BridgeReportCard
Home › Puerto Rico › Arroyo Municipio › Pr 753 over Irrigation Channel

Pr 753 over Irrigation Channel

Arroyo Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (17.98983, -66.05403)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure66Satisfactory condition
Substructure66Satisfactory condition

Bridge details

StructureSteel stringer or multi-beam girder
Lengthabout 43 ft
LocationSOUTH OF INT PR 753 &
NBI structure number005271
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)April 2023
Inspection interval (item 91)24 months
Scour (item 113)5: foundations stable, scour within the limits of the footing or piles

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Arroyo Municipio

BridgeBuiltVehicles/dayCondition
Pr 3 132.5 Km over Nigua River198127,700Fair
Pr 3 over Yaurel Creek200319,800Good
Pr 3 Km 132.0 over Nigua River200517,600Fair
Pr 54 over Patillas Channel200017,500Good
Pr 178 0.8 Km over Nigua River19887,500Fair
Off Pr 178 Km 0.7 over Nigua River20007,500Fair

All bridges nearby: Arroyo Municipio, PR bridge conditions · every bridge in Arroyo Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.