Bridge conditions in Aguadilla Municipio, Puerto Rico
13 inventoried bridges · 1 closed · 7 posted · 4 rated poor · 2025 National Bridge Inventory
United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled
GoodFairPoor All 13 bridges.
Aguadilla Municipio has 4 bridges rated poor out of 13 inventoried, a 30.8% share that puts it well above the national rate of about 7%.
- 4 of the 13 bridges in Aguadilla Municipio, Puerto Rico, are rated in poor condition (30.8%) in the 2025 National Bridge Inventory, as of .
- Aguadilla Municipio has 1 bridge closed to all traffic and 7 bridges posted with load restrictions in the 2025 National Bridge Inventory (NBI item 41).
- Since the 2024 inventory, 1 bridge dropped into poor condition and 1 bridge improved out of it; 3 bridges had at least one major component rating lowered, 1 was newly closed.
- Inspection dates on record run from January 2023 to February 2025; 3 bridges over water are coded scour critical.
- 2 bridges (15.4%) are rated good and 7 (53.8%) fair.
- The median Aguadilla Municipio bridge was built in 1960.
- The busiest poor-rated bridge is Pr 2 NORTB131.3 Km over Culebrinas River (built 1996), carrying about 17,950 vehicles a day.
What this page is: the federal bridge inspection inventory for Aguadilla Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.
Good 15.4% · Fair 53.8% · Poor 30.8% of 13 bridges
What changed since the 2024 inventory
Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.
Bridges whose rating or status got worse
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 418 0.6 Km over Culebrinas River | newly closed | Poor | Poor | 4,100 |
| Pr 466 2.3 Km over Isabela Irrigation Chan. | fair to poor; deck 5 to 4; superstructure 6 to 4 | Fair | Poor | 800 |
| Pr 418 0.2 Km over Channel | substructure 4 to 3 | Poor | Poor | 4,100 |
| Pr 2 127.6 Km over Acess to Pr-2 | deck 8 to 7; superstructure 8 to 7 | Good | Good | 43,000 |
Bridges that improved
| Bridge | What changed | 2024 | 2025 | Vehicles/day |
|---|---|---|---|---|
| Pr 458 1.5 Km over Playuela Channel | poor to fair; deck up 4 to 5 | Poor | Fair | 700 |
Closed and load-posted bridges
Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 418 0.6 Km over Culebrinas River | closed | 1928 | 4,100 | February 2024 | Poor |
| Pr 115 27.4 Km over Madre Vieja Channel | posted for load | 1951 | 17,200 | October 2024 | Fair |
| Pr 110 over Pr 459 | posted for load | 1942 | 16,500 | January 2023 | Fair |
| Pr 466 2.3 Km over Isabela Irrigation Chan. | posted for load | 1930 | 800 | October 2024 | Poor |
| Pr 458 1.5 Km over Playuela Channel | posted for load | 1939 | 700 | July 2024 | Fair |
| Ramp to Parking over Munoz Rivera Street | posted for load | 1982 | 500 | November 2024 | Good |
| Pr 4439 0.5 Km over Madre Vieja Channel | posted for load | 1921 | 400 | October 2024 | Fair |
| Off Pr 115 over Guama Creek | posted for load | 1960 | 250 | February 2023 | Fair |
Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.
Inspections, scour and other flags
Routine inspection intervals (NBI item 91): 6 on 12 months or less, 7 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).
The most recent inspection on record in Aguadilla Municipio is dated February 2025; 1 bridges have an inspection dated in 2025.
Scour critical (item 113): 3 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): none.
Scour-critical bridges
| Bridge | Status (item 41) | Built | Vehicles/day | Last inspected | Condition |
|---|---|---|---|---|---|
| Pr 418 0.2 Km over Channel | open | 1960 | 4,100 | February 2025 | Poor |
| Pr 418 0.6 Km over Culebrinas River | closed | 1928 | 4,100 | February 2024 | Poor |
| Pr 458 1.5 Km over Playuela Channel | posted for load | 1939 | 700 | July 2024 | Fair |
Bridges rated poor
Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 NORTB131.3 Km over Culebrinas River | 1996 | 17,950 | Poor |
| Pr 418 0.6 Km over Culebrinas River | 1928 | 4,100 | Poor |
| Pr 418 0.2 Km over Channel | 1960 | 4,100 | Poor |
| Pr 466 2.3 Km over Isabela Irrigation Chan. | 1930 | 800 | Poor |
Busiest bridges in the county
| Bridge | Built | Vehicles/day | Condition |
|---|---|---|---|
| Pr 2 127.6 Km over Acess to Pr-2 | 2012 | 43,000 | Good |
| Pr 2 130.45 over Pr 111 0.01 | 1996 | 35,900 | Fair |
| Pr 2 over Culebrinas River | 1998 | 35,900 | Fair |
| Pr 2 NORTB131.3 Km over Culebrinas River | 1996 | 17,950 | Poor |
| Pr 115 27.4 Km over Madre Vieja Channel | 1951 | 17,200 | Fair |
| Pr 110 over Pr 459 | 1942 | 16,500 | Fair |
| Pr 418 0.6 Km over Culebrinas River | 1928 | 4,100 | Poor |
| Pr 418 0.2 Km over Channel | 1960 | 4,100 | Poor |
| Pr 466 2.3 Km over Isabela Irrigation Chan. | 1930 | 800 | Poor |
| Pr 458 1.5 Km over Playuela Channel | 1939 | 700 | Fair |
Frequently asked questions
Are any bridges closed in Aguadilla Municipio, Puerto Rico?
1 bridge of the 13 in Aguadilla Municipio is coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.
Have any bridges failed in Aguadilla Municipio?
The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Aguadilla Municipio: no bridges with a component rated 2 (critical) or lower, 4 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.
When were bridges in Aguadilla Municipio last inspected?
Inspection dates in the 2025 inventory for Aguadilla Municipio run from January 2023 to February 2025. Intervals: 6 on 12 months or less, 7 on 24 months. Most bridges must be inspected at least every 24 months.
Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.
Every bridge in Aguadilla Municipio → - all 13, busiest first, each with its own condition record.
All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.
Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.