Bridge conditions in Hillsborough County, New Hampshire
385 inventoried bridges · 1 closed · 14 posted · 31 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 385 bridges.
Hillsborough County tracks close to typical: 31 of its 385 inventoried bridges (8.1%) are rated poor, against a national rate of about 7%.
- 31 of the 385 bridges in Hillsborough County, New Hampshire, are rated in poor condition (8.1%) in the 2025 National Bridge Inventory, as of .
- Hillsborough County has 1 bridge closed to all traffic and 14 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 2 more bridges are open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 1 bridge dropped into poor condition and 2 bridges improved out of it; 7 bridges had at least one major component rating lowered, 1 was newly closed.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from April 2023 to November 2024; 12 bridges over water are coded scour critical.
- 201 bridges (52.2%) are rated good and 153 (39.7%) fair.
- The median Hillsborough County bridge was built in 1973.
- The busiest poor-rated bridge is I-293 Fee Tpk over Stark Way (built 1956), carrying about 46,106 vehicles a day.
What this page is: the federal bridge inspection inventory for Hillsborough County: inspector ratings, closures and load postings as reported by the New Hampshire DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 52.2% · Fair 39.7% · Poor 8.1% of 385 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Greenfield Parkway over Riddle Brook | newly closed; fair to poor; culvert 5 to 0 | Fair | Poor | 571 |
| Windy Row Road over Mcdowell Reservoir | deck 5 to 4 | Poor | Poor | 247 |
| US 3 Elm St over Csx(abd) | substructure 6 to 5 | Fair | Fair | 11,812 |
| Shedd Road over Shedd Brook | substructure 6 to 5 | Fair | Fair | 96 |
| Robinson Road over Moose Brook | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 21 |
| Fee Tpk over Souhegan River | deck 8 to 7; superstructure 8 to 7 | Good | Good | 75,081 |
| Magazine Street over Riddle Brook | culvert 8 to 7 | Good | Good | 571 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US 3 Nh 3A over I-293 Nh 3A CSX Merr R | poor to fair; deck up 4 to 7; substructure up 5 to 7 | Poor | Fair | 22,640 |
| US 3 over Souhegan River | poor to fair; superstructure up 4 to 6 | Poor | Fair | 13,075 |
| E Washington Road over Brook | load posting removed; fair to good; deck up 5 to 9; superstructure up 5 to 9; substructure up 7 to 9 | Fair | Good | 218 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Greenfield Parkway over Riddle Brook | closed | 2000 | 571 | July 2024 | Poor |
| Old Bridge Street over Beaver Brook | posted for load | 1920 | 6,622 | September 2024 | Fair |
| Forest Road over Contoocook River | posted for load | 1937 | 2,818 | October 2024 | Fair |
| River Road over Piscataquog River | posted for load | 1940 | 1,866 | October 2024 | Poor |
| Temple Road over Blood Brook | posted for load | 1901 | 1,167 | November 2024 | Poor |
| Windy Row Road over Mcdowell Reservoir | posted for load | 1950 | 247 | October 2024 | Poor |
| North Road over Brook | posted for load | 1940 | 153 | June 2024 | Fair |
| Beard Road over Beards Brook | posted for load | 1900 | 96 | October 2024 | Fair |
| Cressy Hill Road over Rand Brook | posted for load | 1940 | 96 | October 2024 | Poor |
| Gleason Falls Road over Beards Brook | posted for load | 1900 | 96 | October 2024 | Poor |
| Jones Road over Beards Brook | posted for load | 1900 | 96 | October 2024 | Poor |
| Putnam Road over Brook | posted for load | 1930 | 96 | November 2024 | Poor |
| Clarkville Road over S Br Piscataquog River | posted for load | 1930 | 17 | October 2024 | Fair |
| Access Road over Joe English Brook | posted for load | 2008 | 10 | September 2024 | Fair |
| On-orbit Drive over Gardner-joe English Stre | posted for load | 1959 | 10 | September 2024 | Poor |
| Thorntons Ferry Rd over Beaver Brook | open on a temporary structure | 1970 | 356 | June 2024 | Poor |
| Old County Rd N over Collins Brook | open on a temporary structure | 1981 | 96 | October 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the New Hampshire department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 8 on 12 months or less, 355 on 24 months, 22 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Hillsborough County is dated November 2024; 227 bridges have an inspection dated in 2024.
Scour critical (item 113): 12 bridges; 2 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 9 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| NH111 WB over Merrimack River | open | 1970 | 17,275 | September 2023 | Fair |
| Old Bridge Street over Beaver Brook | posted for load | 1920 | 6,622 | September 2024 | Fair |
| Wilton Road over Souhegan River | open | 1917 | 6,406 | June 2024 | Fair |
| Main Street over Beaver Brook | open | 1900 | 6,111 | November 2024 | Poor |
| US202 over N Branch River | open | 1988 | 5,929 | March 2024 | Good |
| US202 NH123 over Contoocook River | open | 1942 | 5,773 | November 2024 | Poor |
| County Road over Souhegan River | open | 1987 | 3,589 | September 2023 | Good |
| Cohas Avenue over Cohas Brook | open | 1900 | 2,560 | July 2024 | Good |
| Contoocook Falls R over Contoocook River | open | 1933 | 712 | August 2024 | Poor |
| Jones Road over Beards Brook | posted for load | 1900 | 96 | October 2024 | Poor |
| Liberty Farm Road over North Branch River | open | 1991 | 96 | October 2024 | Poor |
| Mill Road over Gridley River | open | 1927 | 95 | July 2024 | Fair |
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Greenfield Parkway over Riddle Brook | closed | 2000 | 571 | July 2024 | Poor |
| Thorntons Ferry Rd over Beaver Brook | open on a temporary structure | 1970 | 356 | June 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Fee Tpk N&S Ramps over Salmon Brook | 1955 | 128,889 | Good |
| Fee Tpk over Greeley Street | 1993 | 78,063 | Good |
| Fee Tpk over Souhegan River | 1953 | 75,081 | Good |
| Fee Tpk over Baboosic Brook | 1954 | 75,081 | Good |
| US 3 Fee Tpk NB over Nashua River | 1955 | 73,979 | Fair |
| US 3 Fee Tpk SB over Nashua River | 1959 | 71,221 | Good |
| I-293 Fee Tpk over N Br Piscataquog River | 2016 | 69,164 | Good |
| Fee Tpk NB Ramp 4 over Ramp 3B | 1997 | 66,228 | Good |
| I-293 Fee Tpk over S Br Piscataquog River | 2016 | 63,919 | Good |
| I-293 Fee Tpk over I-293 NB on Ramp | 2016 | 63,919 | Good |
Frequently asked questions
Are any bridges closed in Hillsborough County, New Hampshire?
1 bridge of the 385 in Hillsborough County is coded closed to all traffic in the 2025 National Bridge Inventory, and 14 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the New Hampshire department of transportation.
Have any bridges failed in Hillsborough County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Hillsborough County: 2 bridges with a component rated 2 (critical) or lower, 31 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Hillsborough County last inspected?
Inspection dates in the 2025 inventory for Hillsborough County run from April 2023 to November 2024. Intervals: 8 on 12 months or less, 355 on 24 months, 22 on other. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Hillsborough County → - all 385, busiest first, each with its own condition record.
All of New Hampshire: New Hampshire bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.