BridgeReportCard
Home › Puerto Rico › Isabela Municipio › Pr 4466 1.8 Km over Creek

Pr 4466 1.8 Km over Creek

Isabela Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.5107, -67.0958)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Culvert55Fair condition

Bridge details

StructureConcrete culvert
Lengthabout 40 ft
Location4.5 Miles West of Isabela
NBI structure number012961
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)May 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Isabela Municipio

BridgeBuiltVehicles/dayCondition
Pr 112 3.7 Km over Irrigation Channel19825,700Poor
Pr-4494 over Depression2009600Fair
Pr-4494 over Waterway2009600Good
Pr-4494 over Waterway2009600Fair

All bridges nearby: Isabela Municipio, PR bridge conditions · every bridge in Isabela Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.