BridgeReportCard
Home › Washington › Snohomish County › SR 529 over Steamboat Slough

SR 529 over Steamboat Slough

Snohomish County, Washington · rated Fair in the 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

View this bridge on a map → (48.03489, -122.1815)

Component ratings

ComponentRating (2024)Rating (2025)FHWA scale meaning
Deck67Good condition
Superstructure55Fair condition
Substructure66Satisfactory condition

Bridge details

StructureSteel movable swing
Lengthabout 910 ft
Location6.3 N Jct SR 529 Spur
NBI structure number0004373A0000000
Condition classFair
Traffic status (item 41)Open, no restriction
Last inspection (item 90)July 2024
Inspection interval (item 91)24 months
Scour (item 113)3: scour critical: foundations unstable for the assessed or calculated scour
Fracture critical (item 92A)Yes

Source: FHWA National Bridge Inventory, 2025 data as reported by the Washington department of transportation.

Busiest bridges in Snohomish County

BridgeBuiltVehicles/dayCondition
I-5 over 212TH St SW196398,485Fair
I-5 over 212TH St SW196398,485Fair
I-5 over 52ND Ave W196398,485Good
I-5 over 52ND Ave W196398,485Fair
I-5 over Lowell Road195094,939Good
I-5 over Lowell Road196794,939Good

All bridges nearby: Snohomish County, WA bridge conditions · every bridge in Snohomish County · Washington bridges.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.