Bridge conditions in Quitman County, Mississippi
105 inventoried bridges · 1 closed · 16 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 105 bridges.
6 of the 105 bridges the federal inventory lists in Quitman County are rated poor; the rest split 58 good and 41 fair.
- 6 of the 105 bridges in Quitman County, Mississippi, are rated in poor condition (5.7%) in the 2025 National Bridge Inventory, as of .
- Quitman County has 1 bridge closed to all traffic and 16 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 7 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, no bridges dropped into poor condition and no bridges improved out of it; 7 bridges had at least one major component rating lowered.
- 3 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from January 2023 to December 2024; 1 bridge over water is coded scour critical.
- 58 bridges (55.2%) are rated good and 41 (39.0%) fair.
- The median Quitman County bridge was built in 1976.
- The busiest poor-rated bridge is Crenshaw Road over Coldwater River Cutoff (built 1962), carrying about 210 vehicles a day.
What this page is: the federal bridge inspection inventory for Quitman County: inspector ratings, closures and load postings as reported by the Mississippi DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 55.2% · Fair 39.0% · Poor 5.7% of 105 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| SR 315 over Ditch | good to fair; culvert 7 to 5 | Good | Fair | 610 |
| Eason Road over Coldwater River | good to fair; substructure 7 to 6 | Good | Fair | 150 |
| Bill Street Road over Whiting Chute | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 50 |
| SR 315 over Coldwater River | deck 6 to 5 | Fair | Fair | 560 |
| SR 315 over Coldwater Cut Off Canal | deck 7 to 6 | Fair | Fair | 610 |
| Sections Road over Opossum Bayou | deck 7 to 6 | Fair | Fair | 140 |
| Hood Road over Marks Cutoff | deck 9 to 8; superstructure 9 to 8; substructure 9 to 8 | Good | Good | 270 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Hood Road over Beech Bayou | load posting removed | Fair | Fair | 260 |
| Hood Road over Quitman-panola Ditch | load posting removed | Fair | Fair | 260 |
| Gps:wright Rd over Bush Outlet | load posting removed | Fair | Fair | 40 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 3 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Dean Road over Yellow Lake Bayou Cutoff | closed | 1940 | 60 | September 2024 | Poor |
| US 278 over Canal | posted for load | 1940 | 4,500 | August 2024 | Fair |
| US 278 over Canal | posted for load | 1940 | 4,500 | August 2024 | Fair |
| SR 3 over Davids Bayou | posted for load | 1949 | 1,400 | October 2024 | Fair |
| SR 3 over Cassidy Bayou | posted for load | 1949 | 880 | October 2024 | Fair |
| SR 322 over Coldwater River | posted for load | 1953 | 840 | January 2024 | Fair |
| SR 315 over Coldwater Cut Off Canal | posted for load | 1962 | 610 | September 2024 | Fair |
| Sabino Road over Drainage Ditch | posted for load | 1962 | 400 | December 2023 | Fair |
| Sabino Road (1848) over Opossum Bayou | posted for load | 1964 | 370 | October 2024 | Fair |
| Putman Road over Coldwater River | posted for load | 1963 | 340 | December 2024 | Fair |
| Crenshaw Road over Coldwater River Cutoff | posted for load | 1962 | 210 | December 2024 | Poor |
| Sections Road over Opossum Bayou | posted for load | 1966 | 140 | October 2024 | Fair |
| Airport Road over Bayou | posted for load | 1960 | 120 | October 2024 | Fair |
| Mitchell Road over Burrell Byu | posted for load | 1967 | 120 | December 2023 | Fair |
| Alex Gates Road over Drainage Ditch | posted for load | 1970 | 110 | October 2024 | Poor |
| Red Lake Road over Burrell Bayou | posted for load | 1965 | 100 | December 2023 | Fair |
| Henry Rd over C of E Canal | posted for load | 1963 | 40 | December 2023 | Fair |
| Hood Road over Beech Bayou | open, posting recommended | 1965 | 260 | October 2024 | Fair |
| Hood Road over Quitman-panola Ditch | open, posting recommended | 1965 | 260 | October 2024 | Fair |
| Buck Armstead Road over Yellow Lake Bayou | open on a temporary structure | 1992 | 230 | September 2024 | Fair |
| Road to Field over Drainage Ditch | open on a temporary structure | 1963 | 140 | September 2024 | Poor |
| Dry Bayou Road over Hurricane Bayou | open on a temporary structure | 1958 | 70 | September 2024 | Poor |
| Gps:wright Rd over Bush Outlet | open, posting recommended | 1969 | 40 | October 2024 | Fair |
| Road to Field over Drainage Ditch | open on a temporary structure | 1972 | 40 | September 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Mississippi department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 20 on 12 months or less, 85 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Quitman County is dated December 2024; 35 bridges have an inspection dated in 2024.
Scour critical (item 113): 1 bridge; 23 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Walnut Road over Opossum Outlet | open | 2004 | 80 | February 2023 | Good |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Road to Field over Drainage Ditch | open on a temporary structure | 1963 | 140 | September 2024 | Poor |
| Dry Bayou Road over Hurricane Bayou | open on a temporary structure | 1958 | 70 | September 2024 | Poor |
| Road to Field over Drainage Ditch | open on a temporary structure | 1972 | 40 | September 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Crenshaw Road over Coldwater River Cutoff | 1962 | 210 | Poor |
| Road to Field over Drainage Ditch | 1963 | 140 | Poor |
| Alex Gates Road over Drainage Ditch | 1970 | 110 | Poor |
| Dry Bayou Road over Hurricane Bayou | 1958 | 70 | Poor |
| Dean Road over Yellow Lake Bayou Cutoff | 1940 | 60 | Poor |
| Road to Field over Drainage Ditch | 1972 | 40 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 278/SR 6 over Ashlog Bayou | 2017 | 5,300 | Good |
| US 278/SR 6 over Bobo Bayou | 2017 | 5,300 | Good |
| US 278 over Relief Opening | 1940 | 5,300 | Fair |
| US 278/SR 6 over Onemile Bayou | 2017 | 4,500 | Good |
| US 278/SR 6 over Quitman-panola Ditch | 2017 | 4,500 | Good |
| US 278 over Canal | 1940 | 4,500 | Fair |
| US 278 over Canal | 1940 | 4,500 | Fair |
| US 278 over Stream | 1940 | 4,500 | Fair |
| US 278 over Stream | 1940 | 4,500 | Fair |
| US 278 over Coldwater River | 2024 | 4,500 | Good |
Frequently asked questions
Are any bridges closed in Quitman County, Mississippi?
1 bridge of the 105 in Quitman County is coded closed to all traffic in the 2025 National Bridge Inventory, and 16 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Mississippi department of transportation.
Have any bridges failed in Quitman County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Quitman County: 3 bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Quitman County last inspected?
Inspection dates in the 2025 inventory for Quitman County run from January 2023 to December 2024. Intervals: 20 on 12 months or less, 85 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Quitman County → - all 105, busiest first, each with its own condition record.
All of Mississippi: Mississippi bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.