BridgeReportCard
Home › Wisconsin › Marathon County

Bridge conditions in Marathon County, Wisconsin

531 inventoried bridges · 0 closed · 38 posted · 40 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 531 bridges.

40 of the 531 bridges the federal inventory lists in Marathon County are rated poor; the rest split 203 good and 288 fair.

What this page is: the federal bridge inspection inventory for Marathon County: inspector ratings, closures and load postings as reported by the Wisconsin DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 38.2% · Fair 54.2% · Poor 7.5% of 531 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

6
dropped into poor
since 2024
15
improved out of poor
since 2024
114
had a rating lowered
deck, superstructure, substructure or culvert
2
newly closed or posted
0 closed, 2 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Lrd N Gavin Ave over Little Eau Pleine Rivernewly posted for load; fair to poor; superstructure 5 to 4; deck up 5 to 6; substructure up 5 to 6FairPoor68
Lrd River Edge Rd over Big Sandy Creeknewly posted for load; fair to poor; deck 6 to 5; substructure 5 to 4FairPoor23
Lrd Wertzburg Rd over Randall Creekfair to poor; substructure 5 to 4FairPoor105
Lrd 136TH St (dea over Artus Creekfair to poor; superstructure 5 to 4; deck up 7 to 8FairPoor100
Lrd Butternut Rd over Br Haman Creekfair to poor; substructure 5 to 4; deck up 6 to 7FairPoor30
Lrd Thirteen Lane over Br Mcginnis Creekfair to poor; culvert 5 to 4FairPoor24
Lrd Owl Ridge Rd over Big Sandy Creekgood to fair; deck 7 to 5; superstructure 7 to 5; substructure 7 to 6GoodFair139
Lrd Bobrich Rd over Plover Rivergood to fair; deck 7 to 6; substructure 7 to 5; superstructure up 7 to 9GoodFair71
Ush 51 NB to 29 WB over Landgood to fair; superstructure 8 to 6GoodFair7,200
Lrd Balsam Rd over Eau Pleine Flowagegood to fair; substructure 8 to 6; superstructure up 8 to 9GoodFair138
Sth 29 over Artus CRgood to fair; culvert 7 to 6GoodFair22,300
Ush 51 over Bos Creekgood to fair; culvert 7 to 6GoodFair20,700
Ih Ush 51-ih 39 NB over Wisconsin River 27good to fair; substructure 7 to 6GoodFair18,800
Ush Bus 51-thomas over Cnw RRgood to fair; deck 7 to 6; superstructure up 8 to 9; substructure up 7 to 9GoodFair16,100
Ih Ush 51 -ih 39 S over Johnson Creekgood to fair; deck 7 to 6GoodFair11,157
Ush 51 SB over Lrd Rainbow Drgood to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6GoodFair10,600
Ush 51 NB over Lrd Rainbow Drgood to fair; deck 7 to 6; superstructure 7 to 6GoodFair10,400
Sth 29 EB over Cth Jgood to fair; deck 7 to 6; substructure 7 to 6GoodFair9,400
Sth 29 EB over Pet Brookgood to fair; deck 7 to 6; superstructure 7 to 6GoodFair8,700
Cth K over Silver Creekgood to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 8 to 9GoodFair8,130
USH51NB to STH29WB over Canadian National RRgood to fair; superstructure 8 to 7; substructure 7 to 6GoodFair7,200
Lrd 6TH St over Jim Moore Creekgood to fair; deck 7 to 6; substructure 7 to 6; superstructure up 8 to 9GoodFair7,105
Sth 29 WB over Plover Rivergood to fair; substructure 7 to 6GoodFair6,650
Sth 29 EB over Plover Rivergood to fair; deck 7 to 6; superstructure 7 to 6GoodFair6,650
Sth 29 WB over Big Eau Pleine Rivergood to fair; substructure 7 to 6; superstructure up 7 to 8GoodFair6,400
Sth 29 EB over Porky Creekgood to fair; deck 7 to 6; superstructure 7 to 6GoodFair6,400
Sth 29 EB over Randall Creekgood to fair; substructure 7 to 6GoodFair6,400
Sth 29 EB over Sth 13good to fair; substructure 7 to 6GoodFair5,850
Sth 29 Ramp over Lrd 28TH Avegood to fair; substructure 7 to 6GoodFair4,400
Cth U over Ush 51 NBgood to fair; superstructure 7 to 6GoodFair3,100
Ush 51 over Ush 51good to fair; superstructure 7 to 6GoodFair3,000
Cth Y over Sth 29good to fair; deck 7 to 6; substructure 7 to 6GoodFair2,800
Lrd 10TH St over Jim Moore Creekgood to fair; deck 7 to 6; substructure 7 to 6; superstructure up 8 to 9GoodFair2,211
Lrd Ryan St over Sth 29good to fair; deck 7 to 6; substructure 7 to 6GoodFair2,000
Cth M over Little Eau Pleine Rgood to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 7 to 9GoodFair1,704
Sth 29 EB Off Ramp over Plover Rivergood to fair; substructure 7 to 6; deck up 7 to 8GoodFair1,600
Cth F over Dill Creekgood to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 8 to 9GoodFair646
Lrd Wadleigh St over Plover Rivergood to fair; deck 7 to 6; superstructure 7 to 6; substructure up 7 to 9GoodFair253
Lrd Valley Lane over Little Rib Rivergood to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6GoodFair148
Lrd Guldan St over Br Little Eau Pleine Rivgood to fair; substructure 7 to 6; deck up 7 to 9; superstructure up 7 to 9GoodFair146

Showing the 40 largest of 114 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Cth J over Big Sandy Creekpoor to fair; deck up 4 to 5; superstructure up 4 to 5PoorFair1,457
Lrd Stettin Drive over Little Rib Riverpoor to fair; deck up 4 to 5; superstructure up 4 to 5; substructure up 4 to 5PoorFair1,102
Cth J over Trappe Riverpoor to fair; deck up 4 to 5; superstructure up 4 to 5PoorFair621
Lrd 14TH Ave over Bos Creekfair to good; culvert up 6 to 8FairGood413
Cth Y NB & SB over Eau Claire Riverfair to good; superstructure up 7 to 8; substructure up 6 to 7FairGood238
Lrd Woodland Dr over Br Little Rib Riverpoor to fair; substructure up 3 to 5PoorFair112
Lrd Le Roy St. over Fenwood Creekfair to good; deck up 6 to 7; substructure up 6 to 8FairGood102
Lrd Club House Rd over Eau Claire Riverpoor to fair; deck up 4 to 5; superstructure up 7 to 9PoorFair92
Lrd Guldan St over Wild Creekpoor to fair; deck up 6 to 9; superstructure up 6 to 9; substructure up 4 to 6PoorFair92
Lrd Chesak Rd. over Haman Creekfair to good; deck up 6 to 8; superstructure up 6 to 7; substructure up 5 to 7FairGood91
Lrd Bevent Rd (dea over Little Eau Claire Riverpoor to fair; superstructure up 5 to 6; substructure up 4 to 5PoorFair90
Lrd Junction Rd over Big Sandy Creekpoor to fair; deck up 4 to 5; superstructure up 4 to 5; substructure up 4 to 5PoorFair88
Lrd Smoky Hill Rd over Little Eau Pleine Riverpoor to fair; substructure up 4 to 5PoorFair88
Lrd Huckleberry Rd over Haman Creekfair to good; deck up 7 to 9; superstructure up 7 to 9; substructure up 6 to 7FairGood81
Lrd Lincoln Dr over Little Rib Riverpoor to fair; deck up 7 to 8; superstructure up 7 to 8; substructure up 4 to 6PoorFair65

The 15 busiest of 20 improvements.

12 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 11 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Cth N over Big Sandy Creekposted, other restriction19594,000September 2023Fair
Cth U over Little Rib Riverposted, other restriction19571,985August 2024Poor
Cth M over Little Eau Pleine Riverposted, other restriction19611,720September 2023Fair
Cth J over Eau Claire Riverposted, other restriction19551,441September 2023Fair
Cth C over Plover Riverposted for load1954811September 2024Poor
Cth A over W Br Eau Pleine Riverposted, other restriction1962783August 2024Poor
Cth T over Mcgivern Creekposted, other restriction1957767September 2024Poor
Cth H over Rocky Runposted, other restriction1960668September 2024Poor
Cth F over E Br Big Eau Pleine Riveposted for load1962665August 2024Poor
Cth S over Br Big Rib Riverposted for load1938634September 2024Poor
Cth J over Trappe Riverposted, other restriction1964621September 2024Fair
Cth Q over E Br Big Sandy Creekposted, other restriction1967602October 2024Poor
Cth P over Fenwood Creekposted, other restriction1959565September 2024Poor
Cth N over Haman Creekposted, other restriction1952521September 2024Poor
Cth L over Grass Creekposted for load1961478August 2024Poor
Lrd Shady Lane Rd over Little Trappe Riverposted, other restriction1982424September 2024Good
Cth M over Fenwood Creekposted, other restriction1938283September 2024Poor
Lrd County Line Rd over Big Cain Creekposted for load1965248September 2024Poor
Lrd Pleasant Rd over E Br Yellow Riverposted, other restriction1947133July 2024Poor
Lrd Meridian Rd over Black Creekposted for load1940128July 2024Fair
Lrd E Mc Millan Rd over Squaw Creekposted, other restriction1958112July 2024Fair
Lrd Woodland Dr over Br Little Rib Riverposted, other restriction1929112July 2024Fair
Lrd Sugar Bush Rd over Freeman Creekposted, other restriction198697October 2024Fair
Lrd 60TH Ave over Otto Creekposted for load195592September 2024Poor
Lrd Bevent Rd over Plover Riverposted for load197592October 2024Fair
Lrd Chesak Rd. over Haman Creekposted, other restriction194091August 2024Good
Lrd Pope Ave over Br W Br Big Eau Pleine Rposted, other restriction193091August 2024Poor
Lrd Abe Lincoln Av over Carlson Creekposted for load192990July 2024Poor
Lrd Rosedale Ave over W Br Big Eau Pleine Riveposted for load193690August 2024Fair
Lrd Bobrich Rd over Plover Riverposted, other restriction198571October 2024Fair
Lrd N Gavin Ave over Little Eau Pleine Riverposted, other restriction196268July 2024Poor
Lrd Mitchell Lane over Br Little Rib Riverposted, other restriction194362July 2024Fair
Lrd Fairview Rd over Rocky Runposted for load197155August 2024Fair
Lrd River Hills Rd over Big Cain Creekposted for load196247September 2024Fair
Lrd Nehrbass Rd over Br Black Creekposted, other restriction194644July 2024Fair
Lrd Corlad Rd over Black Creekposted, other restriction198226July 2024Fair
Lrd River Edge Rd over Big Sandy Creekposted for load192923September 2024Poor
Lrd Chesak Rd over Scotch Creekposted for load196220August 2024Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Wisconsin department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 53 on 12 months or less, 293 on 24 months, 185 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Marathon County is dated November 2024; 371 bridges have an inspection dated in 2024.

Scour critical (item 113): 61 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 2 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Lrd Stewart Ave over Wisconsin River 31open191528,144September 2024Poor
Sth 107 over Br W Fk Little Rib Riveropen19232,200June 2023Fair
Cth C over E Br Lt Eau Pleine Riveropen19411,465September 2023Fair
Cth C over W Br Lt Eau Pleine Riveropen19301,465September 2023Fair
Cth S over Br Big Rib Riverposted for load1938634September 2024Poor
Cth Q over E Br Big Sandy Creekposted, other restriction1967602October 2024Poor
Cth Q over Little Sandy Creekopen1972600October 2023Fair
Cth P over Rock Creekopen1932500September 2023Fair
Cth P over Foreman Creekopen1932306September 2023Fair
Lrd Brookfield Rd over Br Soda Creekopen1920272August 2024Good
Lrd County Line Rd over Big Cain Creekposted for load1965248September 2024Poor
Lrd Holton Rd over W Br Big Eau Pleine Riveopen1968200August 2024Fair
Lrd Rainbow Dr over County Line Creekopen1928171September 2024Good
Lrd Corlad Rd over Potato Creekopen1957142July 2024Fair
Lrd Meridian Rd over Black Creekposted for load1940128July 2024Fair
Lrd Chesak Rd over Br Scotch Creekopen1931127August 2024Poor
Lrd Mcmillan Rd over Squaw Creekopen1956122July 2024Poor
Lrd E Mc Millan Rd over Squaw Creekposted, other restriction1958112July 2024Fair
Lrd Woodland Dr over Br Little Rib Riverposted, other restriction1929112July 2024Fair
Lrd 136TH St (dea over Artus Creekopen1963100July 2024Poor
Lrd Chokecherry Rd over Dill Creekopen1955100August 2024Fair
Lrd Mulberry Rd over Winding Creekopen195598August 2024Poor
Lrd Guldan St over Wild Creekopen196792October 2024Fair
Lrd Soda Creek Rd over Br Scotch Creekopen193092August 2024Good
Lrd Chesak Rd. over Haman Creekposted, other restriction194091August 2024Good
Lrd Draper Rd over E Br Big Eau Pleine Riveopen194691August 2024Fair
Lrd Pope Ave over Br W Br Big Eau Pleine Rposted, other restriction193091August 2024Poor
Lrd Taylor-maratho over W Br Big Eau Pleine Riveopen196691August 2024Fair
Lrd Abe Lincoln Av over Carlson Creekposted for load192990July 2024Poor
Lrd Town Line Rd over Marsh Creekopen194190August 2024Fair
Lrd Trappe River R over Trappe Riveropen196387September 2024Fair
Lrd Silver Leaf Rd over Randall Creekopen193084July 2024Fair
Lrd Hollywood La over Four Mile Creekopen194682October 2024Fair
Lrd Burma Rd over Freeman Creekopen194081October 2024Fair
Lrd N Gavin Ave over Little Eau Pleine Riverposted, other restriction196268July 2024Poor
Lrd Pleasant View over Little Sandy Creekopen192766October 2023Fair
Lrd Lincoln Dr over Br Little Rib Riveropen193865July 2024Fair
Lrd Holstein La over Rocky Runopen190462October 2024Fair
Lrd Mitchell Lane over Br Little Rib Riverposted, other restriction194362July 2024Fair
Lrd Duxbury Lane over Little Eau Pleine Riveropen196558July 2024Fair
Lrd Sunrise Rd over Prospect Creekopen192753September 2024Fair
Lrd Rock Rd over Rock Creekopen194652August 2024Fair
Lrd Abt Rd over Mole Brookopen196451October 2024Fair
Lrd Briar Wood Rd over Burns Creekopen193051October 2024Fair
Lrd North Rd (dead over Johnson Creekopen193551October 2024Fair
Lrd Blueberry Rd over Haman Creekopen197450August 2024Fair
Lrd Buffalo Ridge over Trappe Riveropen196047September 2024Fair
Lrd Drewek Creek R over Drewek Creekopen193844July 2024Good
Lrd Nehrbass Rd over Br Black Creekposted, other restriction194644July 2024Fair
Lrd Rainbow Dr over Br Little Rib Riveropen202044July 2024Good

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Lrd Stewart Ave over Wisconsin River 31191528,144Poor
Cth U over Little Rib River19571,985Poor
Cth N over Big Eau Pleine River19611,106Poor
Cth A over Big Rib River19561,032Poor
Cth C over Plover River1954811Poor
Cth H over Black Creek1969807Poor
Cth A over W Br Eau Pleine River1962783Poor
Cth T over Mcgivern Creek1957767Poor
Cth H over Rocky Run1960668Poor
Cth F over E Br Big Eau Pleine Rive1962665Poor
Cth M over Big Eau Pleine River1975637Poor
Cth S over Br Big Rib River1938634Poor
Cth Q over E Br Big Sandy Creek1967602Poor
Cth S over Little Eau Pleine River1964591Poor
Cth P over Fenwood Creek1959565Poor
Cth N over Haman Creek1952521Poor
Cth L over Grass Creek1961478Poor
Lrd Columbus St over Plover River1958391Poor
Cth Vv over Little Wolf River1962360Poor
Cth P over Big Eau Pleine River1958299Poor
Cth M over Fenwood Creek1938283Poor
Lrd Aspen Rd over Scotch Creek1968271Poor
Lrd County Line Rd over Big Cain Creek1965248Poor
Lrd Pleasant Rd over E Br Yellow River1947133Poor
Lrd Chesak Rd over Br Scotch Creek1931127Poor
Lrd Mcmillan Rd over Squaw Creek1956122Poor
Lrd Wertzburg Rd over Randall Creek1975105Poor
Lrd 136TH St (dea over Artus Creek1963100Poor
Lrd Mulberry Rd over Winding Creek195598Poor
Lrd 96TH Ave over Little Rib River194195Poor
Lrd 60TH Ave over Otto Creek195592Poor
Lrd Pope Ave over Br W Br Big Eau Pleine R193091Poor
Lrd Abe Lincoln Av over Carlson Creek192990Poor
Lrd N Gavin Ave over Little Eau Pleine River196268Poor
Lrd Naugart Dr over W Fk Lt Rib River199043Poor
Lrd Huckleberry Rd over Randall Creek192030Poor
Lrd Butternut Rd over Br Haman Creek192030Poor
Lrd Thirteen Lane over Br Mcginnis Creek197724Poor
Lrd River Edge Rd over Big Sandy Creek192923Poor
Lrd Chesak Rd over Scotch Creek196220Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Ih Ush 51-ih 39 NB over Ush Bus 51 & R.R.201239,600Fair
Ih 39 Sb/ush 51 over Ush Bus 51201339,600Good
Ush 51NB over Lrd Stewart Ave200938,600Good
Ush 51 SB over Lrd Hwy 52 Parkway200738,600Good
Ih Ush 51-ih 39 SB over Wisconsin River 26196837,700Good
Ush 51 NB over Lrd Sherman St200734,100Good
Ush 51SB over Lrd Sherman Ave200734,100Good
Ush 51 NB over Wis Central Ltd RR200734,100Good
Ush 51 SB over Wisconsin Central RR200734,100Good
Ush B51-grand Ave over Wisconsin Central Ltd196431,844Fair

Frequently asked questions

Are any bridges closed in Marathon County, Wisconsin?

No bridges of the 531 in Marathon County are coded closed to all traffic in the 2025 National Bridge Inventory, and 38 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Wisconsin department of transportation.

Have any bridges failed in Marathon County?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Marathon County: no bridges with a component rated 2 (critical) or lower, 40 bridges rated poor overall, and 6 bridges that dropped into poor condition since the 2024 inventory.

When were bridges in Marathon County last inspected?

Inspection dates in the 2025 inventory for Marathon County run from May 2021 to November 2024. Intervals: 53 on 12 months or less, 293 on 24 months, 185 on 48 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Marathon County → - all 531, busiest first, each with its own condition record.

All of Wisconsin: Wisconsin bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.