Bridge conditions in Madison County, Nebraska
302 inventoried bridges · 3 closed · 71 posted · 26 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 302 bridges.
26 of the 302 bridges the federal inventory lists in Madison County are rated poor; the rest split 109 good and 167 fair.
- 26 of the 302 bridges in Madison County, Nebraska, are rated in poor condition (8.6%) in the 2025 National Bridge Inventory, as of .
- Madison County has 3 bridges closed to all traffic and 71 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 11 bridges had at least one major component rating lowered.
- Inspection dates on record run from May 2021 to February 2025; 10 bridges over water are coded scour critical.
- 109 bridges (36.1%) are rated good and 167 (55.3%) fair.
- The median Madison County bridge was built in 1983.
- The busiest poor-rated bridge is Norflk AVE/FAU6020 over N Fk Elkhorn River (built 1968), carrying about 8,130 vehicles a day.
What this page is: the federal bridge inspection inventory for Madison County: inspector ratings, closures and load postings as reported by the Nebraska DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 36.1% · Fair 55.3% · Poor 8.6% of 302 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| County Highway over Stream | fair to poor; deck 6 to 5; substructure 5 to 4 | Fair | Poor | 30 |
| County Highway over Sand Creek | good to fair; deck 7 to 5; substructure 8 to 7 | Good | Fair | 15 |
| County Highway over Waterway | deck 6 to 5; superstructure 5 to 4 | Poor | Poor | 25 |
| County Highway over Stream | deck 6 to 5 | Fair | Fair | 20 |
| N 1ST / Fau 6009 over N Fk Elkhorn River | deck 8 to 7 | Good | Good | 1,685 |
| County Highway over Stream | substructure 8 to 7 | Fair | Fair | 45 |
| 835TH Rd over Deer Creek Trib | culvert 9 to 8 | Good | Good | 55 |
| 543RD Ave over South Fork Union CR Trib | culvert 9 to 8 | Good | Good | 30 |
| 536TH Ave over Battle Creek Trib | culvert 9 to 8 | Good | Good | 25 |
| 557TH Ave over Meridian Creek Trib | culvert 9 to 8 | Good | Good | 20 |
| County Highway over Stream | culvert 9 to 8 | Good | Good | 15 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Victory Rd over Spring Branch | load posting removed; superstructure up 7 to 8; substructure up 7 to 8 | Good | Good | 300 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| County Highway over N Fk Elkhorn River | closed | 1906 | 100 | June 2024 | Poor |
| County Highway over Stream | closed | 1960 | 55 | October 2024 | Poor |
| County Highway over Stream | closed | 1957 | 40 | October 2024 | Poor |
| Koenigstein Avenue over Corporation Gulch | posted for load | 1950 | 400 | February 2025 | Fair |
| 839TH Rd over Battle Creek | posted for load | 1970 | 395 | August 2023 | Fair |
| 839TH Rd over Battle Creek Trib | posted for load | 1965 | 395 | August 2023 | Fair |
| Jackson Street over Union Creek | posted for load | 1970 | 385 | December 2023 | Fair |
| Fas 2798 over Drainage Way | posted for load | 1935 | 350 | November 2023 | Fair |
| Fas 2798 over Stream | posted for load | 1935 | 350 | November 2023 | Good |
| South Airport Rd over Elkhorn River Trib | posted for load | 1993 | 270 | December 2023 | Good |
| County Highway over Drainage Way | posted for load | 1972 | 250 | December 2023 | Fair |
| Fas 2810 over Stream | posted for load | 1954 | 175 | December 2023 | Fair |
| Fas 2845 over Stream | posted for load | 1999 | 160 | November 2023 | Fair |
| 549TH Ave over Elkhorn River Trib | posted for load | 2001 | 150 | December 2023 | Good |
| 839TH Rd over Buffalo Creek | posted for load | 1976 | 115 | August 2023 | Fair |
| N 6TH St over Taylor Creek | posted for load | 1976 | 100 | December 2023 | Fair |
| Nucor Rd over Hadar Creek Trib | posted for load | 1935 | 80 | December 2023 | Fair |
| Coll 7635 over Stream | posted for load | 1935 | 75 | October 2024 | Fair |
| Coll 7697 over Stream | posted for load | 1935 | 75 | December 2023 | Poor |
| 546TH Ave over Union Creek N Fk Trib | posted for load | 1950 | 70 | December 2023 | Fair |
| Coll 7644 over Battle Creek | posted for load | 1972 | 70 | August 2023 | Fair |
| County Highway over Union Creek | posted for load | 1996 | 70 | December 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 65 | December 2023 | Fair |
| 538TH St over Shell Creek Trib | posted for load | 1957 | 60 | August 2023 | Poor |
| 542ND Ave over Union Creek N Fk Trib | posted for load | 1950 | 60 | October 2024 | Poor |
| 545TH Rd over Union Creek N Fk Trib | posted for load | 1955 | 60 | December 2023 | Poor |
| 549TH St over Union Creek N Fk Trib | posted for load | 1970 | 60 | December 2023 | Fair |
| 824TH Rd over Shell Creek Trib | posted for load | 1979 | 60 | August 2023 | Fair |
| 827TH Rd over Union Creek N Fk | posted for load | 1957 | 60 | August 2023 | Fair |
| 841ST Rd over Dry Creek | posted for load | 1970 | 60 | August 2023 | Good |
| County Highway over Battle Creek | posted for load | 1975 | 60 | August 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 60 | October 2024 | Fair |
| County Highway over Taylor Creek | posted for load | 1981 | 60 | December 2023 | Poor |
| 543RD Ave over Union Creek N Fk | posted for load | 1960 | 55 | August 2023 | Fair |
| County Highway over Stream | posted for load | 2004 | 55 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 55 | December 2023 | Fair |
| 543RD Ave over Battle Creek Trib | posted for load | 1960 | 50 | August 2023 | Fair |
| 837TH Rd over Giles Creek Trib | posted for load | 2002 | 50 | August 2023 | Fair |
| Coll 7697 over Drainage Ditch | posted for load | 1965 | 50 | October 2024 | Poor |
| County Highway over Stream | posted for load | 1935 | 50 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1982 | 50 | August 2023 | Fair |
| County Highway over Stream | posted for load | 1954 | 50 | December 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 50 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1960 | 50 | October 2024 | Poor |
| Eisenhower Ave over Spring Branch | posted for load | 1976 | 50 | December 2023 | Fair |
| County Highway over Stream | posted for load | 1935 | 45 | December 2023 | Fair |
| County Highway over Union Creek | posted for load | 1972 | 45 | November 2023 | Good |
| 537TH Ave over Battle Creek | posted for load | 1970 | 40 | August 2023 | Fair |
| 537TH Ave over Battle Creek Trib | posted for load | 1979 | 40 | August 2023 | Fair |
| 545TH Ave over Elkhorn River Trib | posted for load | 1970 | 40 | August 2023 | Fair |
| 837TH Rd over Buffalo Creek | posted for load | 1935 | 40 | August 2023 | Poor |
| 840TH Rd over Buffalo Creek | posted for load | 1975 | 40 | August 2023 | Fair |
| County Highway over Drainage Ditch | posted for load | 1965 | 40 | October 2024 | Fair |
| County Highway over N Fk Elkhorn River | posted for load | 1935 | 40 | June 2024 | Fair |
| County Highway over Stream | posted for load | 1957 | 40 | August 2023 | Poor |
| County Highway over Taylor Creek | posted for load | 1935 | 40 | December 2023 | Poor |
| 838TH Rd over Buffalo Creek | posted for load | 1975 | 35 | August 2023 | Fair |
| 838TH Rd over Deer Creek | posted for load | 1983 | 35 | August 2023 | Fair |
| Coll 7698 over Stream | posted for load | 1965 | 35 | December 2023 | Fair |
| Fas 2810 over Battle Creek | posted for load | 1962 | 35 | October 2024 | Fair |
| County Highway over Stream | posted for load | 1957 | 30 | October 2024 | Poor |
| County Highway over Stream | posted for load | 1995 | 30 | August 2023 | Fair |
| County Highway over Stream | posted for load | 1960 | 30 | October 2024 | Poor |
| County Highway over Stream | posted for load | 1935 | 30 | October 2024 | Poor |
| County Highway over Stream | posted for load | 1935 | 30 | December 2023 | Fair |
| 536T Ave over Battle Creek | posted for load | 1972 | 25 | August 2023 | Fair |
| 536TH Ave over Buffalo Creek | posted for load | 1957 | 25 | August 2023 | Fair |
| County Highway over Drainage Way | posted for load | 1957 | 25 | October 2024 | Fair |
| County Highway over Waterway | posted for load | 1950 | 25 | October 2024 | Poor |
| County Highway over Battle Creek | posted for load | 1935 | 20 | August 2023 | Fair |
| County Highway over Battle Creek | posted for load | 1935 | 20 | June 2024 | Poor |
| County Highway over Stream | posted for load | 1974 | 20 | October 2024 | Fair |
| County Highway over Union Creek | posted for load | 1915 | 20 | June 2024 | Fair |
| County Highway over Stream | posted for load | 1935 | 10 | June 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Nebraska department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 249 on 24 months, 53 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Madison County is dated February 2025; 8 bridges have an inspection dated in 2025.
Scour critical (item 113): 10 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 5 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| 840TH Rd over Battle Creek | open | 1978 | 250 | August 2023 | Fair |
| Fas 2917 over Elkhorn River | open | 1986 | 150 | December 2023 | Fair |
| 839TH Rd over Dry Creek Trib | open | 1968 | 145 | August 2023 | Fair |
| County Highway over N Fk Elkhorn River | closed | 1906 | 100 | June 2024 | Poor |
| County Highway over Battle Creek | open | 1935 | 60 | August 2023 | Poor |
| County Highway over Stream | posted for load | 1935 | 50 | November 2023 | Fair |
| County Highway over Stream | posted for load | 1960 | 50 | October 2024 | Poor |
| 837TH Rd over Buffalo Creek | posted for load | 1935 | 40 | August 2023 | Poor |
| County Highway over Stream | closed | 1957 | 40 | October 2024 | Poor |
| County Highway over Stream | posted for load | 1974 | 20 | October 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US81 over Corporation Gulch | 1929 | 16,150 | Good |
| US275 over Corporation Gulch | 1957 | 15,985 | Good |
| US81 over UPRR 188-063-b | 1988 | 15,715 | Fair |
| BENJAMIN/FAU6018 over Stream | 1970 | 15,250 | Good |
| Bnjmin AVE/FAU6018 over N Fk Elkhorn River | 1967 | 13,625 | Good |
| US81 over Elkhorn River | 1974 | 13,460 | Fair |
| US275 over N Fk Elkhorn River | 1955 | 11,135 | Fair |
| Norflk AVE/FAU6020 over Corporation Gulch | 1982 | 10,615 | Fair |
| Norfolk Ave over Elkhorn River N Fk Trib | 2017 | 10,325 | Good |
| N 1ST St/fau 6009 over Stream | 2023 | 9,930 | Good |
Frequently asked questions
Are any bridges closed in Madison County, Nebraska?
3 bridges of the 302 in Madison County are coded closed to all traffic in the 2025 National Bridge Inventory, and 71 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Nebraska department of transportation.
Have any bridges failed in Madison County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Madison County: no bridges with a component rated 2 (critical) or lower, 26 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Madison County last inspected?
Inspection dates in the 2025 inventory for Madison County run from May 2021 to February 2025. Intervals: 249 on 24 months, 53 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Madison County → - all 302, busiest first, each with its own condition record.
All of Nebraska: Nebraska bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.