Bridge conditions in Kaufman County, Texas
451 inventoried bridges · 1 closed · 6 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 451 bridges.
The federal inventory lists 451 bridges in Kaufman County: 204 rated good, 243 fair, and 4 poor.
- 4 of the 451 bridges in Kaufman County, Texas, are rated in poor condition (0.9%) in the 2025 National Bridge Inventory, as of .
- Kaufman County has 1 bridge closed to all traffic and 6 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 2 bridges dropped into poor condition and 1 bridge improved out of it; 61 bridges had at least one major component rating lowered, 1 was newly closed, 1 newly load-posted.
- Inspection dates on record run from April 2022 to November 2024; 4 bridges over water are coded scour critical.
- 204 bridges (45.2%) are rated good and 243 (53.9%) fair.
- The median Kaufman County bridge was built in 1975.
- The busiest poor-rated bridge is US 80 WB over East Fork Trinity River (built 1930), carrying about 33,856 vehicles a day.
What this page is: the federal bridge inspection inventory for Kaufman County: inspector ratings, closures and load postings as reported by the Texas DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 45.2% · Fair 53.9% · Poor 0.9% of 451 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US 175 EB over Buffalo Creek | newly closed | Good | Good | 15,521 |
| US 80 WB over East Fork Trinity River | fair to poor; substructure 5 to 4 | Fair | Poor | 33,856 |
| US 80 WB over Buffalo Creek Relief | fair to poor; substructure 5 to 4 | Fair | Poor | 33,856 |
| US 175 Nfr over Big Brushy Creek Relief | newly posted for load | Good | Good | 251 |
| US 80 over FM 548 | good to fair; deck 7 to 6 | Good | Fair | 68,563 |
| Ih 20 EB over E Fk Trinity Ri Rel #3 | good to fair; deck 7 to 6; substructure 7 to 6 | Good | Fair | 61,486 |
| Ih 20 WB over E Fk Trinity Ri Rel #3 | good to fair; deck 7 to 6; substructure 7 to 6 | Good | Fair | 61,486 |
| Ih 20 EB over Kings Creek | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 36,770 |
| Ih 20 EB over Muddy Cedar Creek Rel | good to fair; substructure 7 to 6 | Good | Fair | 26,006 |
| US 175 EB over E Fk Trinity Ri Rel #1 | good to fair; superstructure 8 to 7; substructure 7 to 6 | Good | Fair | 23,262 |
| US 175 EB over E Fk Trinity River | good to fair; substructure 7 to 6 | Good | Fair | 23,262 |
| Ih 20 WB over Big Brushy Crk Rel No 2 | good to fair; substructure 7 to 6 | Good | Fair | 21,122 |
| Ih 20 EB over Terry Creek | good to fair; deck 7 to 6 | Good | Fair | 21,122 |
| FM 548 over Mustang Creek | good to fair; substructure 7 to 6 | Good | Fair | 14,309 |
| US 175 WB over Little Cottonwood Creek | good to fair; substructure 7 to 6 | Good | Fair | 11,933 |
| SH 34 over Anthony Branch Trib | good to fair; culvert 7 to 6 | Good | Fair | 11,818 |
| US 175 WB over SH 198 | good to fair; substructure 7 to 6 | Good | Fair | 4,057 |
| FM 1389 over US 175 | good to fair; superstructure 7 to 6 | Good | Fair | 3,008 |
| FM 2728 over Draw | good to fair; culvert 7 to 6 | Good | Fair | 1,995 |
| FM 2932 over Buffalo Creek | good to fair; culvert 7 to 6 | Good | Fair | 1,864 |
| FM 2932 over Ih 20 | good to fair; substructure 7 to 6 | Good | Fair | 1,648 |
| FM 1390 over Drain | good to fair; culvert 7 to 6 | Good | Fair | 1,466 |
| FM 1391 over US 175 | good to fair; superstructure 7 to 6 | Good | Fair | 1,041 |
| FM 3396 over Drain | good to fair; culvert 7 to 6 | Good | Fair | 881 |
| FM 2860 over Little Cottonwood CR | good to fair; culvert 7 to 6 | Good | Fair | 809 |
| US 175 Sfr over Big Brushy Creek | good to fair; substructure 7 to 6 | Good | Fair | 233 |
| Talty Rd Ih 20 Row over Trib Little Brushy Crk | good to fair; culvert 7 to 6 | Good | Fair | 100 |
| Spur 557 EB Conn over Ih 20 | deck 7 to 6; substructure 6 to 5 | Fair | Fair | 34,675 |
| US 175 EB over Kings Creek | deck 6 to 5 | Fair | Fair | 28,117 |
| US 80 WB over Big Brushy Creek Rel 2 | superstructure 6 to 5 | Fair | Fair | 25,823 |
| US 175 EB & Sfr over Prairie Branch | culvert 6 to 5 | Fair | Fair | 25,591 |
| US 80 EB over Kings Creek Trib | substructure 6 to 5 | Fair | Fair | 3,842 |
| Ih 20 WB over FM 740 | deck 7 to 6; substructure 7 to 6 | Fair | Fair | 61,486 |
| Ih 20 EB over FM 740 | substructure 7 to 6 | Fair | Fair | 61,486 |
| Ih 20 EB over FM 1641 | substructure 7 to 6 | Fair | Fair | 22,495 |
| Ih 20 EB over Big Brushy Crk Rel No 1 | deck 7 to 6 | Fair | Fair | 21,122 |
| Ih 20 WB over Big Brushy Creek | substructure 7 to 6 | Fair | Fair | 21,122 |
| Ih 20 EB over Big Brushy Crk Rel No 2 | substructure 7 to 6 | Fair | Fair | 21,122 |
| US 175 WB over Buffalo Creek | deck 7 to 6 | Fair | Fair | 15,521 |
| SH 205 over Big High Point Creek | deck 7 to 6 | Fair | Fair | 13,288 |
Showing the 40 largest of 63 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US 175 WB over FM 148 | fair to good; deck up 6 to 8 | Fair | Good | 34,267 |
| US 80 over Draw | fair to good; culvert up 6 to 7 | Fair | Good | 33,452 |
| US 175 WB over E Fk Trinity Ri Rel #1 | fair to good; substructure up 6 to 7 | Fair | Good | 23,262 |
| US 80 over Draw | fair to good; culvert up 6 to 7 | Fair | Good | 19,694 |
| SH 205 over Little High Point Creek | poor to fair; superstructure up 4 to 6 | Poor | Fair | 13,046 |
| US 80 EB over Muddy Cedar Creek | fair to good; substructure up 6 to 7 | Fair | Good | 3,953 |
| US 80 WB over Muddy Cedar Creek | fair to good; deck up 6 to 7; superstructure up 6 to 8; substructure up 5 to 7 | Fair | Good | 3,076 |
| SH 243 over Little Cottonwood Creek | fair to good; culvert up 6 to 7 | Fair | Good | 2,883 |
| FM 2578 over Little Brushy Creek | fair to good; culvert up 6 to 7 | Fair | Good | 2,184 |
| FM 3039 over E Fork Trinity River | fair to good; substructure up 6 to 7 | Fair | Good | 1,991 |
| FM 1895 over Draw | fair to good; culvert up 5 to 7 | Fair | Good | 838 |
| FM 2727 over Williams Creek | fair to good; culvert up 6 to 7 | Fair | Good | 756 |
| FM 2515 over Jones Creek | fair to good; culvert up 6 to 7 | Fair | Good | 659 |
5 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 6 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| US 175 EB over Buffalo Creek | closed | 1977 | 15,521 | February 2024 | Good |
| SH 205 over Little High Point Creek | posted for load | 1936 | 13,046 | March 2024 | Fair |
| Colquitt Rd over Bachelor Creek | posted for load | 2000 | 3,280 | February 2023 | Good |
| Griffith Ave over Bachelor Creek | posted for load | 1936 | 2,477 | February 2023 | Fair |
| US 175 Nfr over Big Brushy Creek Relief | posted for load | 1977 | 251 | April 2024 | Good |
| CR 115 over Walnut Creek | posted for load | 1970 | 48 | February 2023 | Fair |
| Co Rd 321 over Greasy Creek | posted for load | 1983 | 10 | February 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Texas department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 6 on 12 months or less, 434 on 24 months, 11 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Kaufman County is dated November 2024; 381 bridges have an inspection dated in 2024.
Scour critical (item 113): 4 bridges; 18 over water not yet evaluated for scour. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| US 80 Sfr over Buffalo Creek Relief | open | 1930 | 12,005 | January 2024 | Poor |
| US 175 EB over Lake Creek | open | 1938 | 9,132 | March 2024 | Fair |
| FM 548 over Big Brushy Creek | open | 1961 | 7,450 | March 2024 | Fair |
| CR 4036 over Little Cottonwood Creek | open | 2004 | 25 | November 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 80 WB over East Fork Trinity River | 1930 | 33,856 | Poor |
| US 80 WB over Buffalo Creek Relief | 1955 | 33,856 | Poor |
| US 80 EB over Buffalo Creek Relief | 1955 | 33,856 | Poor |
| US 80 Sfr over Buffalo Creek Relief | 1930 | 12,005 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US 80 Wbml over East Fork Trinity River | 2024 | 87,026 | Good |
| US 80 Wbml over E Fork Trinity Relief #1 | 2024 | 87,026 | Good |
| Ih 20 EB Ent Ramp over Bachelor Creek | 1987 | 70,069 | Fair |
| US 80 over Mustang Creek | 1957 | 68,563 | Fair |
| US 80 EB Frtg Rd over Mustang Crk Trib | 1957 | 68,563 | Fair |
| US 80 over Draw | 1957 | 68,563 | Fair |
| US 80 over FM 548 | 2012 | 68,563 | Fair |
| Ih 20 EB over E Fk Trinity Ri Rel #3 | 1984 | 61,486 | Fair |
| Ih 20 WB over E Fk Trinity Ri Rel #3 | 1984 | 61,486 | Fair |
| Ih 20 WB over FM 740 | 1987 | 61,486 | Fair |
Frequently asked questions
Are any bridges closed in Kaufman County, Texas?
1 bridge of the 451 in Kaufman County is coded closed to all traffic in the 2025 National Bridge Inventory, and 6 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Texas department of transportation.
Have any bridges failed in Kaufman County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Kaufman County: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and 2 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Kaufman County last inspected?
Inspection dates in the 2025 inventory for Kaufman County run from April 2022 to November 2024. Intervals: 6 on 12 months or less, 434 on 24 months, 11 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Kaufman County → - all 451, busiest first, each with its own condition record.
All of Texas: Texas bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.