Bridge conditions in Colfax County, Nebraska
253 inventoried bridges · 3 closed · 35 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 253 bridges.
Colfax County tracks close to typical: 6 of its 253 inventoried bridges (2.4%) are rated poor, against a national rate of about 7%.
- 6 of the 253 bridges in Colfax County, Nebraska, are rated in poor condition (2.4%) in the 2025 National Bridge Inventory, as of .
- Colfax County has 3 bridges closed to all traffic and 35 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 2 bridges dropped into poor condition and no bridges improved out of it; 26 bridges had at least one major component rating lowered.
- 1 bridge has a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from January 2001 to September 2024; 11 bridges over water are coded scour critical.
- 165 bridges (65.2%) are rated good and 82 (32.4%) fair.
- The median Colfax County bridge was built in 2000.
- The busiest poor-rated bridge is County Highway over M Fk Maple Creek (built 1968), carrying about 200 vehicles a day.
What this page is: the federal bridge inspection inventory for Colfax County: inspector ratings, closures and load postings as reported by the Nebraska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 65.2% · Fair 32.4% · Poor 2.4% of 253 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| County Highway over M Fk Maple Creek | fair to poor; substructure 6 to 4 | Fair | Poor | 200 |
| County Highway over Dry Creek | fair to poor; deck 5 to 4; substructure 6 to 5 | Fair | Poor | 45 |
| County Highway over Stream | good to fair; deck 7 to 5; substructure 8 to 7 | Good | Fair | 65 |
| County Highway over M Fk Maple Creek | superstructure 8 to 5 | Fair | Fair | 40 |
| County Highway over Stream | deck 7 to 5; substructure 6 to 5 | Fair | Fair | 50 |
| Coll 7778 over Dry Creek | superstructure 7 to 5 | Fair | Fair | 40 |
| County Highway over Stream | substructure 7 to 5 | Fair | Fair | 40 |
| Road 16 over Maple Creek W Fk | deck 6 to 5 | Fair | Fair | 65 |
| Fas 3145 over Stream | substructure 6 to 5 | Fair | Fair | 40 |
| County Highway over S Fk Dry Creek | deck 6 to 5 | Fair | Fair | 20 |
| Fas 3040 over Stream | superstructure 7 to 6 | Fair | Fair | 75 |
| Beech Street over Stream | fair to good; superstructure 8 to 7; substructure 8 to 7; deck up 5 to 7 | Fair | Good | 500 |
| County Highway over Lost Creek | substructure 8 to 7 | Good | Good | 165 |
| County Highway over E Fk Maple Creek | substructure 8 to 7 | Fair | Fair | 100 |
| Fas 3040 over M Fk Maple Creek | fair to good; superstructure 8 to 7; deck up 5 to 7 | Fair | Good | 85 |
| County Highway over Shell Creek | superstructure 9 to 8; substructure 8 to 7 | Good | Good | 50 |
| Fas 3145 over Stream | substructure 8 to 7 | Fair | Fair | 40 |
| County Highway over M Fk Maple Creek | substructure 8 to 7 | Fair | Fair | 40 |
| County Highway over Stream | substructure 8 to 7 | Fair | Fair | 35 |
| Fas 3040 over E Fk Maple Creek | superstructure 8 to 7 | Good | Good | 30 |
| County Highway S over M Fk Maple Creek | substructure 8 to 7 | Fair | Fair | 20 |
| Road 14 over Dry Creek | substructure 9 to 8 | Good | Good | 65 |
| County Highway over Stream | culvert 9 to 8 | Good | Good | 55 |
| Road 10 over Maple Creek W Fk Trib | culvert 9 to 8 | Good | Good | 50 |
| County Highway over Stream | superstructure 9 to 8; substructure 9 to 8 | Fair | Fair | 45 |
| Coll 7778 over Stream | superstructure 9 to 8; substructure 9 to 8 | Fair | Fair | 40 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| County Highway 10 over Shell Creek | fair to good; deck up 6 to 9; superstructure up 5 to 9; substructure up 5 to 9 | Fair | Good | 60 |
| County Highway over Dry Creek | load posting removed; fair to good | Fair | Good | 40 |
| County Road over Shell Creek | reopened; fair to good; deck up 6 to 9; superstructure up 5 to 9; substructure up 5 to 8 | Fair | Good | 40 |
| County Highway over West Maple Fork Creek | load posting removed; fair to good | Fair | Good | 25 |
3 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| County Highway O over E Fk Maple Creek | closed | 1910 | 45 | July 2024 | Poor |
| County Road K over M Fk Maple Creek | closed | 1935 | 40 | November 2023 | Poor |
| County Highway over M Fk Maple Creek | closed | 1970 | 20 | November 2023 | Fair |
| Fas 3135 over Stream | posted for load | 1979 | 265 | July 2024 | Fair |
| County Highway over M Fk Maple Creek | posted for load | 1968 | 200 | September 2024 | Poor |
| Fas 2780 over Stream | posted for load | 1982 | 100 | July 2024 | Fair |
| Coll 7781 over M Fk Maple Creek | posted for load | 1982 | 75 | November 2023 | Fair |
| County Highway over M Fk Maple Creek | posted for load | 1972 | 75 | September 2024 | Fair |
| County Highway over Stream | posted for load | 1977 | 65 | September 2024 | Fair |
| County Highway 10 over Shell Creek | posted for load | 1935 | 60 | January 2001 | Good |
| County Highway over W Fk Maple Creek | posted for load | 1988 | 60 | September 2024 | Fair |
| County Highway L over M Fk Maple Creek | posted for load | 1935 | 55 | January 2024 | Fair |
| Fas 3155 over Stream | posted for load | 1981 | 55 | July 2024 | Fair |
| County Highway over Stream | posted for load | 1935 | 50 | July 2024 | Fair |
| County Highway J over Pond Creek | posted for load | 1935 | 45 | August 2023 | Fair |
| County Highway U over E Fk Maple Creek | posted for load | 1935 | 45 | August 2023 | Fair |
| County Highway over Dry Creek | posted for load | 1935 | 45 | July 2024 | Poor |
| County Road Q over M Fk Maple Creek | posted for load | 1935 | 45 | August 2023 | Poor |
| County Highway over E Fk Maple Creek | posted for load | 1935 | 40 | August 2023 | Fair |
| County Highway over Stream | posted for load | 1972 | 40 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 40 | September 2024 | Fair |
| County Highway over Lost Creek | posted for load | 1970 | 35 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1974 | 35 | November 2023 | Fair |
| County Highway 12 over Dry Creek | posted for load | 1935 | 30 | August 2023 | Fair |
| County Highway 12 over M Fk Maple Creek | posted for load | 1935 | 30 | August 2023 | Fair |
| County Highway over Stream | posted for load | 1970 | 30 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 30 | November 2023 | Fair |
| County Highway 13 over M Fk Maple Creek | posted for load | 1935 | 25 | January 2024 | Fair |
| County Highway over E Fk Maple Creek | posted for load | 1972 | 25 | November 2023 | Good |
| County Highway over Shell Creek Drainage | posted for load | 1970 | 25 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1980 | 25 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 25 | July 2024 | Fair |
| County Highway over Barnum Ditch | posted for load | 1987 | 20 | September 2024 | Fair |
| County Highway over Pond Creek | posted for load | 1970 | 20 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 20 | November 2023 | Fair |
| Road O over Dry Creek | posted for load | 1935 | 20 | July 2024 | Fair |
| Road O over Dry Creek | posted for load | 1935 | 15 | July 2024 | Fair |
| County Highway Y over Stream | posted for load | 1935 | 10 | August 2023 | Fair |
| Road I over Pond Creek | open on a temporary structure | 2020 | 10 | September 2024 | Good |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Nebraska department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 153 on 24 months, 100 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Colfax County is dated September 2024; 78 bridges have an inspection dated in 2024.
Scour critical (item 113): 11 bridges; 1 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 9 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| County Highway over Stream | posted for load | 1935 | 50 | July 2024 | Fair |
| County Highway J over Pond Creek | posted for load | 1935 | 45 | August 2023 | Fair |
| County Highway O over E Fk Maple Creek | closed | 1910 | 45 | July 2024 | Poor |
| County Highway over Dry Creek | posted for load | 1935 | 45 | July 2024 | Poor |
| County Road Q over M Fk Maple Creek | posted for load | 1935 | 45 | August 2023 | Poor |
| County Road K over M Fk Maple Creek | closed | 1935 | 40 | November 2023 | Poor |
| Fas 3145 over Stream | open | 1974 | 35 | July 2024 | Fair |
| County Highway 12 over Dry Creek | posted for load | 1935 | 30 | August 2023 | Fair |
| County Highway 12 over M Fk Maple Creek | posted for load | 1935 | 30 | August 2023 | Fair |
| County Highway over Dry Creek | open | 1970 | 20 | November 2023 | Fair |
| Road O over Dry Creek | posted for load | 1935 | 20 | July 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| County Highway O over E Fk Maple Creek | closed | 1910 | 45 | July 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| County Highway over M Fk Maple Creek | 1968 | 200 | Poor |
| County Highway over Dry Creek | 1935 | 45 | Poor |
| County Road Q over M Fk Maple Creek | 1935 | 45 | Poor |
| County Highway O over E Fk Maple Creek | 1910 | 45 | Poor |
| County Road K over M Fk Maple Creek | 1935 | 40 | Poor |
| County Highway over Stream | 1935 | 20 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| N15 over 12th-14th/uprr 816-706-e | 1980 | 7,740 | Good |
| US30 over Neiman Ditch | 2002 | 7,480 | Good |
| US30 over Shell Creek | 2002 | 7,480 | Good |
| US30 over Hughes Payzant Ditch | 2018 | 7,480 | Good |
| N15 over Shell Creek | 1957 | 4,200 | Good |
| N15 over US30 | 2002 | 3,845 | Good |
| N15 over Lost Creek | 1985 | 3,360 | Fair |
| N15 over Dry Creek | 1957 | 2,460 | Good |
| N15 over Stream | 1992 | 2,460 | Good |
| N15 over Dry Creek | 1957 | 2,460 | Fair |
Frequently asked questions
Are any bridges closed in Colfax County, Nebraska?
3 bridges of the 253 in Colfax County are coded closed to all traffic in the 2025 National Bridge Inventory, and 35 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Nebraska department of transportation.
Have any bridges failed in Colfax County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Colfax County: 1 bridge with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Colfax County last inspected?
Inspection dates in the 2025 inventory for Colfax County run from January 2001 to September 2024. Intervals: 153 on 24 months, 100 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Colfax County → - all 253, busiest first, each with its own condition record.
All of Nebraska: Nebraska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.