Bridge conditions in Ashe County, North Carolina
242 inventoried bridges · 1 closed · 56 posted · 53 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 242 bridges (1 without coordinates in the inventory is not shown).
About one in 5 bridges in Ashe County is rated in poor condition: 53 of 242 on the federal inventory, one of the higher shares in North Carolina.
- 53 of the 242 bridges in Ashe County, North Carolina, are rated in poor condition (21.9%) in the 2025 National Bridge Inventory, as of .
- Ashe County has 1 bridge closed to all traffic and 56 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 3 bridges dropped into poor condition and 5 bridges improved out of it; 42 bridges had at least one major component rating lowered, 4 newly load-posted.
- Inspection dates on record run from March 2021 to December 2024; 1 bridge over water is coded scour critical.
- 87 bridges (36.0%) are rated good and 102 (42.1%) fair.
- The median Ashe County bridge was built in 1982.
- The busiest poor-rated bridge is NC88 194 over Buffalo Creek (built 1949), carrying about 6,800 vehicles a day.
What this page is: the federal bridge inspection inventory for Ashe County: inspector ratings, closures and load postings as reported by the North Carolina DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 36.0% · Fair 42.1% · Poor 21.9% of 242 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| NC194 over Big Horse Creek | fair to poor; superstructure 5 to 4; substructure 5 to 4 | Fair | Poor | 3,800 |
| NC88 over North Fork New River | fair to poor; superstructure 5 to 4; substructure 7 to 6 | Fair | Poor | 1,700 |
| SR1539 over Helton Creek | fair to poor; superstructure 6 to 5; substructure 5 to 4 | Fair | Poor | 70 |
| SR1119 over North Fork New River | newly posted for load; deck 5 to 4; superstructure 6 to 4 | Poor | Poor | 160 |
| SR1573 over Grassy Creek | newly posted for load; substructure 5 to 4 | Poor | Poor | 200 |
| NC88 194 over Buffalo Creek | newly posted for load | Poor | Poor | 6,800 |
| SR1138 over Old Field Creek | newly posted for load | Fair | Fair | 350 |
| SR1319 over Middle Fork Horse Creek | good to fair; substructure 8 to 6 | Good | Fair | 250 |
| NC88 over Rich Hill Creek | good to fair; culvert 7 to 6 | Good | Fair | 1,700 |
| SR1313 over Big Laurel Creek | good to fair; substructure 7 to 6 | Good | Fair | 50 |
| SR1324 over Little Horse Creek | superstructure 4 to 3 | Poor | Poor | 250 |
| SR1514 over North Fork New River | substructure 5 to 4 | Poor | Poor | 1,300 |
| SR1120 over North Fork New River | substructure 5 to 4 | Poor | Poor | 560 |
| SR1100 over Three Top Creek | deck 6 to 5; superstructure 5 to 4 | Poor | Poor | 500 |
| SR1118 over North Fork New River | substructure 5 to 4 | Poor | Poor | 350 |
| SR1308 over Cabbage Creek | superstructure 5 to 4 | Poor | Poor | 350 |
| NC88 over Naked Creek | superstructure 6 to 5 | Fair | Fair | 6,800 |
| NC88 over Big Laurel Creek | substructure 6 to 5 | Fair | Fair | 1,700 |
| SR1353 over Big Horse Creek | substructure 6 to 5 | Fair | Fair | 770 |
| SR1133 over Buffalo Creek | deck 6 to 5; superstructure 6 to 5 | Poor | Poor | 670 |
| NC88 over North Fork New River | substructure 6 to 5 | Poor | Poor | 600 |
| SR1100 over Elk Creek | culvert 6 to 5 | Fair | Fair | 600 |
| NC88 over Brush Fork Creek | culvert 6 to 5 | Fair | Fair | 550 |
| NC88 over North Fork New River | substructure 6 to 5 | Poor | Poor | 500 |
| NC194 over Helton Creek | substructure 6 to 5 | Poor | Poor | 500 |
| SR1100 over Ut to Three Top Creek | deck 6 to 5; superstructure 6 to 5; substructure 7 to 6 | Fair | Fair | 430 |
| SR1100 over Three Top Creek | superstructure 6 to 5; substructure 6 to 5 | Fair | Fair | 430 |
| SR1592 over Dog Creek | superstructure 6 to 5 | Poor | Poor | 200 |
| SR1552 over North Fork New River | substructure 6 to 5 | Fair | Fair | 100 |
| SR1609 over Cranberry Creek | substructure 6 to 5 | Fair | Fair | 100 |
| SR1553 over Ut to N. Fork New River | poor to fair; superstructure 6 to 5; substructure up 4 to 6 | Poor | Fair | 100 |
| SR1529 over Long Branch | culvert 6 to 5 | Fair | Fair | 80 |
| SR1100 over Long Hope Creek | superstructure 7 to 6 | Fair | Fair | 500 |
| SR1637 over Little Buffalo Creek | substructure 7 to 6 | Fair | Fair | 100 |
| SR1324 over Big Horse Creek | deck 8 to 7; superstructure 8 to 7; substructure 9 to 7 | Good | Good | 900 |
| SR1509 over Claybank Creek | deck 9 to 8; superstructure 9 to 7; substructure 8 to 7 | Good | Good | 560 |
| SR1181 over South Beaver Creek | deck 8 to 7; superstructure 8 to 7 | Good | Good | 700 |
| SR1342 over North Fork New River | superstructure 8 to 7 | Fair | Fair | 400 |
| SR1138 over Buffalo Creek | deck 8 to 7 | Fair | Fair | 360 |
| SR1118 over North Fork New River | deck 8 to 7 | Good | Good | 350 |
Showing the 40 largest of 44 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| NC88 over Cranberry Creek | poor to good; deck up 4 to 9; superstructure up 4 to 9; substructure up 4 to 9 | Poor | Good | 1,500 |
| SR1147 over South Beaver Creek | load posting removed; poor to good; deck up 5 to 9; superstructure up 4 to 9; substructure up 4 to 9 | Poor | Good | 450 |
| SR1523 over Silas Creek | poor to fair; substructure up 3 to 6 | Poor | Fair | 300 |
| SR1302 over Brush Fork Creek | load posting removed; poor to good; deck up 6 to 8; superstructure up 4 to 8; substructure up 6 to 7 | Poor | Good | 250 |
| SR1110 over Mill Creek | fair to good; culvert up 6 to 8 | Fair | Good | 200 |
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 8 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Blue Ridge Parkway over Laurel Fork | closed | 1939 | 2,300 | June 2021 | Poor |
| NC88 194 over Buffalo Creek | posted for load | 1949 | 6,800 | May 2024 | Poor |
| NC88 over Buffalo Creek | posted for load | 1949 | 6,500 | May 2024 | Poor |
| SR1514 over North Fork New River | posted for load | 1962 | 1,300 | May 2024 | Poor |
| SR1100 over Gap Creek | posted for load | 1967 | 1,000 | June 2023 | Poor |
| SR1628 over Roan Creek | posted for load | 1964 | 760 | November 2023 | Poor |
| SR1120 over North Fork New River | posted for load | 1966 | 560 | June 2024 | Poor |
| SR1105 over South Fork New River | posted for load | 1964 | 540 | August 2023 | Fair |
| SR1362 over Big Horse Creek | posted for load | 1962 | 530 | May 2024 | Fair |
| SR1100 over Ut to Three Top Creek | posted for load | 1955 | 430 | July 2024 | Fair |
| SR1125 over Ben Bolen Creek | posted for load | 1968 | 400 | June 2024 | Poor |
| SR1159 over South Fork New River | posted for load | 2016 | 360 | May 2024 | Good |
| SR1118 over North Fork New River | posted for load | 1968 | 350 | July 2024 | Poor |
| SR1138 over Old Field Creek | posted for load | 1974 | 350 | July 2024 | Fair |
| SR1308 over Cabbage Creek | posted for load | 1975 | 350 | June 2024 | Poor |
| SR1310 over Big Laurel Creek | posted for load | 1968 | 300 | June 2024 | Poor |
| SR1523 over Silas Creek | posted for load | 1966 | 300 | April 2024 | Fair |
| SR1625 over Roan Creek | posted for load | 1958 | 270 | December 2023 | Poor |
| SR1324 over Little Horse Creek | posted for load | 1962 | 250 | June 2024 | Poor |
| SR1573 over Grassy Creek | posted for load | 1964 | 200 | April 2024 | Poor |
| SR1592 over Dog Creek | posted for load | 1975 | 200 | April 2024 | Fair |
| SR1592 over Dog Creek | posted for load | 1975 | 200 | April 2024 | Poor |
| SR1176 over Ut to South Fork New Rvr | posted for load | 1967 | 180 | October 2023 | Fair |
| SR1362 over Big Horse Creek | posted for load | 1962 | 180 | May 2024 | Poor |
| SR1169 over W. Fork Pine Swamp Creek | posted for load | 1961 | 170 | November 2023 | Poor |
| SR1119 over North Fork New River | posted for load | 1972 | 160 | June 2024 | Poor |
| SR1126 over North Fork New River | posted for load | 1962 | 150 | February 2024 | Fair |
| SR1351 over North Fork New River | posted for load | 2018 | 150 | July 2024 | Fair |
| SR1599 over Peak Creek | posted for load | 1972 | 150 | December 2023 | Poor |
| SR1599 over Peak Creek | posted for load | 2007 | 150 | December 2023 | Poor |
| SR1599 over Peak Creek | posted for load | 1972 | 150 | December 2023 | Poor |
| SR1603 over Cranberry Creek | posted for load | 1961 | 130 | December 2023 | Poor |
| SR1322 over Big Laurel Creek | posted for load | 2005 | 110 | June 2024 | Fair |
| SR1547 over Grassy Creek | posted for load | 1965 | 100 | April 2024 | Fair |
| SR1553 over Ut to N. Fork New River | posted for load | 1967 | 100 | April 2024 | Fair |
| SR1600 over Cranberry Creek | posted for load | 1973 | 100 | August 2023 | Poor |
| SR1527 over Helton Creek | posted for load | 1967 | 90 | May 2024 | Fair |
| Deep Gap Estates D over Gap Creek | posted for load | 1950 | 75 | June 2023 | Fair |
| SR1322 over Big Laurel Creek | posted for load | 1956 | 70 | June 2024 | Poor |
| SR1525 over Helton Creek | posted for load | 1966 | 70 | April 2023 | Fair |
| SR1549 over North Fork New River | posted for load | 1961 | 70 | April 2024 | Poor |
| SR1326 over Big Laurel Creek | posted for load | 1967 | 60 | June 2024 | Poor |
| SR1608 over Piney Branch | posted for load | 1964 | 60 | December 2023 | Poor |
| SR1313 over Big Laurel Creek | posted for load | 1968 | 50 | June 2024 | Fair |
| SR1544 over Silas Creek | posted for load | 1966 | 50 | April 2024 | Fair |
| SR1193 over Buffalo Creek | posted for load | 1961 | 40 | June 2024 | Poor |
| SR1318 over Rich Hill Creek | posted for load | 1967 | 40 | June 2024 | Fair |
| SR1613 over Cranberry Creek | posted for load | 1966 | 40 | July 2023 | Fair |
| SR1104 over S.fork New River | posted for load | 1962 | 30 | August 2023 | Poor |
| SR1108 over Mill Creek | posted for load | 1965 | 30 | October 2023 | Fair |
| SR1361 over Ripshin Branch | posted for load | 1961 | 30 | May 2024 | Poor |
| SR1361 over Ripshin Branch | posted for load | 1963 | 30 | June 2024 | Poor |
| SR1361 over Ripshin Branch | posted for load | 1962 | 30 | June 2024 | Poor |
| SR1606 over Cranberry Creek | posted for load | 1964 | 30 | July 2023 | Fair |
| SR1379 over Little Helton Creek | posted for load | 1963 | 20 | May 2024 | Poor |
| SR1117 over Elk Creek | posted for load | 1962 | 10 | June 2024 | Fair |
| SR1192 over Obids Creek | posted for load | 1962 | 10 | November 2023 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the North Carolina department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 4 on 12 months or less, 210 on 24 months, 28 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Ashe County is dated December 2024; 141 bridges have an inspection dated in 2024.
Scour critical (item 113): 1 bridge; 94 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| SR1324 over Little Horse Creek | posted for load | 1962 | 250 | June 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US221 over Naked Creek | 1981 | 13,500 | Good |
| US221 over Beaver Creek | 1981 | 13,000 | Good |
| US221 NC88 over Naked Creek | 1960 | 12,500 | Fair |
| US221 over Old Fields Creek | 2019 | 9,500 | Good |
| US221 over Tributary to Gap Creek | 2022 | 9,300 | Good |
| NC16 88 over Naked Creek | 1999 | 8,100 | Good |
| NC88 over Naked Creek | 1922 | 6,800 | Fair |
| NC88 194 over Buffalo Creek | 1949 | 6,800 | Poor |
| NC88 194 over Buffalo Creek | 2006 | 6,800 | Good |
| NC88 over Buffalo Creek | 1949 | 6,500 | Poor |
Frequently asked questions
Are any bridges closed in Ashe County, North Carolina?
1 bridge of the 242 in Ashe County is coded closed to all traffic in the 2025 National Bridge Inventory, and 56 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the North Carolina department of transportation.
Have any bridges failed in Ashe County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Ashe County: no bridges with a component rated 2 (critical) or lower, 53 bridges rated poor overall, and 3 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Ashe County last inspected?
Inspection dates in the 2025 inventory for Ashe County run from March 2021 to December 2024. Intervals: 4 on 12 months or less, 210 on 24 months, 28 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Ashe County → - all 242, busiest first, each with its own condition record.
All of North Carolina: North Carolina bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.