Bridge conditions in Kanabec County, Minnesota
82 inventoried bridges · 0 closed · 17 posted · 3 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 82 bridges.
The federal inventory lists 82 bridges in Kanabec County: 47 rated good, 32 fair, and 3 poor.
- 3 of the 82 bridges in Kanabec County, Minnesota, are rated in poor condition (3.7%) in the 2025 National Bridge Inventory, as of .
- Kanabec County has no bridges closed to all traffic and 17 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 7 bridges had at least one major component rating lowered.
- Inspection dates on record run from October 2021 to December 2024; 5 bridges over water are coded scour critical.
- 47 bridges (57.3%) are rated good and 32 (39.0%) fair.
- The median Kanabec County bridge was built in 1989.
- The busiest poor-rated bridge is Csah 12 over Groundhouse River (built 1971), carrying about 380 vehicles a day.
What this page is: the federal bridge inspection inventory for Kanabec County: inspector ratings, closures and load postings as reported by the Minnesota DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 57.3% · Fair 39.0% · Poor 3.7% of 82 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Mn 65 over Groundhouse River | good to fair; deck 8 to 7; substructure 7 to 6 | Good | Fair | 5,975 |
| Mn 23 over Mud Creek | good to fair; culvert 7 to 6 | Good | Fair | 3,343 |
| Mn 47 over Groundhouse River | superstructure 7 to 6; substructure up 6 to 7 | Fair | Fair | 1,613 |
| Mn 47 over Stream | deck 8 to 7 | Good | Good | 1,613 |
| Mn 27 over Hay Creek | culvert 8 to 7 | Good | Good | 971 |
| Mn 65 over Snake River | superstructure 9 to 8; substructure 9 to 8 | Good | Good | 11,800 |
| Mn 47 over Little Ann River | superstructure 9 to 8; substructure 9 to 8 | Good | Good | 1,256 |
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Csah 11 over Snake River | posted for load | 1988 | 1,100 | November 2023 | Fair |
| Csah 3 over Snowshoe Brook | posted for load | 1986 | 1,100 | November 2023 | Fair |
| Csah 6 over Ann River | posted for load | 1969 | 1,100 | November 2023 | Fair |
| Csah 3 over Knife River | posted for load | 1975 | 450 | November 2023 | Fair |
| Csah 4 over S Fk Groundhouse River | posted for load | 1972 | 440 | October 2023 | Fair |
| Csah 19 over Knife River | posted for load | 1970 | 385 | November 2023 | Fair |
| Csah 12 over Groundhouse River | posted for load | 1971 | 380 | November 2024 | Poor |
| Csah 5 over Mud Creek | posted for load | 1969 | 360 | November 2023 | Fair |
| T 507 over S Fk Groundhouse River | posted for load | 1968 | 90 | November 2023 | Fair |
| Csah 10 over Groundhouse River | posted for load | 1987 | 85 | November 2023 | Good |
| CR 55 over Groundhouse River | posted for load | 1985 | 75 | November 2023 | Good |
| CR 77 over Knife River | posted for load | 1973 | 70 | November 2023 | Fair |
| CR 49 over S Fk Groundhouse River | posted for load | 1989 | 60 | October 2023 | Good |
| CR 68 over Mud Creek | posted for load | 1962 | 50 | November 2024 | Poor |
| CR 53 over Groundhouse River | posted for load | 1974 | 35 | November 2023 | Fair |
| T 24 over S Fk Grindstone River | posted for load | 1930 | 23 | November 2024 | Fair |
| T 94 over Mud Creek | posted for load | 1957 | 13 | November 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Minnesota department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 5 on 12 months or less, 51 on 24 months, 26 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Kanabec County is dated December 2024; 42 bridges have an inspection dated in 2024.
Scour critical (item 113): 5 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Csah 6 over Snake River | open | 1980 | 3,750 | November 2023 | Fair |
| Csah 3 over Snake River | open | 1986 | 1,100 | November 2023 | Fair |
| Csah 6 over Ann River | posted for load | 1969 | 1,100 | November 2023 | Fair |
| Csah 5 over Mud Creek | posted for load | 1969 | 360 | November 2023 | Fair |
| T 507 over S Fk Groundhouse River | posted for load | 1968 | 90 | November 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Csah 12 over Groundhouse River | 1971 | 380 | Poor |
| Csah 17 over Mud Creek | 1975 | 115 | Poor |
| CR 68 over Mud Creek | 1962 | 50 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Mn 65 over Snake River | 2022 | 11,800 | Good |
| Mn 65 over Ann River | 2007 | 7,000 | Good |
| Mn 23 over S Fk Groundhouse River | 2024 | 6,290 | Good |
| Mn 23 over Groundhouse River | 1998 | 6,000 | Good |
| Mn 65 over Groundhouse River | 2007 | 5,975 | Fair |
| Mn 23 over Ann River | 1951 | 5,800 | Fair |
| Mn 65 over Snake River | 1989 | 3,788 | Fair |
| Csah 6 over Snake River | 1980 | 3,750 | Fair |
| Mn 23 over Mud Creek | 1953 | 3,343 | Fair |
| Mn 107 over Snake River | 2009 | 2,600 | Good |
Frequently asked questions
Are any bridges closed in Kanabec County, Minnesota?
No bridges of the 82 in Kanabec County are coded closed to all traffic in the 2025 National Bridge Inventory, and 17 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Minnesota department of transportation.
Have any bridges failed in Kanabec County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Kanabec County: no bridges with a component rated 2 (critical) or lower, 3 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Kanabec County last inspected?
Inspection dates in the 2025 inventory for Kanabec County run from October 2021 to December 2024. Intervals: 5 on 12 months or less, 51 on 24 months, 26 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Kanabec County → - all 82, busiest first, each with its own condition record.
All of Minnesota: Minnesota bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.