BridgeReportCard
Home › Puerto Rico › Patillas Municipio › Pr 181 34.1 Km over Irrigation Channel

Pr 181 34.1 Km over Irrigation Channel

Patillas Municipio, Puerto Rico · rated Good in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (18.00734, -66.01596)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Culvert77Good condition

Bridge details

StructureConcrete culvert
Lengthabout 39 ft
LocationPr 181 at Km. 34.10
NBI structure number028691
Condition classGood
Traffic status (item 41)Open, no restriction
Last inspection (item 90)July 2024
Inspection interval (item 91)24 months
Scour (item 113)8: foundations stable, scour above the top of the footing

Source: FHWA National Bridge Inventory, 2025 data as reported by the Puerto Rico department of transportation.

Busiest bridges in Patillas Municipio

BridgeBuiltVehicles/dayCondition
Pr 3R 0.5 Km over Irrigation Channel198648,600Fair
Pr 3 over Grande De Patillas River200313,900Good
Pr-3 over Irrigation Channel200913,900Good
Pr 3 117.9 Km over Jacaboa River19419,100Poor
Pr 3 123.8 Km over Chico River19518,300Fair
Pr 53 over Grande De Patillas River19945,800Poor

All bridges nearby: Patillas Municipio, PR bridge conditions · every bridge in Patillas Municipio · Puerto Rico bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.