Bridge conditions in Langlade County, Wisconsin
78 inventoried bridges · 0 closed · 7 posted · 6 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 78 bridges.
Langlade County tracks close to typical: 6 of its 78 inventoried bridges (7.7%) are rated poor, against a national rate of about 7%.
- 6 of the 78 bridges in Langlade County, Wisconsin, are rated in poor condition (7.7%) in the 2025 National Bridge Inventory, as of .
- Langlade County has no bridges closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, no bridges dropped into poor condition and 3 bridges improved out of it; 12 bridges had at least one major component rating lowered.
- Inspection dates on record run from July 2021 to October 2024; 9 bridges over water are coded scour critical.
- 37 bridges (47.4%) are rated good and 35 (44.9%) fair.
- The median Langlade County bridge was built in 1990.
- The busiest poor-rated bridge is Lrd 7TH Ave over Spring Brook (built 1935), carrying about 1,699 vehicles a day.
What this page is: the federal bridge inspection inventory for Langlade County: inspector ratings, closures and load postings as reported by the Wisconsin DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 47.4% · Fair 44.9% · Poor 7.7% of 78 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Lrd Little Chicago over E Br Eau Claire River | good to fair; culvert 7 to 5 | Good | Fair | 285 |
| Lrd 6TH Ave over Spring Brook | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 2,026 |
| Lrd North Ave over Spring Brook | good to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 9 | Good | Fair | 1,070 |
| Lrd Ormsby Rd over W Br Eau Claire River | good to fair; superstructure 7 to 6; substructure 7 to 6; deck up 7 to 9 | Good | Fair | 180 |
| Lrd River Rd over E Br Eau Claire River | good to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 9 | Good | Fair | 126 |
| Lrd Range Line Rd over W Br Eau Claire River | good to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 7 to 9 | Good | Fair | 103 |
| Lrd Riverside Rd over Red River | good to fair; culvert 7 to 6 | Good | Fair | 72 |
| Lrd Highland Rd (d over W Br Eau Claire River | good to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 7 to 9 | Good | Fair | 53 |
| Ush 45 over Drainage Way | culvert 6 to 5 | Fair | Fair | 10,680 |
| Lrd Hudson St over Spring Brook | culvert 6 to 5 | Fair | Fair | 623 |
| Sth 64 over Wolf River | substructure 7 to 6 | Poor | Poor | 1,600 |
| Lrd Spring Rd over E Br Eau Claire River | deck 7 to 6; superstructure 7 to 6; substructure up 5 to 9 | Fair | Fair | 134 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Lrd Koszarek Rd over Br Spring Brook | poor to fair; deck up 4 to 6; superstructure up 4 to 6; substructure up 4 to 9 | Poor | Fair | 331 |
| Cth H over Big Hay Meadow Creek | poor to fair; culvert up 4 to 5 | Poor | Fair | 248 |
| Lrd Van Alstine Rd over S Br Oconto River | poor to fair; deck up 5 to 6; superstructure up 5 to 6; substructure up 4 to 5 | Poor | Fair | 17 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 2 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Sth 64 over Black Brook | posted, other restriction | 1961 | 2,000 | May 2023 | Good |
| Lrd Koszarek Rd over Br Spring Brook | posted for load | 1967 | 331 | October 2024 | Fair |
| Cth H over Prairie River | posted for load | 1963 | 248 | October 2024 | Poor |
| Lrd Stamper Rd over Evergreen Creek | posted, other restriction | 1930 | 222 | October 2024 | Fair |
| Lrd Range Line Rd over Black Brook | posted for load | 1970 | 70 | October 2024 | Poor |
| Lrd Van Alstine Rd over S Br Oconto River | posted for load | 1921 | 17 | October 2024 | Fair |
| Lrd Old 64 (dead E over Evergreen Creek | posted for load | 1916 | 6 | October 2024 | Poor |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Wisconsin department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 9 on 12 months or less, 34 on 24 months, 35 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Langlade County is dated October 2024; 42 bridges have an inspection dated in 2024.
Scour critical (item 113): 9 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Lrd 2ND Ave over Spring Brook | open | 1966 | 1,803 | October 2024 | Fair |
| Lrd 7TH Ave over Spring Brook | open | 1935 | 1,699 | October 2024 | Poor |
| Lrd Watson St over Spring Brook | open | 1939 | 414 | October 2024 | Fair |
| Lrd Koszarek Rd over Br Spring Brook | posted for load | 1967 | 331 | October 2024 | Fair |
| Lrd Gowan Rd over Spring Brook | open | 1966 | 248 | October 2024 | Fair |
| Lrd 1ST Ave over N Br Pine River | open | 1940 | 55 | October 2024 | Fair |
| Lrd Van Alstine Rd over S Br Oconto River | posted for load | 1921 | 17 | October 2024 | Fair |
| Lrd County Line Ro over Big Hay Meadow Creek | open | 1922 | 14 | October 2024 | Poor |
| Lrd Old 64 (dead E over Evergreen Creek | posted for load | 1916 | 6 | October 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Lrd 7TH Ave over Spring Brook | 1935 | 1,699 | Poor |
| Sth 64 over Wolf River | 1948 | 1,600 | Poor |
| Cth H over Prairie River | 1963 | 248 | Poor |
| Lrd Range Line Rd over Black Brook | 1970 | 70 | Poor |
| Lrd County Line Ro over Big Hay Meadow Creek | 1922 | 14 | Poor |
| Lrd Old 64 (dead E over Evergreen Creek | 1916 | 6 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Ush 45-sth 47-sth over Spring Brook | 1990 | 11,700 | Good |
| Ush 45 over Drainage Way | 1953 | 10,680 | Fair |
| Lrd 5TH St over Spring Brook | 1973 | 8,488 | Fair |
| Sth 64 over Spring Brook | 2021 | 7,500 | Good |
| Lrd 10TH Ave over Spring Brook | 1996 | 4,788 | Fair |
| Sth 64 over Elton Creek | 2022 | 2,600 | Good |
| Sth 64 over E Br Eau Claire River | 1982 | 2,200 | Good |
| Lrd 6TH Ave over Spring Brook | 1993 | 2,026 | Fair |
| Sth 64 over Black Brook | 1961 | 2,000 | Good |
| Sth 64 over W Br Eau Claire River | 1965 | 2,000 | Fair |
Frequently asked questions
Are any bridges closed in Langlade County, Wisconsin?
No bridges of the 78 in Langlade County are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Wisconsin department of transportation.
Have any bridges failed in Langlade County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Langlade County: no bridges with a component rated 2 (critical) or lower, 6 bridges rated poor overall, and no bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Langlade County last inspected?
Inspection dates in the 2025 inventory for Langlade County run from July 2021 to October 2024. Intervals: 9 on 12 months or less, 34 on 24 months, 35 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Langlade County → - all 78, busiest first, each with its own condition record.
All of Wisconsin: Wisconsin bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.