BridgeReportCard
Home › Michigan › Emmet County

Bridge conditions in Emmet County, Michigan

38 inventoried bridges · 0 closed · 5 posted · 1 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 38 bridges.

The federal inventory lists 38 bridges in Emmet County: 21 rated good, 16 fair, and 1 poor.

What this page is: the federal bridge inspection inventory for Emmet County: inspector ratings, closures and load postings as reported by the Michigan DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 55.3% · Fair 42.1% · Poor 2.6% of 38 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
8
had a rating lowered
deck, superstructure, substructure or culvert
1
newly closed or posted
0 closed, 1 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Click Road over Bear Rivernewly posted for load; good to poor; substructure 7 to 4; deck up 7 to 8; superstructure up 7 to 8GoodPoor1,001
I-75 S Appr over Huron Avegood to fair; deck 8 to 7; superstructure 8 to 7; substructure 8 to 6GoodFair11,076
I-75 over Straits of Mackinacgood to fair; deck 7 to 6; superstructure 7 to 6; substructure 8 to 7GoodFair11,926
I-75 N Appr over Straits of Mackinacgood to fair; substructure 7 to 6GoodFair11,076
Bridge Street over Bear Rivergood to fair; substructure 7 to 6GoodFair2,382
US-23 SB over I-75 NBdeck 9 to 8; superstructure 9 to 7GoodGood1,148
Standish Street over Bear Riversubstructure 8 to 7GoodGood2,238
Robinson Rd over Maple Riverdeck 9 to 8; superstructure 9 to 8; substructure 9 to 8GoodGood2,394

1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
I-75 over Straits of Mackinacposted for load195711,926July 2024Fair
I-75 N Appr over Straits of Mackinacposted for load194211,076July 2024Fair
I-75 S Appr over Huron Aveposted for load195711,076July 2024Fair
Bridge Street over Bear Riverposted for load19762,382November 2024Fair
Click Road over Bear Riverposted for load20121,001August 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Michigan department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 4 on 12 months or less, 34 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Emmet County is dated November 2024; 32 bridges have an inspection dated in 2024.

Scour critical (item 113): 1 bridge; 1 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
US-31|W Mitchellst over Bear Riveropen193028,667July 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Click Road over Bear River20121,001Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
US-31|W Mitchellst over Bear River193028,667Fair
I-75 over Straits of Mackinac195711,926Fair
I-75 S Appr over Huron Ave195711,076Fair
I-75 N Appr over Straits of Mackinac194211,076Fair
I-75 NB over D&m RR (abn)195710,100Fair
I-75 NB over Central St195710,100Fair
M-68 over Crooked River19378,053Fair
Sheridan Road over Bear River19726,190Fair
US-31|STIMSON St over Maple River19415,952Fair
US-31 over Carp Lake River19334,661Fair

Frequently asked questions

Are any bridges closed in Emmet County, Michigan?

No bridges of the 38 in Emmet County are coded closed to all traffic in the 2025 National Bridge Inventory, and 5 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Michigan department of transportation.

Have any bridges failed in Emmet County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Emmet County: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Emmet County last inspected?

Inspection dates in the 2025 inventory for Emmet County run from July 2023 to November 2024. Intervals: 4 on 12 months or less, 34 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Emmet County → - all 38, busiest first, each with its own condition record.

All of Michigan: Michigan bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.