harbor Rd over Mt Desert Narrows | 1958 | 15,122 | Fair |
| Route 1 over Kilkenny St | 2000 | 12,782 | Good |
| Maine Route 233 over Hulls Cove Road | 1928 | 12,768 | Fair |
| Main Rd over M C RR | 1973 | 10,891 | Fair |
| Route 1 over Penobscot Riv (E Chan) | 1988 | 10,092 | Fair |
| Main St over Mill Stream | 1923 | 9,693 | Poor |
| Route 1 over Carrying Place | 1930 | 9,100 | Poor |
| Acadia Hwy over Narramissic River | 1961 | 8,056 | Fair |
Frequently asked questions
Are any bridges closed in Hancock County, Maine?
No bridges of the 69 in Hancock County are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Maine department of transportation.
Have any bridges failed in Hancock County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Hancock County: 2 bridges with a component rated 2 (critical) or lower, 17 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Hancock County last inspected?
Inspection dates in the 2025 inventory for Hancock County run from April 2023 to December 2024. Intervals: 5 on 12 months or less, 64 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Hancock County → - all 69, busiest first, each with its own condition record.
All of Maine: Maine bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.