Bridge conditions in McCone County, Montana
43 inventoried bridges · 0 closed · 10 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 43 bridges.
The federal inventory lists 43 bridges in McCone County: 5 rated good, 34 fair, and 4 poor.
- 4 of the 43 bridges in McCone County, Montana, are rated in poor condition (9.3%) in the 2025 National Bridge Inventory, as of .
- McCone County has no bridges closed to all traffic and 10 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 7 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to January 2025; 3 bridges over water are coded scour critical.
- 5 bridges (11.6%) are rated good and 34 (79.1%) fair.
- The median McCone County bridge was built in 1962.
- The busiest poor-rated bridge is S 200 over Cemetery Coulee (built 1939), carrying about 680 vehicles a day.
What this page is: the federal bridge inspection inventory for McCone County: inspector ratings, closures and load postings as reported by the Montana DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 11.6% · Fair 79.1% · Poor 9.3% of 43 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| S 253 over Redwater River | fair to poor; superstructure 6 to 5; substructure 7 to 4 | Fair | Poor | 420 |
| S 200 over Skull Creek | substructure 6 to 5 | Fair | Fair | 680 |
| S 200 over Drainage | superstructure 6 to 5 | Poor | Poor | 680 |
| S 200 over Drainage | superstructure 6 to 5 | Poor | Poor | 680 |
| S 200 over Cottonwood Creek | superstructure 6 to 5 | Fair | Fair | 238 |
| S 252-horse CR Rd over Horse Creek | superstructure 6 to 5; substructure up 5 to 6 | Fair | Fair | 104 |
| S 200 over Drainage | substructure 7 to 6 | Fair | Fair | 680 |
no structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| S 200 over Drainage | posted for load | 1939 | 680 | October 2024 | Poor |
| S 200 over Skull Creek | posted for load | 1939 | 680 | October 2024 | Fair |
| S 200 over Timber Creek | posted for load | 1939 | 680 | October 2024 | Fair |
| S 253 over Redwater River | posted for load | 1950 | 420 | October 2024 | Poor |
| S 200 over Buffalo Spring Creek | posted for load | 1960 | 238 | September 2024 | Fair |
| S 200 over Cottonwood Creek | posted for load | 1960 | 238 | September 2024 | Fair |
| S 252-horse CR Rd over Horse Creek | posted for load | 1950 | 198 | September 2024 | Fair |
| S 252-horse CR Rd over Horse Creek | posted for load | 1950 | 104 | September 2024 | Fair |
| Nickwall Rd over Nickwall Creek 012 | posted for load | 1970 | 100 | August 2024 | Fair |
| S 467-union Rd over Mccune Creek | posted for load | 1962 | 77 | April 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Montana department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 43 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in McCone County is dated January 2025; 2 bridges have an inspection dated in 2025.
Scour critical (item 113): 3 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| S 24 over Timber Creek | open | 1960 | 153 | March 2023 | Fair |
| Weldon Rd over Shade Creek 019 | open | 1970 | 100 | March 2023 | Fair |
| S 528 over Prairie Elk Creek 021 | open | 1972 | 76 | March 2023 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| S 200 over Cemetery Coulee | 1939 | 680 | Poor |
| S 200 over Drainage | 1939 | 680 | Poor |
| S 200 over Drainage | 1939 | 680 | Poor |
| S 253 over Redwater River | 1950 | 420 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| S 200 over Redwater River | 1933 | 1,263 | Fair |
| Irr - S 13 over Drainage | 1995 | 985 | Fair |
| Irr - S 13 over Drainage-stockpass | 1995 | 985 | Good |
| Irr - S 13 over Nickwall Creek | 1995 | 985 | Fair |
| S 200S over Buffalo Spring Creek | 1966 | 971 | Fair |
| S 13 over Horse Creek | 1988 | 910 | Fair |
| S 13 over Lost Creek | 1988 | 910 | Fair |
| Irr - S 13 over Gady Coulee | 1994 | 905 | Fair |
| S 13 over Wolf Creek | 1993 | 901 | Fair |
| S 13 over Drainage | 1994 | 901 | Good |
Frequently asked questions
Are any bridges closed in McCone County, Montana?
No bridges of the 43 in McCone County are coded closed to all traffic in the 2025 National Bridge Inventory, and 10 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Montana department of transportation.
Have any bridges failed in McCone County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for McCone County: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in McCone County last inspected?
Inspection dates in the 2025 inventory for McCone County run from March 2023 to January 2025. Intervals: 43 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in McCone County → - all 43, busiest first, each with its own condition record.
All of Montana: Montana bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.