Bridge conditions in Josephine County, Oregon
224 inventoried bridges · 0 closed · 38 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 224 bridges.
Josephine County tracks close to typical: 6 of its 224 inventoried bridges (2.7%) are rated poor, against a national rate of about 7%.
- 6 of the 224 bridges in Josephine County, Oregon, are rated in poor condition (2.7%) in the 2025 National Bridge Inventory, as of .
- Josephine County has no bridges closed to all traffic and 38 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and no bridges improved out of it; 47 bridges had at least one major component rating lowered, 8 newly load-posted.
- Inspection dates on record run from May 2021 to December 2024; 50 bridges over water are coded scour critical.
- 81 bridges (36.2%) are rated good and 137 (61.2%) fair.
- The median Josephine County bridge was built in 1966.
- The busiest poor-rated bridge is Wimer Road over Whiskey Creek (built 1954), carrying about 80 vehicles a day.
What this page is: the federal bridge inspection inventory for Josephine County: inspector ratings, closures and load postings as reported by the Oregon DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 36.2% · Fair 61.2% · Poor 2.7% of 224 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Taylor Minnow Rd over Taylor Creek | fair to poor; superstructure 6 to 4 | Fair | Poor | 50 |
| US 199 (hwy 025) over Dwight Creek | newly posted for load; deck 7 to 6; substructure up 5 to 6 | Fair | Fair | 3,436 |
| US199 (hwy 025) over Sand Creek | newly posted for load | Good | Good | 15,545 |
| US 199 (hwy 025) over Holton Creek | newly posted for load; substructure up 6 to 7 | Fair | Fair | 10,152 |
| US 199 (hwy 025) over Slate Creek | newly posted for load; substructure up 5 to 7 | Fair | Fair | 7,878 |
| US 199 (hwy 025) over Butcher Knife Creek | newly posted for load | Fair | Fair | 7,878 |
| US 199 (hwy 025) over Anderson Creek | newly posted for load; substructure up 6 to 7 | Fair | Fair | 7,664 |
| Lone Mountain Rd over Little Rock Creek | newly posted for load | Fair | Fair | 198 |
| 33 S 08 W 26.00: over West Fork Whiskey Creek | newly posted for load | Fair | Fair | 25 |
| Sand Creek Road over Sand Creek | good to fair; substructure 8 to 6 | Good | Fair | 700 |
| Monument Drive over Louse Creek | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 6,962 |
| College Drive over Irrigation Canal | good to fair; substructure 7 to 6 | Good | Fair | 3,388 |
| Lakeshore Drive over Deer Creek | good to fair; substructure 7 to 6; deck up 7 to 8; superstructure up 7 to 8 | Good | Fair | 1,199 |
| Cedar Flats Rd over Munger Creek | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 966 |
| Winona Road over Cove Creek | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 640 |
| Westside Road over Mendenhall Creek | good to fair; culvert 7 to 6 | Good | Fair | 410 |
| Westside Road over Woodcock Creek | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 398 |
| Davidson Road over West Fork Williams Creek | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 230 |
| Low.grave CR Rd over Rock Creek | good to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 8 | Good | Fair | 146 |
| Or 46 (hwy 038) over Little Grayback Creek | good to fair; deck 7 to 6 | Good | Fair | 137 |
| 38 S 06 W 18.00: over Deer Creek | good to fair; deck 7 to 6 | Good | Fair | 75 |
| 33 S 08 W 26.00: over East Fork Whiskey Creek | good to fair; superstructure 7 to 6 | Good | Fair | 25 |
| 39 S 05 W 19.00: over North Fork Williams Cree | good to fair; superstructure 7 to 6 | Good | Fair | 25 |
| 39 S 05 W 22.00: over Rock Creek | good to fair; superstructure 7 to 6 | Good | Fair | 20 |
| Dog Creek Road over Brimstone Creek | good to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 8 | Good | Fair | 15 |
| US 199 (hwy 025) over Anderson Creek | superstructure 6 to 5; substructure 7 to 6 | Fair | Fair | 8,038 |
| Cloverlawn Drive over South Highline Canal | substructure 6 to 5; deck up 7 to 8; superstructure up 7 to 8 | Fair | Fair | 5,391 |
| Hogue Drive over Deer Creek | substructure 6 to 5; deck up 5 to 6 | Fair | Fair | 393 |
| 38 S 07 W 31.00: over McMULLEN CREEK | substructure 6 to 5 | Fair | Fair | 20 |
| I-5 (hwy 001) over N Wolf CR Conn | superstructure 7 to 6; deck up 7 to 8 | Fair | Fair | 20,703 |
| I-5 (hwy 001) over Coyote Creek | deck 7 to 6; substructure up 5 to 6 | Fair | Fair | 20,182 |
| I-5 (hwy 001) over S Wolf CR Conn | deck 7 to 6 | Fair | Fair | 20,182 |
| US 199 (hwy 025) over Deer Creek | deck 7 to 6; substructure up 6 to 7 | Fair | Fair | 8,066 |
| Frontage Road 1012 over Wolf Creek | substructure 7 to 6 | Fair | Fair | 2,469 |
| Frontage Road 1012 over Wolf Creek | deck 7 to 6 | Fair | Fair | 2,411 |
| Southside Road over Murphy Creek | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 1,683 |
| Fish Hatchery Road over Applegate River | superstructure 7 to 6 | Fair | Fair | 1,315 |
| Or 46 (hwy 038) over Chapman Creek | deck 7 to 6 | Fair | Fair | 1,137 |
| Dick George Road over Althouse Creek | superstructure 7 to 6 | Fair | Fair | 964 |
| Jumpoff Joe Crk Rd over Jacks Creek | deck 7 to 6; superstructure 7 to 6; substructure up 5 to 6 | Fair | Fair | 640 |
Showing the 40 largest of 54 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| I-5 (hwy 001) over Hillcrest Dr | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 31,567 |
| I-5 (hwy 001) over US 199 Or 99 (hwy 025) | fair to good; deck up 6 to 7 | Fair | Good | 31,567 |
| I-5 (hwy 001) over Hwy 482 Spur | fair to good; deck up 6 to 7; superstructure up 6 to 7; substructure up 6 to 7 | Fair | Good | 28,016 |
| Hwy 482 Spur over Rogue River | fair to good; deck up 6 to 7 | Fair | Good | 23,737 |
| I-5 (hwy 001) over Beacon Dr | fair to good; deck up 6 to 8; superstructure up 7 to 8; substructure up 6 to 7 | Fair | Good | 15,783 |
| I-5 (hwy 001) SB over Louse CR Frontage Rd | fair to good; deck up 6 to 7 | Fair | Good | 11,534 |
| US 199 (hwy 025) over Applegate River | fair to good; deck up 6 to 7; superstructure up 6 to 7 | Fair | Good | 10,962 |
| I-5 (hwy 001) NB over Leland Rd | fair to good; deck up 7 to 8; superstructure up 7 to 8; substructure up 6 to 8 | Fair | Good | 10,597 |
| I-5 (hwy 001) SB over Leland Rd | fair to good; deck up 7 to 8; substructure up 6 to 8 | Fair | Good | 10,597 |
| I-5 (hwy 001) SB over SB Grave Creek | fair to good; deck up 6 to 8; superstructure up 7 to 8; substructure up 7 to 8 | Fair | Good | 10,597 |
| I-5 (hwy 001) NB over NB Grave Creek | fair to good; deck up 6 to 8; substructure up 6 to 7 | Fair | Good | 10,597 |
| US 199 (hwy 025) over W Fork Illinois River | fair to good; deck up 7 to 8; substructure up 6 to 7 | Fair | Good | 4,736 |
| Highland Avenue over Louse Creek | fair to good; superstructure up 6 to 7 | Fair | Good | 4,500 |
| Lakeshore Drive over Thompson Creek | fair to good; substructure up 6 to 7 | Fair | Good | 2,469 |
| Powell Creek Road over Williams CR | fair to good; substructure up 6 to 7 | Fair | Good | 1,290 |
The 15 busiest of 18 improvements.
1 structure in the 2025 inventory does not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| US199 (hwy 025) over Sand Creek | posted, other restriction | 1960 | 15,545 | August 2024 | Good |
| US 199 (hwy 025) over Holton Creek | posted, other restriction | 1926 | 10,152 | August 2024 | Fair |
| US 199 (hwy 025) over Butcher Knife Creek | posted, other restriction | 1927 | 7,878 | August 2024 | Fair |
| US 199 (hwy 025) over Slate Creek | posted, other restriction | 1927 | 7,878 | August 2024 | Fair |
| US 199 (hwy 025) over Anderson Creek | posted, other restriction | 1927 | 7,664 | August 2024 | Fair |
| US 199 (hwy 025) over Dwight Creek | posted, other restriction | 1924 | 3,436 | August 2024 | Fair |
| Watergap Road over Powell Creek | posted for load | 1940 | 2,612 | October 2024 | Fair |
| Frontage Road 1012 over Wolf Creek | posted for load | 1969 | 2,411 | October 2024 | Fair |
| Takilma Road over Althouse Creek | posted for load | 1962 | 1,910 | July 2024 | Fair |
| Deer Creek Road over Draper Creek | posted for load | 1960 | 1,799 | October 2024 | Fair |
| Sunny Valley Lp over Grave Creek | posted for load | 1920 | 1,626 | October 2024 | Fair |
| Holland Loop Rd over Sand Creek | posted for load | 1960 | 1,432 | October 2024 | Good |
| Fish Hatchery Road over Cheney Creek | posted for load | 1964 | 1,400 | October 2024 | Fair |
| Hwy 260 over Shan Creek | posted, other restriction | 1988 | 1,316 | July 2023 | Good |
| Hubbard Lane over Sand Creek | posted for load | 1963 | 1,102 | October 2024 | Good |
| Dick George Road over Althouse Creek | posted for load | 1950 | 964 | October 2024 | Fair |
| Takilma Road over Elder Creek | posted for load | 1960 | 796 | October 2024 | Fair |
| Takilma Road over Small Creek | posted for load | 1960 | 796 | October 2024 | Fair |
| Takilma Road over Small Creek | posted for load | 1957 | 796 | October 2024 | Fair |
| Finch Road over Illinois River Overflow | posted for load | 1950 | 585 | October 2024 | Fair |
| Finch Rd In Kerby over Kerby Slough | posted for load | 1951 | 501 | October 2024 | Good |
| Cave Camp Road over West Fork Williams Creek | posted for load | 1973 | 472 | July 2024 | Fair |
| Reeves Creek Road over Reeves Creek | posted, other restriction | 1970 | 468 | October 2024 | Fair |
| Tavis Drive over Harris Creek | posted for load | 1963 | 426 | October 2024 | Fair |
| Westside Road over Mendenhall Creek | posted for load | 1970 | 410 | October 2024 | Fair |
| Waldo Road over Illinois River | posted for load | 1966 | 393 | October 2024 | Fair |
| Low.grave CR Rd over Wolf Creek | posted for load | 1960 | 300 | July 2024 | Fair |
| Finch Rd In Kerby over Illinois River | posted, other restriction | 1926 | 273 | October 2024 | Fair |
| Lone Mountain Rd over Little Rock Creek | posted, other restriction | 1954 | 198 | October 2024 | Fair |
| Lone Mtn Road over Rock Creek | posted for load | 1954 | 108 | October 2024 | Fair |
| Ward Road over Quartz Creek | posted for load | 1960 | 90 | July 2024 | Fair |
| Carrie St over Grave Creek | posted for load | 1948 | 75 | October 2024 | Poor |
| 34 S 08 W 36.00: over Galice Creek | posted for load | 1951 | 50 | June 2024 | Fair |
| Slate Creek Road over Bear Creek | posted for load | 1975 | 31 | October 2024 | Poor |
| Three Mill Road over McMullin Creek | posted for load | 2002 | 30 | July 2024 | Poor |
| 33 S 08 W 26.00: over West Fork Whiskey Creek | posted for load | 1966 | 25 | May 2024 | Fair |
| Bridge Lane over Coyote Creek | posted for load | 1965 | 17 | October 2024 | Good |
| Haines Lane over Louse Creek | posted for load | 1959 | 16 | October 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Oregon department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 6 on 12 months or less, 212 on 24 months, 6 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Josephine County is dated December 2024; 202 bridges have an inspection dated in 2024.
Scour critical (item 113): 50 bridges; 37 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 10 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Wimer Road over Whiskey Creek | 1954 | 80 | Poor |
| Carrie St over Grave Creek | 1948 | 75 | Poor |
| Taylor Minnow Rd over Taylor Creek | 1959 | 50 | Poor |
| Slate Creek Road over Bear Creek | 1975 | 31 | Poor |
| Three Mill Road over McMullin Creek | 2002 | 30 | Poor |
| Lower Wheeler Rd over Wheeler Creek | 1958 | 21 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-5 (hwy 001) over Hillcrest Dr | 1960 | 31,567 | Good |
| I-5 (hwy 001) over Scoville Rd | 1959 | 31,567 | Fair |
| I-5 (hwy 001) over US 199 Or 99 (hwy 025) | 1960 | 31,567 | Good |
| I-5 (hwy 001) over Foothill Blvd | 1960 | 28,016 | Fair |
| I-5 (hwy 001) over Hwy 482 Spur | 2008 | 28,016 | Good |
| Or 238 (hwy 272) over US 199 (hwy 025) NB | 1959 | 26,250 | Fair |
| Hwy 482 Spur over Rogue River | 1990 | 23,737 | Good |
| Hwy 482 Spur over Corp | 1990 | 22,942 | Fair |
| I-5 (hwy 001) over N Wolf CR Conn | 1965 | 20,703 | Fair |
| I-5 (hwy 001) over Coyote Creek | 1965 | 20,182 | Fair |
Frequently asked questions
Are any bridges closed in Josephine County, Oregon?
No bridges of the 224 in Josephine County are coded closed to all traffic in the 2025 National Bridge Inventory, and 38 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Oregon department of transportation.
Have any bridges failed in Josephine County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Josephine County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Josephine County last inspected?
Inspection dates in the 2025 inventory for Josephine County run from May 2021 to December 2024. Intervals: 6 on 12 months or less, 212 on 24 months, 6 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Josephine County → - all 224, busiest first, each with its own condition record.
All of Oregon: Oregon bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.