BridgeReportCard
Home › Puerto Rico › Camuy Municipio › Pr 119 over Camuy River

Pr 119 over Camuy River

Camuy Municipio, Puerto Rico · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.48368, -66.83862)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck66Satisfactory condition
Superstructure77Good condition
Substructure77Good condition

Bridge details

StructureConcrete multiple box beam
Lengthabout 85 ft
Location2 Km East of Camuy
NBI structure number022571
Condition classFair
Traffic status (item 41)Posted for load
Last inspection (item 90)May 2023
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Camuy Municipio

BridgeBuiltVehicles/dayCondition
Pr 119 over Pr 2199012,600Fair
Pr 455 over Soller Creek19571,700Poor
Pr 486 11.85 Km over Abra Honda Creek1973900Fair

All bridges nearby: Camuy Municipio, PR bridge conditions · every bridge in Camuy Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.