Bridge conditions in Brevard County, Florida
250 inventoried bridges · 0 closed · 4 posted · 1 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 250 bridges.
1 of the 250 bridges the federal inventory lists in Brevard County are rated poor; the rest split 123 good and 126 fair.
- 1 of the 250 bridges in Brevard County, Florida, are rated in poor condition (0.4%) in the 2025 National Bridge Inventory, as of .
- Brevard County has no bridges closed to all traffic and 4 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 12 bridges had at least one major component rating lowered.
- Inspection dates on record run from March 2023 to February 2025; 2 bridges over water are coded scour critical.
- 123 bridges (49.2%) are rated good and 126 (50.4%) fair.
- The median Brevard County bridge was built in 1972.
- The busiest poor-rated bridge is US-1 over City St. & Crane Creek (built 1959), carrying about 37,000 vehicles a day.
What this page is: the federal bridge inspection inventory for Brevard County: inspector ratings, closures and load postings as reported by the Florida DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 49.2% · Fair 50.4% · Poor 0.4% of 250 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| US-1 over City St. & Crane Creek | fair to poor; superstructure 6 to 4 | Fair | Poor | 37,000 |
| SR-528 EB 41.43 over Pine Street | good to fair; superstructure 7 to 5 | Good | Fair | 22,000 |
| Banana River Drive over Banana River | good to fair; superstructure 7 to 5 | Good | Fair | 2,569 |
| I-95 NB over SR-524 | good to fair; deck 7 to 6 | Good | Fair | 41,750 |
| SR-528 over Sykes Creek | good to fair; deck 7 to 6 | Good | Fair | 15,250 |
| SR-520 WB over Indian River | good to fair; deck 7 to 6; superstructure 7 to 6 | Good | Fair | 11,000 |
| Fay Blvd. over I-95 | good to fair; deck 7 to 6 | Good | Fair | 8,000 |
| US-192 EB over St Johns River | good to fair; substructure 7 to 6 | Good | Fair | 5,150 |
| SR-528 over Indian River | deck 7 to 6 | Fair | Fair | 28,199 |
| SR-404 WB over Indian River | deck 7 to 6 | Fair | Fair | 23,250 |
| SR-404 WB over Banana River | deck 7 to 6 | Fair | Fair | 23,000 |
| SR-404 EB over Banana River | deck 7 to 6; superstructure 7 to 6 | Fair | Fair | 23,000 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Malabar Rd over Melb Tillman Canal 37 | fair to good; deck up 5 to 7; superstructure up 5 to 7 | Fair | Good | 23,000 |
| I-95 NB over SR-406 | poor to fair; superstructure up 4 to 7 | Poor | Fair | 22,250 |
2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and 1 structure listed in 2024 is no longer listed under its number (replaced, removed or renumbered).
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Fountainhead Blvd. over Crane Creek Canal L-7 | posted for load | 1950 | 3,012 | December 2023 | Good |
| Dubber Road over Crane Creek | posted for load | 1960 | 1,008 | December 2023 | Fair |
| Girard Blvd. over Nav. Banana River Canal | posted for load | 1962 | 607 | February 2024 | Fair |
| Spotted Fawn Way over Drainage Ditch | posted for load | 1978 | 200 | January 2024 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Florida department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 249 on 24 months, 1 on other. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Brevard County is dated February 2025; 34 bridges have an inspection dated in 2025.
Scour critical (item 113): 2 bridges; 10 with unknown foundations. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 7 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Banana River Drive over Banana River | open | 1927 | 2,569 | March 2024 | Fair |
| Patti Drive over Canal | open | 1977 | 322 | February 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| US-1 over City St. & Crane Creek | 1959 | 37,000 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| I-95 over Fiske Canal | 1965 | 98,506 | Fair |
| I-95 over Milners Canal | 1964 | 96,000 | Fair |
| I-95 over Brushy Canal | 1965 | 95,500 | Fair |
| I-95 over Palm Canal | 1965 | 95,500 | Fair |
| I-95 over Rockledge Creek | 1965 | 94,085 | Fair |
| I-95 over Rockledge Canal | 1965 | 94,085 | Fair |
| I-95 over Beamers Ditch | 1987 | 94,084 | Fair |
| I-95 over Wickham Road | 2009 | 88,000 | Fair |
| I-95 over US-192 | 2009 | 65,000 | Good |
| I-95 over Addison Canal | 2013 | 57,000 | Good |
Frequently asked questions
Are any bridges closed in Brevard County, Florida?
No bridges of the 250 in Brevard County are coded closed to all traffic in the 2025 National Bridge Inventory, and 4 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Florida department of transportation.
Have any bridges failed in Brevard County?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Brevard County: no bridges with a component rated 2 (critical) or lower, 1 bridge rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Brevard County last inspected?
Inspection dates in the 2025 inventory for Brevard County run from March 2023 to February 2025. Intervals: 249 on 24 months, 1 on other. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Brevard County → - all 250, busiest first, each with its own condition record.
All of Florida: Florida bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.