Bridge conditions in Fresno County, California
921 inventoried bridges · 2 closed · 18 posted · 35 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 921 bridges.
35 of the 921 bridges the federal inventory lists in Fresno County are rated poor; the rest split 363 good and 523 fair.
- 35 of the 921 bridges in Fresno County, California, are rated in poor condition (3.8%) in the 2025 National Bridge Inventory, as of .
- Fresno County has 2 bridges closed to all traffic and 18 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41); 1 more bridge is open only on temporary shoring or a temporary structure, or with a posting recommended.
- Since the 2024 inventory, 8 bridges dropped into poor condition and 7 bridges improved out of it; 54 bridges had at least one major component rating lowered, 1 newly load-posted.
- 2 bridges have a deck, superstructure, substructure or culvert rated 2 (critical) or lower, the bottom of FHWA's 0-9 scale.
- Inspection dates on record run from February 2020 to February 2025; 35 bridges over water are coded scour critical.
- 363 bridges (39.4%) are rated good and 523 (56.8%) fair.
- The median Fresno County bridge was built in 1967.
- The busiest poor-rated bridge is SR 180 WB over First Street (built 1999), carrying about 79,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Fresno County: inspector ratings, closures and load postings as reported by the California DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 39.4% · Fair 56.8% · Poor 3.8% of 921 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Millerton Road over Little Dry Creek | newly posted for load; good to poor; superstructure 7 to 4 | Good | Poor | 400 |
| SR 180 WB over First Street | fair to poor; deck 7 to 4 | Fair | Poor | 79,000 |
| W180-e168 Connectr over W180-cedar Ramp Maple Av | fair to poor; deck 6 to 4 | Fair | Poor | 26,500 |
| N Del Rey Ave over Fresno Canal | fair to poor; deck 7 to 6; superstructure 5 to 4; substructure up 5 to 6 | Fair | Poor | 700 |
| S Clovis Ave over Liberty Ditch | fair to poor; superstructure 5 to 4; substructure up 5 to 6 | Fair | Poor | 300 |
| E Clayton Ave over Travers Creek | fair to poor; superstructure 5 to 4; deck up 6 to 7; substructure up 5 to 6 | Fair | Poor | 200 |
| Winding Dirt Road over Rancheria Creek | fair to poor; superstructure 5 to 4 | Fair | Poor | 50 |
| Winding Road over Bear Creek | fair to poor; substructure 5 to 4 | Fair | Poor | 50 |
| E180-e168 Connectr over State Route 180 & Ramps | good to fair; deck 7 to 5 | Good | Fair | 25,000 |
| Peach Avenue over State Route 180 | good to fair; deck 7 to 5 | Good | Fair | 18,000 |
| State Route 41 SB over Church Avenue | good to fair; deck 7 to 5; superstructure 7 to 6; substructure up 7 to 8 | Good | Fair | 17,250 |
| SR 180 EB over Broadway | good to fair; superstructure 7 to 6 | Good | Fair | 49,500 |
| State Route 41 SB over Calif Golden St G Broad | good to fair; deck 7 to 6 | Good | Fair | 38,000 |
| State Route 41 NB over Calif Golden St G Broad | good to fair; deck 7 to 6 | Good | Fair | 38,000 |
| Tuolumne Street over State Route 99 | good to fair; superstructure 7 to 6 | Good | Fair | 7,200 |
| State Route 180 over Kings Slough | good to fair; deck 7 to 6; superstructure 7 to 6; substructure 7 to 6 | Good | Fair | 5,650 |
| W Mt Whitney Ave over Burrel Ditch | good to fair; substructure 7 to 6 | Good | Fair | 5,600 |
| State Route 180 over Four Mile Slough | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 5,400 |
| W Nees Ave over Outside Canal | good to fair; substructure 7 to 6 | Good | Fair | 3,600 |
| Auberry Rd over Little Sandy Creek | good to fair; culvert 7 to 6 | Good | Fair | 3,400 |
| E Behymer Ave over Enterprise Canal | good to fair; deck 7 to 6; superstructure up 7 to 8; substructure up 7 to 8 | Good | Fair | 3,000 |
| State Route 168 over Big Creek | good to fair; deck 7 to 6 | Good | Fair | 1,300 |
| E Central Ave over (wahtoke) Diversion Chan | good to fair; substructure 7 to 6 | Good | Fair | 870 |
| Tollhouse Rd over Dry Creek | good to fair; substructure 7 to 6 | Good | Fair | 600 |
| E Jefferson Ave over Wahtoke Creek | good to fair; deck 7 to 6; substructure up 7 to 8 | Good | Fair | 350 |
| S Westlawn Ave over Crescent Ditch | deck 7 to 4 | Poor | Poor | 50 |
| Winding Road over Kings River | substructure 6 to 4; superstructure up 4 to 5 | Poor | Poor | 115 |
| Clovis Avenue over State Route 180 | deck 7 to 5 | Fair | Fair | 50,000 |
| State Route 41 NB over Church Avenue | deck 7 to 5; superstructure up 5 to 6 | Fair | Fair | 17,250 |
| Huntington Lake Rd over Pitman Creek | superstructure 7 to 5 | Fair | Fair | 200 |
| Winding Road over Basin Creek | substructure 7 to 5 | Poor | Poor | 50 |
| State Route 168 over Little Dry Creek | superstructure 7 to 6; substructure 6 to 5 | Fair | Fair | 4,300 |
| State Route 180 over South Fork Kings River | substructure 6 to 5; superstructure up 7 to 8 | Fair | Fair | 730 |
| Winding Road over N.fork Kings River | deck 6 to 5 | Fair | Fair | 120 |
| Winding Road over No Data Entered | superstructure 6 to 5 | Fair | Fair | 50 |
| Winding Road over Bear Creek | deck 6 to 5; superstructure up 5 to 6 | Fair | Fair | 50 |
| Winding Road over South Fork San Joaquin | superstructure 6 to 5; substructure 6 to 5; deck up 5 to 6 | Fair | Fair | 50 |
| Winding Road over Upper Chinquapin | deck 7 to 6; substructure 6 to 5 | Fair | Fair | 50 |
| S41-s99 Connector over SR 99 & N41-n99 Connectr | deck 7 to 6; superstructure up 5 to 7 | Fair | Fair | 21,300 |
| State Route 41 over Murphy Slough | deck 7 to 6; superstructure 7 to 6; substructure up 5 to 6 | Fair | Fair | 19,500 |
Showing the 40 largest of 54 changes (closures, drops into poor and the biggest rating drops first). Every bridge's own page shows its 2024 and 2025 ratings side by side.
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| State Route 99 over Mckinley Ave | fair to good; substructure up 6 to 7 | Fair | Good | 112,000 |
| State Route 41 NB over Friant Road | fair to good; deck up 6 to 7 | Fair | Good | 54,500 |
| SR 180 EB over G Street | fair to good; deck up 5 to 7 | Fair | Good | 49,500 |
| State Route 180 EB over BNSF Ry & Amtrak | poor to fair; deck up 4 to 7; superstructure up 4 to 7 | Poor | Fair | 49,500 |
| West Ashlan Ave over Golden State Rail Weber | fair to good; deck up 5 to 7 | Fair | Good | 37,000 |
| Jensen Ave over State Route 41 | poor to fair; deck up 4 to 6; superstructure up 5 to 6 | Poor | Fair | 31,600 |
| State Route 41 SB over SR 99 N41-n99 S41-s99 | fair to good; deck up 6 to 7 | Fair | Good | 17,250 |
| E. Barstow Ave over Dry Creek Canal | fair to good; culvert up 6 to 7 | Fair | Good | 11,800 |
| State Route 145 over California Aqueduct | fair to good; superstructure up 7 to 8; substructure up 5 to 7 | Fair | Good | 4,600 |
| North Fork Road over San Joaquin River | fair to good; deck up 6 to 7; superstructure up 7 to 8; substructure up 5 to 7 | Fair | Good | 4,300 |
| E Annadale Ave over C & K Canal | poor to fair; deck up 4 to 5; superstructure up 4 to 5 | Poor | Fair | 2,982 |
| N Piedra Road over Unnamed Ditch | fair to good; culvert up 6 to 7 | Fair | Good | 2,400 |
| N Piedra Rd over Byrd Slough | fair to good; culvert up 6 to 7 | Fair | Good | 1,700 |
| N Piedra Rd over Friant-kern Canal | fair to good; superstructure up 5 to 7 | Fair | Good | 1,700 |
| Lincoln Avenue over State Route 41 | fair to good; substructure up 5 to 7 | Fair | Good | 1,680 |
The 15 busiest of 24 improvements.
9 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 4 structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| N Chateau Fresno over Houghton Canal | closed | 1925 | 500 | January 2024 | Poor |
| Winding Road over Balsam Creek | closed | 1959 | 50 | August 2024 | Poor |
| Stanislaus Street over UP RR G Street & H St | posted for load | 1958 | 5,403 | January 2025 | Fair |
| E Shaw Ave over Fancher Creek | posted for load | 1947 | 900 | February 2025 | Fair |
| N Del Rey Ave over Fresno Canal | posted for load | 1939 | 700 | January 2025 | Poor |
| Millerton Road over Little Dry Creek | posted for load | 1925 | 400 | January 2025 | Poor |
| S Clovis Ave over Liberty Ditch | posted for load | 1942 | 300 | January 2025 | Poor |
| Lost Hills Ave over Jacalitos Creek | posted for load | 1940 | 290 | October 2023 | Fair |
| N Viau Ave over Fresno Canal | posted for load | 1925 | 250 | February 2025 | Fair |
| S Tiburcio Ave over Grant Canal | posted for load | 1937 | 210 | January 2024 | Fair |
| E Clayton Ave over Travers Creek | posted for load | 1941 | 200 | November 2024 | Poor |
| N Fancher Ave over Mill Ditch | posted for load | 1939 | 200 | January 2025 | Poor |
| Porter Ave over Wahtoke Creek | posted for load | 1949 | 200 | November 2023 | Fair |
| Pine Flat Dam over Kings River D/s of Dam | posted for load | 1956 | 175 | September 2023 | Fair |
| S Bishop Ave over Crescent Ditch | posted for load | 1950 | 125 | December 2024 | Fair |
| Winding Road over Kings River | posted for load | 1946 | 115 | August 2024 | Poor |
| Winding Road over Dinkey Creek | posted for load | 1938 | 110 | August 2024 | Poor |
| Dirt Road over Big Creek | posted for load | 1936 | 50 | August 2024 | Fair |
| Winding Road over Nutmeg Creek | posted for load | 1967 | 50 | August 2024 | Fair |
| Winding Road over Upper Chinquapin | posted for load | 1948 | 50 | September 2024 | Fair |
| Little Panoche Rd over Little Panoche Creek | open on temporary shoring | 1935 | 230 | October 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the California department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 8 on 12 months or less, 719 on 24 months, 194 on 48 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Fresno County is dated February 2025; 166 bridges have an inspection dated in 2025.
Scour critical (item 113): 35 bridges; 2 over water not yet evaluated for scour; 39 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 28 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
Bridges with a component rated 2 or lower
2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| S Walnut Ave over Riverdale Ditch | open | 1940 | 200 | January 2024 | Poor |
| Winding Road over Balsam Creek | closed | 1959 | 50 | August 2024 | Poor |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| E180-e168 Connect over SR 41-e180 Connect | 2014 | 115,000 | Good |
| State Route 99 over Mckinley Ave | 1955 | 112,000 | Good |
| State Route 99 over S 99 Offramp to Motel Dr | 1955 | 112,000 | Fair |
| State Route 41 over Dry Creek Canal | 1980 | 111,000 | Fair |
| State Route 41 over Herndon Canal | 1980 | 111,000 | Good |
| State Route 180 over Future Rail Tracks Chsra | 2020 | 108,000 | Good |
| State Route 99 over Jensen Ave | 1963 | 96,000 | Good |
| State Route 99 over Nielsen Houghton Canal | 1956 | 85,000 | Good |
| W168-w180 Connect over W180-sr 41 Connect | 2014 | 84,000 | Fair |
| SR 180 WB over First Street | 1999 | 79,000 | Poor |
Frequently asked questions
Are any bridges closed in Fresno County, California?
2 bridges of the 921 in Fresno County are coded closed to all traffic in the 2025 National Bridge Inventory, and 18 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the California department of transportation.
Have any bridges failed in Fresno County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Fresno County: 2 bridges with a component rated 2 (critical) or lower, 35 bridges rated poor overall, and 8 bridges that dropped into poor condition since the 2024 inventory.
When were bridges in Fresno County last inspected?
Inspection dates in the 2025 inventory for Fresno County run from February 2020 to February 2025. Intervals: 8 on 12 months or less, 719 on 24 months, 194 on 48 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Fresno County → - all 921, busiest first, each with its own condition record.
All of California: California bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.