Pr 123 67.0 Km over El Jobo Creek
Arecibo Municipio, Puerto Rico · rated Poor in the 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor Faded: the 10 nearest inventoried bridges in Arecibo Municipio.
- Pr 123 67.0 Km over El Jobo Creek in Arecibo Municipio, Puerto Rico, is rated in poor condition in the 2025 National Bridge Inventory (as of ).
- Its lowest-rated component is the substructure, rated 3 (serious condition) on the 0-9 scale.
- It was built in 1940, making it 85 years old at the 2025 inventory.
- It carries about 1,100 vehicles a day (traffic count year 2017).
- Its listed owner is the state highway agency.
- It is one of 11 of the 54 inventoried bridges in Arecibo Municipio rated poor (20.4%); 11 (20.4%) are rated poor.
- Its traffic status in the 2025 inventory is open, posting recommended but not legally implemented (NBI item 41).
- Its class is unchanged from 2024 (poor), but component ratings moved: superstructure 7 to 6.
- Status change: its 2024 load posting has been removed.
- Its most recent inspection on record is dated October 2024, on a 12-month routine inspection cycle.
- It is coded scour critical (NBI item 113 = 2): scour critical: extensive scour observed, foundations unstable.
- A poor rating means at least one major component - deck, superstructure, or substructure - is rated 4 or lower on FHWA's 0-9 scale. It does not by itself mean the bridge is unsafe; bridges judged unsafe are closed or load-restricted by their owners.
Open this bridge in Google Maps → (18.3241, -66.67379)
Component ratings
| Component | Rating (2024) | Rating (2025) | FHWA scale meaning |
|---|---|---|---|
| Deck | 6 | 6 | Satisfactory condition |
| Superstructure | 7 | 6 | Satisfactory condition |
| Substructure | 3 | 3 | Serious condition |
Bridge details
| Structure | Continuous concrete slab |
| Length | about 130 ft |
| Location | 12 Km North of Utuado |
| NBI structure number | 001621 |
| Condition class | Poor |
| Traffic status (item 41) | Open, posting recommended but not legally implemented |
| Last inspection (item 90) | October 2024 |
| Inspection interval (item 91) | 12 months |
| Scour (item 113) | 2: scour critical: extensive scour observed, foundations unstable |
Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.
Busiest bridges in Arecibo Municipio
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 22 Westbound over Local Road | 1972 | 46,000 | Fair |
| Pr 22 over Local Road | 1992 | 43,800 | Fair |
| Pr 22 over Local Road | 1992 | 43,800 | Fair |
| Pr 2 72.8 Km over Dirt Road | 1940 | 29,500 | Fair |
| Pr 22 Westbound over Pr 10 | 1980 | 28,300 | Fair |
| Pr 22 Westbound over SANTIAGO RIVER & L R | 1980 | 28,300 | Fair |
All bridges nearby: Arecibo Municipio, PR bridge conditions · every bridge in Arecibo Municipio · Puerto Rico bridges.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.