BridgeReportCard
Home › South Dakota › Sully County

Bridge conditions in Sully County, South Dakota

31 inventoried bridges · 1 closed · 1 posted · 6 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 31 bridges.

Of the 31 Sully County bridges in the federal inventory, 6 carry a poor rating. That 19.4% share is roughly 3x the national average.

What this page is: the federal bridge inspection inventory for Sully County: inspector ratings, closures and load postings as reported by the South Dakota DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 45.2% · Fair 35.5% · Poor 19.4% of 31 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

0
dropped into poor
since 2024
0
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
SD1804 over Okobojo Ckdeck 8 to 6FairFair632
SD1804 over Cow Ckculvert 8 to 7GoodGood632

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
195 Street over Medicine Knoll Ckclosed191310August 2005Poor
302 Avenue over Okobojo Ckposted for load196220July 2023Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the South Dakota department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 1 on 12 months or less, 22 on 24 months, 8 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Sully County is dated July 2024; 2 bridges have an inspection dated in 2024.

Scour critical (item 113): 2 bridges; 14 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 1 bridge. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
SD1804 over Okobojo Ckopen1972632July 2024Fair
291 Avenue over Okobojo Ckopen1936250July 2023Fair

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
188 Street over Ck196475Poor
315 Avenue over Medicine Ck195664Poor
320 Avenue over Ck196125Poor
301 Avenue over Okobojo Creek196120Poor
302 Avenue over Okobojo Ck196220Poor
195 Street over Medicine Knoll Ck191310Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
US083 over Okobojo Ck19981,490Good
185 St over Ck2017760Good
SD1804 over Cow Ck2007632Good
SD1804 over Okobojo Ck1972632Fair
SD1804 over Ck1995261Good
291 Avenue over Okobojo Ck1936250Fair
176 Street over Okobojo Ck2023230Good
196 St over Cow Ck2006180Good
185 Street over Medicine Ck2021150Good
185 Street over Medicine Knoll Ck1930150Fair

Frequently asked questions

Are any bridges closed in Sully County, South Dakota?

1 bridge of the 31 in Sully County is coded closed to all traffic in the 2025 National Bridge Inventory, and 1 bridge is posted with load restrictions. The inventory is compiled annually; for closures since then, check the South Dakota department of transportation.

Have any bridges failed in Sully County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Sully County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Sully County last inspected?

Inspection dates in the 2025 inventory for Sully County run from August 2005 to July 2024. Intervals: 1 on 12 months or less, 22 on 24 months, 8 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Sully County → - all 31, busiest first, each with its own condition record.

All of South Dakota: South Dakota bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.