BridgeReportCard
Home › Puerto Rico › Cataño Municipio › Pr 22 over Malaria Creek

Pr 22 over Malaria Creek

Cataño Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.42261, -66.12885)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck55Fair condition
Superstructure55Fair condition
Substructure55Fair condition

Bridge details

StructureContinuous concrete slab
Lengthabout 129 ft
Location3 KM E INT PR 22 & PR
NBI structure number011781
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)April 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Cataño Municipio

BridgeBuiltVehicles/dayCondition
Ramp Pr 22 to Pr 5 over Pr 221971124,000Fair
Pr 22 over Oil Pipe Lines1971104,500Fair
Pr 22 over Drainage Ditch1971104,500Fair
Pr 22 over Drainage Ditch1971104,500Fair
Pr 22 over Pr 51971104,500Fair
Ramp Pr 22 to Pr 5 over Pr 51971104,500Fair

All bridges nearby: Cataño Municipio, PR bridge conditions · every bridge in Cataño Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.