Bridge conditions in Valley County, Montana
103 inventoried bridges · 0 closed · 30 posted · 11 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 103 bridges.
Of the 103 Valley County bridges in the federal inventory, 11 carry a poor rating. That 10.7% share is roughly 2x the national average.
- 11 of the 103 bridges in Valley County, Montana, are rated in poor condition (10.7%) in the 2025 National Bridge Inventory, as of .
- Valley County has no bridges closed to all traffic and 30 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 3 bridges dropped into poor condition and 1 bridge improved out of it; 22 bridges had at least one major component rating lowered, 1 newly load-posted.
- Inspection dates on record run from May 2023 to December 2024; 2 bridges over water are coded scour critical.
- 16 bridges (15.5%) are rated good and 76 (73.8%) fair.
- The median Valley County bridge was built in 1981.
- The busiest poor-rated bridge is SR 117 over Missouri River Overflow (built 1950), carrying about 818 vehicles a day.
What this page is: the federal bridge inspection inventory for Valley County: inspector ratings, closures and load postings as reported by the Montana DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 15.5% · Fair 73.8% · Poor 10.7% of 103 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Cache Creek Rd over Little Snake Creek 048 | fair to poor; substructure 5 to 4 | Fair | Poor | 100 |
| Fox Farm Rd over Lindeke Coulee 007 | fair to poor; superstructure 5 to 4 | Fair | Poor | 100 |
| Bengochea Rd over E Fk Porcupine Creek 112 | fair to poor; substructure 5 to 4 | Fair | Poor | 100 |
| Tampico Rd N over Buggy Creek 095 | newly posted for load | Fair | Fair | 100 |
| US 2 over Porcupine Creek Overflow | good to fair; deck 7 to 6 | Good | Fair | 1,584 |
| Tampico Rd over Vandalia South Canal 003 | culvert 4 to 3 | Poor | Poor | 39 |
| Irr Bia Rte 30 over Main Canal | substructure 7 to 5 | Fair | Fair | 225 |
| Irr - US 2 over Indian Service Canal | substructure 6 to 5 | Fair | Fair | 1,514 |
| US 2 over Beaver Creek Overflow | culvert 6 to 5 | Fair | Fair | 1,310 |
| S 248 over W Fork Poplar River | superstructure 6 to 5 | Fair | Fair | 194 |
| Berge Rd over Little Porcupine CR 015 | substructure 6 to 5 | Fair | Fair | 100 |
| Geer Rd over Sargent Creek 001 | substructure 6 to 5 | Fair | Fair | 100 |
| Billingsley Rd over Vandalia South Canal 076 | culvert 6 to 5 | Fair | Fair | 100 |
| Brazil Creek Rd over Vandalia South Canal 113 | deck 8 to 7; substructure 6 to 5 | Fair | Fair | 100 |
| County Road 605 over Irrigation Canal 107 | substructure 6 to 5 | Fair | Fair | 100 |
| S 24 over Roanwood Creek | culvert 6 to 5 | Fair | Fair | 31 |
| Hinsdale N Rd over Bluff Creek 044 | substructure 6 to 5 | Fair | Fair | 14 |
| S 24 over Milk River | substructure 7 to 6 | Fair | Fair | 912 |
| Skylark Rd over Cherry Creek 093 | deck 7 to 6 | Fair | Fair | 100 |
| Burns Rd over Rock Creek Canal 029 | deck 7 to 6 | Fair | Fair | 100 |
| US 2 over Beaver Creek | superstructure 8 to 7 | Fair | Fair | 1,310 |
| US 2 over Unger Coulee | deck 8 to 7; substructure 8 to 7 | Good | Good | 1,209 |
| Irr Bia Route 1 over Little Porcupine Creek | superstructure 8 to 7 | Fair | Fair | 1,200 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Hinsdale N Rd over Snake Creek 042 | load posting removed; superstructure up 6 to 7 | Fair | Fair | 100 |
| Rock CR Dam Rd over Rock Creek 098 | poor to fair; substructure up 4 to 6 | Poor | Fair | 100 |
| Fox Farm Rd over Drainage 009 | load posting removed | Fair | Fair | 100 |
6 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 7 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Irr - US 2 over Indian Service Canal | posted for load | 1960 | 1,514 | October 2024 | Fair |
| S 248 over W Fork Poplar River | posted for load | 1948 | 194 | August 2024 | Fair |
| Aitken Rd over Cherry Creek 080 | posted for load | 1938 | 100 | May 2024 | Fair |
| Baylor Rd over Mid Fk Porcupine CR 013 | posted for load | 1960 | 100 | August 2024 | Fair |
| Bengochea Rd over E Fk Porcupine Creek 112 | posted for load | 1960 | 100 | August 2024 | Poor |
| Bentonite Rd over Vandalia South Canal 089 | posted for load | 1938 | 100 | April 2024 | Poor |
| Billingsley Rd over Vandalia South Canal 074 | posted for load | 1997 | 100 | November 2024 | Fair |
| Cache Creek Rd over Little Snake Creek 048 | posted for load | 1965 | 100 | October 2024 | Poor |
| Cache Creek Rd over Middle Fork Cash CR 049 | posted for load | 1960 | 100 | October 2024 | Fair |
| County Road 605 over Irrigation Canal 107 | posted for load | 1950 | 100 | March 2024 | Fair |
| Fox Farm Rd over Hay Coulee 006 | posted for load | 1930 | 100 | November 2024 | Fair |
| Geer Rd over E Fk Porcupine Creek 002 | posted for load | 1960 | 100 | November 2024 | Fair |
| Hentges Rd over Little Porcupine CR 064 | posted for load | 1965 | 100 | November 2024 | Poor |
| N Bench Rd over West Fork Poplar R 026 | posted for load | 1975 | 100 | November 2024 | Fair |
| New Deal Rd over Galpin Coulee 073 | posted for load | 1960 | 100 | May 2024 | Fair |
| Oberg Rd over Vandalia South Canal 078 | posted for load | 1989 | 100 | November 2024 | Poor |
| Old Hwy 2 over Beaver Creek 115 | posted for load | 1931 | 100 | May 2024 | Poor |
| Riverside Dr over Richardson Coulee 090 | posted for load | 1986 | 100 | April 2024 | Fair |
| Rock CR Dam Rd over Rock Creek 098 | posted for load | 1955 | 100 | May 2024 | Fair |
| Tampico Rd N over Buggy Creek 095 | posted for load | 2000 | 100 | November 2024 | Fair |
| Beaverton Rd over Beaver Creek 104 | posted for load | 1915 | 68 | May 2024 | Fair |
| Larb Creek Rd over Blanche Coulee 084 | posted for load | 1960 | 51 | April 2024 | Fair |
| Larb Creek Rd over South Coulee 085 | posted for load | 1960 | 51 | April 2024 | Fair |
| Vandalia Rd over Vandalia South Canal 011 | posted for load | 1991 | 29 | November 2024 | Fair |
| 2009: Tc Access over Willow Creek | posted for load | 1967 | 25 | September 2024 | Fair |
| Montfort Rd over Buffalo Coulee 108 | posted for load | 1950 | 23 | November 2024 | Poor |
| Beaver Creek Rd over Larb Creek 106 | posted for load | 1987 | 19 | April 2024 | Fair |
| Hinsdale N Rd over Bluff Creek 044 | posted for load | 1973 | 14 | October 2024 | Fair |
| Hinsdale N Rd over Crow Creek 043 | posted for load | 1960 | 14 | October 2024 | Fair |
| Snake Creek Rd over Snake Creek 046 | posted for load | 1986 | 14 | October 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Montana department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 103 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Valley County is dated December 2024; 96 bridges have an inspection dated in 2024.
Scour critical (item 113): 2 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 6 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| N Bench Rd over West Fork Poplar R 026 | posted for load | 1975 | 100 | November 2024 | Fair |
| Rock CR Dam Rd over Rock Creek 098 | posted for load | 1955 | 100 | May 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| SR 117 over Missouri River Overflow | 1950 | 818 | Poor |
| Cache Creek Rd over Little Snake Creek 048 | 1965 | 100 | Poor |
| Fox Farm Rd over Lindeke Coulee 007 | 1930 | 100 | Poor |
| Bengochea Rd over E Fk Porcupine Creek 112 | 1960 | 100 | Poor |
| Bentonite Rd over Vandalia South Canal 089 | 1938 | 100 | Poor |
| Hentges Rd over Little Porcupine CR 064 | 1965 | 100 | Poor |
| Old Hwy 2 over Beaver Creek 115 | 1931 | 100 | Poor |
| Oberg Rd over Vandalia South Canal 078 | 1989 | 100 | Poor |
| Tampico Rd over Vandalia South Canal 003 | 2002 | 39 | Poor |
| Vandalia Rd over Milk River 012 | 1989 | 29 | Poor |
| Montfort Rd over Buffalo Coulee 108 | 1950 | 23 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 2 over Cherry Creek Overflow | 1980 | 5,857 | Fair |
| US 2 over Cherry Creek | 1979 | 5,857 | Fair |
| US 2 over Goudge Coulee | 1994 | 1,967 | Fair |
| US 2 over Whately Creek | 1987 | 1,967 | Fair |
| US 2 over Porcupine Creek | 2006 | 1,584 | Fair |
| US 2 over Porcupine Creek Overflow | 2006 | 1,584 | Fair |
| Irr - US 2 over Indian Service Canal | 1960 | 1,514 | Fair |
| US 2 over Chapman Coulee | 2024 | 1,484 | Good |
| US 2 over Mooney Coulee | 2024 | 1,484 | Good |
| US 2 over Richardson Coulee | 1979 | 1,484 | Fair |
Frequently asked questions
Are any bridges closed in Valley County, Montana?
No bridges of the 103 in Valley County are coded closed to all traffic in the 2025 National Bridge Inventory, and 30 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Montana department of transportation.
Have any bridges failed in Valley County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Valley County: no bridges with a component rated 2 (critical) or lower, 11 bridges rated poor overall, and 3 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Valley County last inspected?
Inspection dates in the 2025 inventory for Valley County run from May 2023 to December 2024. Intervals: 103 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Valley County → - all 103, busiest first, each with its own condition record.
All of Montana: Montana bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.