BridgeReportCard
Home › Alaska › Petersburg Borough › No Data Entered over No Data Entered

No Data Entered over No Data Entered

Petersburg Borough, Alaska · rated Poor in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (56.92977, -132.77372)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck65Fair condition
Superstructure65Fair condition
Substructure44Poor condition

Bridge details

StructureTimber slab
Lengthabout 40 ft
LocationThomas Bay
NBI structure number100521000003408
Condition classPoor
Traffic status (item 41)Open, no restriction
Last inspection (item 90)August 2024
Inspection interval (item 91)24 months
Scour (item 113)4: foundations stable, field review says exposed foundations need protection

Source: FHWA National Bridge Inventory, 2025 data as reported by the Alaska department of transportation.

Busiest bridges in Petersburg Borough

BridgeBuiltVehicles/dayCondition
Nordic Drive over Hammer Slough19744,210Fair
Ifa Ferry Route over Petersburg S Mitkof Term20062,659Good
Irr:ptrsbg/kake Rd over Gunnuk Creek1981770Fair
Mitkof Highway over Twin Creek1996760Good
Irr:keku Rd (kake) over Sitkum Creek2011270Fair
Birch Street over Birch Street Viaduct1960200Fair

All bridges nearby: Petersburg Borough, AK bridge conditions · every bridge in Petersburg Borough · Alaska bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.