Bridge conditions in Aibonito Municipio, Puerto Rico

17 inventoried bridges · 0 closed · 7 posted · 5 rated poor · 2025 National Bridge Inventory

United States Bridge Conditions2025 National Bridge Inventory, FHWACompiled

GoodFairPoor All 17 bridges (1 without coordinates in the inventory is not shown).

Of the 17 Aibonito Municipio bridges in the federal inventory, 5 carry a poor rating. That 29.4% share is roughly 4x the national average.

What this page is: the federal bridge inspection inventory for Aibonito Municipio: inspector ratings, closures and load postings as reported by the Puerto Rico DOT for the 2025 inventory. It is not a log of incidents, failures or news events.

Good 11.8% · Fair 58.8% · Poor 29.4% of 17 bridges

What changed since the 2024 inventory

Each bridge's 2025 record compared with its 2024 record under the same structure number: condition class, the 0-9 component ratings, and whether it is open, posted or closed. These are changes in inspection ratings, not reports of incidents.

1
dropped into poor
since 2024
0
improved out of poor
since 2024
2
had a rating lowered
deck, superstructure, substructure or culvert
0
newly closed or posted
0 closed, 0 posted

Bridges whose rating or status got worse

BridgeWhat changed20242025Vehicles/day
Off Pr 173 over Grande Creekreopened; fair to poor; substructure 6 to 4FairPoor150
Brisa Aibonito St over Unnamed Creeksuperstructure 7 to 6FairFair7,600

Bridges that improved

BridgeWhat changed20242025Vehicles/day
Pr 7718 over Waterwayload posting removedGoodGood5,300

2 structures in the 2025 inventory do not appear in 2024 under the same number (new or renumbered), and no structures listed in 2024 are no longer listed under their number (replaced, removed or renumbered).

Closed and load-posted bridges

Bridges coded closed, posted for load, or open only with temporary measures in NBI item 41. A load posting limits the weight a bridge may carry; it is how owners keep a weakened bridge in service safely.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 725 over Aibonito Riverposted for load194012,400December 2023Fair
Pr 725 4.2 Km over Aibonito Riverposted for load19708,900June 2024Poor
Pr 722 7.2 Km over Aibonito Riverposted for load19437,600February 2024Fair
Pr 724 over Aibonito Riverposted for load19604,300October 2023Fair
Off Pr-716 at 1.20 over Cuyon Riverposted for load20111,000May 2023Fair
Pr 716 over Cuyon Riverposted for load19631,000October 2023Fair
Off Pr 173 over Honda Creekposted for load1960100May 2024Poor
Pr 14 57.2 Km over Honda Creekopen on a temporary structure18916,400August 2024Poor
Pr 7718 over Waterwayopen, posting recommended19705,300October 2023Good
Off Pr 173 over Grande Creekopen, posting recommended1977150March 2025Poor

Status is as reported for the federal inventory, not live. Closures and postings made since then are published by the Puerto Rico department of transportation and the county road department.

Inspections, scour and other flags

Routine inspection intervals (NBI item 91): 5 on 12 months or less, 12 on 24 months. Federal rules set 24 months as the regular maximum, require 12 months or less for bridges with a component rated 3 or lower, and allow up to 48 months for bridges in good shape (23 CFR 650.311).

The most recent inspection on record in Aibonito Municipio is dated March 2025; 1 bridges have an inspection dated in 2025.

Scour critical (item 113): 7 bridges. Scour critical means the foundations were found unstable for the assessed or calculated scour, the streambed erosion that floods cause around piers and abutments. Fracture critical (item 92A): 3 bridges. These have steel tension members without a redundant load path and get their own scheduled inspections.

Scour-critical bridges

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Off Pr 725 Km 2.6 over Rio Aibonitoopen20108,900August 2024Poor
Pr 725 4.2 Km over Aibonito Riverposted for load19708,900June 2024Poor
Pr 14 57.2 Km over Honda Creekopen on a temporary structure18916,400August 2024Poor
Pr 14 57.2 Km over Honda Creekopen18916,400August 2024Fair
F Degeta St 0.1 Km over Waterwayopen19751,100November 2023Fair
Pr 727 over Honda Riveropen19921,000August 2023Fair
Off Pr 173 over Grande Creekopen, posting recommended1977150March 2025Poor

Bridges with a component rated 2 or lower

2 is critical, 1 imminent failure, 0 failed and out of service on FHWA's scale. Most such bridges are closed or posted.

BridgeStatus (item 41)BuiltVehicles/dayLast inspectedCondition
Pr 14 57.2 Km over Honda Creekopen on a temporary structure18916,400August 2024Poor

Bridges rated poor

Every bridge in the county with a poor rating, busiest first. Poor means a major component is rated 4 or lower on FHWA's 0-9 scale; it is a repair flag, not a closure notice.

BridgeBuiltVehicles/dayCondition
Pr 725 4.2 Km over Aibonito River19708,900Poor
Off Pr 725 Km 2.6 over Rio Aibonito20108,900Poor
Pr 14 57.2 Km over Honda Creek18916,400Poor
Off Pr 173 over Grande Creek1977150Poor
Off Pr 173 over Honda Creek1960100Poor

Busiest bridges in the county

BridgeBuiltVehicles/dayCondition
Pr 173 over La Plata River199813,800Good
Pr 725 over Aibonito River194012,400Fair
Pr 725 4.2 Km over Aibonito River19708,900Poor
Off Pr 725 Km 2.6 over Rio Aibonito20108,900Poor
Pr 722 7.2 Km over Aibonito River19437,600Fair
Brisa Aibonito St over Unnamed Creek19877,600Fair
Pr 14 57.2 Km over Honda Creek18916,400Poor
Pr 14 57.2 Km over Honda Creek18916,400Fair
Pr 7718 over Waterway19705,300Good
Pr 724 over Aibonito River19604,300Fair

Frequently asked questions

Are any bridges closed in Aibonito Municipio, Puerto Rico?

No bridges of the 17 in Aibonito Municipio are coded closed to all traffic in the 2025 National Bridge Inventory, and 7 bridges are posted with load restrictions. The inventory is compiled annually; for closures since then, check the Puerto Rico department of transportation.

Have any bridges failed in Aibonito Municipio?

The National Bridge Inventory records inspection ratings, not incidents, so it cannot say whether a bridge failed or made the news. What it does record for Aibonito Municipio: 1 bridge with a component rated 2 (critical) or lower, 5 bridges rated poor overall, and 1 bridge that dropped into poor condition since the 2024 inventory.

When were bridges in Aibonito Municipio last inspected?

Inspection dates in the 2025 inventory for Aibonito Municipio run from May 2023 to March 2025. Intervals: 5 on 12 months or less, 12 on 24 months. Most bridges must be inspected at least every 24 months.

Source: FHWA National Bridge Inventory, 2025 (compared with 2024). Counts cover inventoried highway bridges over 20 feet; ratings are reported by the state DOT.

Every bridge in Aibonito Municipio → - all 17, busiest first, each with its own condition record.

All of Puerto Rico: Puerto Rico bridge conditions by county · closed and posted bridges nationwide · every download on the data page.

Background: how bridge ratings work · what "poor" and "structurally deficient" actually mean · how often bridges are inspected.