BridgeReportCard
Home › Michigan › Chippewa County

Bridge conditions in Chippewa County, Michigan

112 inventoried bridges · 0 closed · 24 posted · 13 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 112 bridges.

About one in 9 bridges in Chippewa County is rated in poor condition: 13 of 112 on the federal inventory, one of the higher shares in Michigan.

What this page is: the federal bridge inspection inventory for Chippewa County: inspector ratings, closures and load postings as reported by the Michigan DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 23.2% · Fair 65.2% · Poor 11.6% of 112 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
1
improved out of poor
since 2024
8
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
12 Mile Road over Charlotte Riversuperstructure 4 to 3PoorPoor50
Riverside Drive over Little Munuscong Rsuperstructure 5 to 4PoorPoor111
East-west Rd over Roxbury Creeksubstructure 5 to 4PoorPoor30
Huckleberry Road over Carp Riversuperstructure 5 to 4PoorPoor22
M-48 over I-75 NBsuperstructure 6 to 5; deck up 5 to 6FairFair605
M-129|dixie Hwy over Charlotte Riversuperstructure 7 to 6FairFair4,061
Riverside Drive over Munuscong Riversuperstructure 7 to 6FairFair111
M-129|pickford Rd over S Br Charlotte Riversuperstructure 8 to 7GoodGood3,500

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Mackinac Trail over Charlotte Riverpoor to goodPoorGood452

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
I-75 Intl Bridge over St Mary Riv/portage Av Wposted for load19625,242August 2023Fair
Gogomain Road over Munuscong Riverposted for load1991985June 2023Fair
Old Mackinac Trail over Pine Riverposted for load1931216June 2024Poor
Riverside Drive over Charlotte Riverposted for load1959165June 2023Fair
Scenic Drive over Charlotte Riverposted for load1987100June 2023Fair
Tuori Rd over South Br of Waiska Riverposted for load1993100June 2023Fair
12 Mile Road over Charlotte Riverposted for load190750June 2024Poor
Sullivan Creek Tr. over Black Creekposted for load195050October 2024Fair
Forrest Rd over East Br Waiska Riverposted for load199045June 2023Fair
Sullivan Crk Trail over Black Creekposted for load195040June 2023Fair
East-west Rd over Roxbury Creekposted for load194730October 2024Poor
East-west Road over Ankodosh Creekposted for load194830June 2023Fair
East-west Road over Naomikong Creekposted for load194730June 2023Fair
East-west Road over Roxbury Creekposted for load194730June 2023Fair
Huckleberry Road over Carp Riverposted for load196522June 2024Poor
16 Mile Rd over Little Munnscingposted for load200120June 2024Poor
Aldrich Road over East Br Munuscong Riverposted for load200220June 2023Fair
10 Mile Road over S Branch Charlotte Riverposted for load200510June 2023Good
8 Mile Road over Sailors Creekposted for load197510June 2023Fair
Betsy Tower Road over Betsy Riverposted for load200410June 2023Fair
Humms Road over Private Truck Haul Roadposted for load196010June 2023Fair
Pennington Road over East Br Munuscong Riverposted for load199010June 2024Poor
Usfs Rte 3199 over Hendrie Riverposted for load198010October 2024Fair
Obrien Road over East Br Munuscong Riverposted for load20045June 2023Fair

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Michigan department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 11 on 12 months or less, 99 on 24 months, 2 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Chippewa County is dated December 2024; 36 bridges have an inspection dated in 2024.

Scour critical (item 113): 6 bridges; 7 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 5 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
M-28 over W Br Waiska Riveropen19752,956May 2023Fair
Gogomain Road over Gogomain Riveropen1980220June 2023Fair
Old Mackinac Trail over Pine Riverposted for load1931216June 2024Poor
Curley Lewis FH42 over Roxbury Creekopen197483June 2024Poor
12 Mile Road over Charlotte Riverposted for load190750June 2024Poor
Huckleberry Road over Carp Riverposted for load196522June 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
M-129|pickford Rd over Fletcher Creek19293,344Poor
M-28 over Hendrie River19602,127Poor
Old Mackinac Trail over Pine River1931216Poor
Mackinac Trail over Chub Creek1933216Poor
Riverside Drive over Little Munuscong R1977111Poor
Curley Lewis FH42 over Roxbury Creek197483Poor
North Hulbert Road over Tahquamenon River198654Poor
12 Mile Road over Charlotte River190750Poor
East-west Rd over Roxbury Creek194730Poor
East-west Rd over Naomikong CR194730Poor
Huckleberry Road over Carp River196522Poor
16 Mile Rd over Little Munnscing200120Poor
Pennington Road over East Br Munuscong River199010Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
I-75 BS|3 Mile Rd over I-75 NB196215,700Fair
I-75 Bs (ashmun) over Power Canal193410,180Fair
Easterday Ave. over Ashmun Creek19948,347Good
Easterday Ave over I-75 NB19627,774Fair
West Portage Ave. over Power Canal19707,637Fair
Spruce St. over Power Canal19835,995Fair
Fort Street over Power Canal20045,883Good
I-75 Intl Bridge over St Mary Riv/portage Av W19625,242Fair
Bingham Ave. over Power Canal19765,200Fair
Riverside Drive over Mission Creek20135,071Good

Frequently asked questions

Are any bridges closed in Chippewa County, Michigan?

No bridges of the 112 in Chippewa County are coded closed to all traffic in the 2025 National Bridge Inventory, and 24 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Michigan department of transportation.

Have any bridges failed in Chippewa County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Chippewa County: no bridges with a component rated 2 (critical) or lower, 13 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Chippewa County last inspected?

Inspection dates in the 2025 inventory for Chippewa County run from April 2023 to December 2024. Intervals: 11 on 12 months or less, 99 on 24 months, 2 on other. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Chippewa County → - all 112, busiest first, each with its own condition record.

All of Michigan: Michigan bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.